2015 RTP Update January, 2015.

Slides:



Advertisements
Similar presentations
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
ERCOT Planning Overview and Summer 2014 Assessments Update
Public Service Company of New Mexico
Generation Adequacy Task Force Results of the 2012 Loss of Load Study January 18, 2013.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
ERCOT PUBLIC 10/21/ RTP Update October 21, 2014.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
ERCOT PUBLIC 10/21/ RTP Scope and Process Review October 21, 2014.
ERCOT PUBLIC 10/21/ LTSA Update October 21, 2014.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
RPG Meeting Five Year Plan Extension Brad Schwarz.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions-Updated April 22, 2014.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
ERCOT PUBLIC 4/22/ RTP Inputs and Assumptions April 22, 2014.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
ERCOT PUBLIC 6/17/ LTSA Load Distribution Methodology June 17, 2014.
2016 Long-Term Load Forecast
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Temperature Assumptions for Dynamic Ratings in ERCOT CRR Auctions Proposal to differentiate between Day (PeakWD & PeakWE) and Night (Off-peak) October.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
ERCOT Transmission Planning Overview
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Economic Forecast Review
Freeport Area Master Plan Project -
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
2016 RTP Update June, 2016 RPG Meeting.
Transmission Planning in ERCOT- Overview
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
ERCOT 2011 Five-Year Transmission Plan Update
ERCOT 2009 Five-Year Transmission Plan Update
Southern Cross Directives Planning Items
Study Scope - Quarterly Stability Assessment
Presentation transcript:

2015 RTP Update January, 2015

Outline 2015 RTP Overview 2015 RTP Scope 2015 RTP Input Assumptions Next steps

2015 RTP Overview: Cases studied Summer peak reliability basecase for years 2016, 2018, 2020, and 2021 Off-peak (min load) reliability basecase for 2018 Sensitivity cases for summer peak cases of years 2016 and 2020 Sensitivity cases for off-peak case for 2018.

2015 RTP Overview: Analysis SCOPF Contingency analysis (Single event) Multiple element contingency analysis G(generator)-1+N-1 X(transformer)-1+N-1 N-1-1 and cascade analysis Short circuit analysis Analysis of sensitivity cases Economic analysis

RTP Scope RTP scope and process document and responses to comments are posted on the RPG meeting page Outstanding items on the RTP Scope document Details regarding short circuit analysis Details regarding sensitivity cases Noteworthy updates from 2014 scope Updated performance criteria per TPL-001-4 Dynamic ratings to be used in reliability analysis

Dynamic Ratings in Reliability Analysis Weather Zone 90th percentile temperature (°F) Coast 102.4 East 106.2 Far West 110.4 North Central 108.4 North 109.0 South Central 105.5 South 104.0 West 107.3 90th percentile temperature for each weather zone was derived based on 30 years of temperature data (1984-2013) Temperature data based on historical data from ERCOT databases

RTP Load by weather zone RTP weather zone load based on the ‘higher-of’ SSWG summer peak weather zone load and ERCOT 90th percentile load forecast Zones where ERCOT 90th percentile forecast is higher are presented in red font Year Coast East North North Central South Central South West Far West NCP Total 2016 26,084 2,771 1,749 26,300 13,094 6,540 2,257 3,124 81,920 2018 26,883 2,822 1,803 27,003 13,803 6,913 2,314 3,453 84,994 2020 27,522 2,894 1,848 27,690 14,479 7,284 2,390 3,656 87,763 2021 27,766 2,921 1,764 28,034 14,845 7,470 2,429 3,764 88,993 Note: Weather zone loads expressed in MW

Next steps Create and publish RTP reliability start cases Conduct N-1 SCOPF and contingency analysis Post contingency definitions and resulting violations Corrective action plans such as transmission upgrades or additions will be tested in collaboration with respective transmission owners Create and post N-1 Secure case Conduct G-1+N-1 and X-1+N-1 screen and identify corrective action plans to address violations

Questions?

Appendix

SSWG load Load based on October 2014 SSWG Data Set B cases Includes self served load, does not include losses Year Coast East North North Central South Central South West Far West NCP Total 2016 26,084 2,771 1,749 24,695 13,094 6,397 2,257 3,124 80,171 2017 26,446 2,795 1,766 24,968 13,447 6,475 2,280 3,322 81,499 2018 26,883 2,822 1,803 25,322 13,803 6,792 2,314 3,453 83,191 2019 27,228 2,849 1,826 25,604 14,131 6,802 2,352 3,565 84,356 2020 27,522 2,894 1,848 25,910 14,479 7,078 2,390 3,656 85,777 2021 27,766 2,921 1,764 26,314 14,845 7,222 2,429 3,764 87,024 Note: Weather zone loads expressed in MW

ERCOT 90th percentile load forecast Includes self served load, does not include losses Year Coast East North North Central South Central South West Far West NCP Total 2016 23,133 2,347 1,573 26,300 11,977 6,540 2,015 2,715 76,601 2017 23,335 2,354 1,563 26,654 12,060 6,728 2,035 2,832 77,561 2018 23,537 2,360 1,554 27,003 12,141 6,913 2,054 2,949 78,511 2019 23,739 2,367 1,544 27,348 12,221 7,099 2,074 3,065 79,456 2020 23,937 2,373 1,534 27,690 12,300 7,284 2,094 3,181 80,393 2021 24,141 2,380 1,525 28,034 12,378 7,470 2,114 3,297 81,338 Note: Weather zone loads expressed in MW

Wind dispatch output levels Dispatch based on confidence-percentile analysis Hours with high loads were selected (Hours were ERCOT load higher than 95th percentile Wind output levels in the basecase based on 15th percentile output levels, but not to exceed levels based on 25th percentile level Weather Zone Basecase Dispatch Not to exceed Coast 1% 4% East - North 3% 8% North Central South Central 2% Southern 10% 18% West 7%

New generation per PG 6.9 requirements Project Name In-service Date Capacity Added* (MW) Fuel County TDSP Weather Zone Baytown Chiller 6/1/2015 270 Gas Chambers Centerpoint COAST PHR Peakers 11/30/2015 390 Galveston Panda Temple 2 G 8/1/2015 790 Bell Oncor NORTH Antelope Station 6/1/2016 359** Hale Sharyland Goldsmith Peakers 341 Ector WEST Keechi Wind 138 kV Joplin 1/5/2015 102 Wind Jack BRAZOS Grandview Phase II (Conway Windfarm) 10/1/2015 389 Carson Shalyland Jumbo Road Wind 4/15/2015 300 Castro Route66 Wind 8/15/2015 150 Randall Spinning Spur Wind Three 5/31/2015 194 Oldham Midway Wind 12/28/2016 161 San Patricio AEP SOUTH Cameron County Wind 9/1/2015 165 Cameron STEC Patriot (Petronilla) Wind 178 Nueces Sendero Wind 8/31/2015 78 Jim Hogg Los Vientos III 3/31/2015 200 Starr Javelina Wind 12/31/2015 250 Zapata Los Vientos V 12/15/2015 Los Vientos IV Mesquite Creek W 211 Borden WETT South Clay Windfarm 6/15/2015 Clay ONCOR Stephens Ranch Wind Energy Phase b 4/1/2015 Green Pastures W 2/17/2015 Knox Rattlesnake Wind Ph 1 Glasscock Longhorn Energy Center 361 Briscoe South Plains Wind I 7/31/2015 Floyd South Plains II 12/1/2015 Wake Wind 11/1/2015 299 Dickens Briscoe Wind *Based on Generator Interconnection data **Capacity not available to ERCOT throughout summer