Philae Science Team Meeting Venice, 30 Mar. – 1 Apr. 2009 Rita Schulz - Rosetta - Mission Status.

Slides:



Advertisements
Similar presentations
The BepiColombo Mission
Advertisements

Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
An insertion burn at local noon has the advantage that the spacecraft is kicked into a 11 resonant orbit, with an inexpensive recovery manoeuvre, if the.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
MEPAG National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California Presentation to MEPAG.
Minor bodies observation from Earth and space: asteroid (2867)Steins A. Coradini, M.T. Capria, F. Capaccioni, and the VIRTIS International Team.
Philae Science team meeting. Venezia, March 30, 31, April 1, 2009Palazzo Cavalli Franchetti.
Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status Final discussion and wrap-up.
Open Cruise Requirements status and planning LSWT#4, Venice 30/03-01/ LSWT#4.
PHILAE Science Team, Venice LTS phase: the LS standpoint prepared by HBO LTS phase: from end of FSS (mid Nov. 2014) to end of Rosetta mission (31.
Philae Status and News Venezia; 30 st of March th Philae Post-Launch Workshop.
SWT 27/11/ Consert W.Kofman, A. Herique, JP. Goutail, A. Roux.
Lunar CRater Observation and Sensing Satellite Project LCROSS Site Selection Workshop Oct , 2006 NASA/ARC, Mountain View, California LCROSS Orbital.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
Some slides from official ESA press conference held on jun Annotations in orange boxes are not official from ESA.
Bits and Pieces. Spacecraft Systems Propulsion –Already discussed Communications Science instruments Power.
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Deep Impact Continued Investigations (DI3) Tony Farnham.
Bone Trajectories and Model Simulations Kathleen Mandt, Ray Goldstein, Christoph Koenders May 29, 2013 IES Team Meeting – San Antonio.
MMO-SWG #3[Mar ] BepiColombo Project & MMO Science Schedule H. Hayakawa, Y. Kasaba, M. Kato, T Mukai, and JAXA BepiColombo Project.
Solar Orbiter Mission (ESA) - The near-Sun phase  approach the Sun as close as 48 solar radii (~0.22 AU). At these distances, the angular speed of a spacecraft.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda Item # CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
Issue/Revision: 1.0 Reference: Status: For information Only ESA UNCLASSIFIED - For Official Use Solar Orbiter: Launch Options Favouring Data.
XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel.
Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs.
PHILAE Science Team, Venice Philae On-Comet Science Objectives prepared by HBO Document name = Scientific Objectives of the PHILAE Mission (RO-LAN-LI-1000),
CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009 Philae Science Team Meeting.
ADASS the Planning and Scheduling Perspective Roadmap: - How planning and scheduling fits in at ADASS - ADASS planning and scheduling posters and presentations.
S. Frey, UCB, THEMIS 1 25th ISSFD, Munich, Germany, Oct.19-23, 2015 ARTEMIS THEMIS ARTEMIS The Revised Concept of the THEMIS and MMS Coordination Sabine.
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
Background  EM16 SGS+TEC met with FD 1 year ago  Both sides agreed that there was a “performance gap:  SGS prepared a TN with 2 main options to bridge.
SMOS Science Meeting September 2011 Arles, FR Simulating Aquarius by Resampling SMOS Gary Lagerloef, Yann Kerr & Eric Anterrieu and Initial Results.
Second GOES Users Conference, Boulder October 1-3, Issue B Page 1 ACTIVITIES TOWARDS USER REQUIREMENTS FOR POST-MSG by R. Stuhlmann GOES Users.
Workshop proposal to ISSI Quantifying the Martian Geochemical reservoirs.
WG 2/3 Splinter meeting Dec. 6, 2010 ESOC Darmstadt for WG2 & WG3: D. Bockelée-Morvan C. Engrand E. Grün H. Krueger.
Lunar CRater Observation and Sensing Satellite Project LCROSS Astronomer Workshop Feb. 29, 2008 NASA/ARC, Mountain View, California Mission Design & Observation.
Belgian User Support and Operations Centre B.USOC SOLAR Operations Concept and Services SOLSPEC Workshop 10 March 2015 BIRA/IASB.
Workshop proposal to the Science Committee Solar Wind – Comet Surface Interaction.
Rosetta Science Working Team Meeting #26 Working Group #1
19 May 2010, ESOC Eberhard Grün and Harald Krüger
RSOC Overview at SWT #26, 11/12 June 2009
OSIRIS Solar System Simulator
JUpiter Icy Moons Explorer (JUICE)
Rosetta Status Mike A’Hearn.
OSIRIS operation summary
OSIRIS operation summary
ROSETTA SWT 27th ESOC, 2-4 December 2009
Max-Planck-Institut für Sonnensystemforschung
Charles Acton NAIF Manager JPL July 18, 2007
WG1 Report Osiris Lander delivery Support and Science activities during Comet approach.
Dear Andrea,  Regarding the discussion at the closed SWT, we would like to pose the following question to flight dynamics to clarify the situation on lander.
Pre-landing Orbiter Observations
Lutetia Flyby Rosetta Radio Science Investigations RSI
Defining the Preferred case
Deeper insight in the Steins flyby geometry:
OSIRIS Science Team Meeting Agay 15. – 17. November 2005
Geometric information for VIRTIS-M data
Investigation of different flyby geometries for asteroid Steins - Surface area, stereo and phase angle coverage Sofie Spjuth Max-Planck-Institut für Sonnensystemforschung.
Lutetia geometry and timeline
OSIRIS operation summary
Mars Swingby (MSB) information
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
OSIRIS Full Team Meeting
WG – Chemistry – mineralogy elemental
Philae status 21st Rosetta Science Team meeting
VIRTIS Operations at Lutetia
PCS Day - Feedback 23th November 2016, Vienna.
PDS4 Geometry Model Project
Presentation transcript:

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz - Rosetta - Mission Status

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz ROSETTA’s journey to 67P/Churyumov-Gerasimenko Launch (2 March 2004, from Kourou, French Guyana Deep-space Manoeuvre, 1 st Earth swing-by (4 Mar 2005) Deep-space Manoeuvre, Mars swing-by (25 Feb 2007) 2 nd Earth swing-by (13 Nov 2007) Steins fly-by (5 Sept 2008) Deep-space Manoeuvre, 3 rd Earth swing-by (13 Nov 2009) Lutetia fly-by (10 Jun 2010) – 3000 km distance Deep-space Manoeuvre & start of hibernation (mid-2011) – within 4.5 AU from Sun Exit from hibernation and Deep-space Manoeuvre (Early 2014)   prime science mission begins Comet Rendezvous (Spring 2014) – between 4.5 AU and 4 AU from Sun Philae lander deployment (Nov 2014) – 3.25 to 3 AU from Sun Comet closest approach to the Sun (Aug 2015) End of Mission (31 Dec 2015)

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz Comet Phase Preparations Three Scientific Working Groups established Comet pre-landing orbiter observations Chairpersons: J.P. Bibring, H. Sierks Comet chemical properties Chairpersons: C. Engrand, D. Bockelée-Morvan Comet physical properties: gas, dust, activity Chairpersons: E. Grün, M. Fulle Representatives of each instrument are members of each WG..

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz Status of Science Theme Table All instruments have their science requirements implemented into the Master Science Themes Table More than 450 Science Objectives have been defined Some addressed similar objectives e.g. “Production rates and spatial distributions of H2O, CO, and CO2” & “Spatial distribution of H2O molecules” etc Science Theme Coordinator: Ho Tra-Mi (DLR Bremen) will meet with WG chair persons to consolidate inputs and requirements (Mgt. planned for April/May)

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz Status of Science Theme Table (cont.) Chairpersons of WG2 and WG3 are working on table structures, consistent terminology, meaningful keywords, etc. Cecile E. & Dominique B.-M. coordinate the revision of the table with Eberhard G., Marco F. and PIs Iterate with PI for the validation of the science goals Any suggestion of PIs, Instrument teams concerning improvement of table? PS, RSOC and Science Theme Coordinator will review and validate the changes of the Science Theme Table focusing mainly on operational aspect of it Science Theme Table  Data Base & Definition of common and complementary measurements of H2O molecules” etc

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz Comet Phase Planning Concept Planning concept, procedures and software required for continuous, intense science operations are only foreseen for the comet phase Development has started at RSOC in cooperation with the BepiColombo Science Ground Segment and the Mission Independent Group. Science driven automated planning approach. RSOC and RMOC are working in cooperation on top-level science operations planning and mission planning concepts, respectively. Presentation to PI teams at SWT in June.

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz ISSI Comet Modeling Team Comet Modeling Tool is available Set of models for cometary environment from nucleus to solar wind plasma interaction Next Meeting: May 2009 Main Topics: Status report of the ICES tool (fixes/improvements, user experience, features in the next release) Continued discussion of physical input parameters, species, and processes that need to be included in ICES in order to make it useful for the Rosetta science team.

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz RSOC Team  Mike Ashman: Science Operations Engineer Lead Active PC10. Experiment interface person for PHILAE and CONSERT.  Juan Garcia Beteta: Science Operations Engineer Lead Earth Swingby 3.  Viney Dhiri: Systems Engineer Science operations planning software for cruise and comet phase.  Michael Küppers: Scientist Science operations planning concept for comet phase. Lead Lutetia Flyby. Support lead Earth Swingby 3.  Claire Vallat: Science Operations Engineer Baseline planning for comet phase. Liaison to Science WGs. Cruise Phase PC Requirements. Support lead Active PC10.  Kristin Wirth: Rosetta Science Operations Manager Rosetta SGS development plan.

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz Active Payload Checkout 10 Status Scenario characteristics:  Execution time: 19 September - 2 October  Delta = AU. OWLT only ~ 3 min. rh = AU.  Interactive operations: 10 passes of 7 hrs, i.e. max. 70 hrs available.  Non-interactive operations: Nominally 4 days = 96 hrs available. Payload operations requests:  Interactive operations: 71 hrs 40 min requested (including PHILAE).  Non-interactive operations: 374 hrs 20 min requested (not including PHILAE) >> 96 h available ~ 90 hrs with specific pointing requested.  PHILAE / CONSERT requested 142 hrs including 4 interactive passes. PC10 is oversubscribed! Solutions:  Numerous parallel instrument operations needed.  Scheduling of non-interactive operations between interactive passes.  Possibly additional non-interactive operations on 18 September.

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz PC10 PHILAE Slots (TBC) : LZ operations

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz Earth Swingby 3 Status  Last planetary swingby of Rosetta.  Only opportunity to take advantage of highest data rates.  Earth swingby will be used to realise the flyby geometry for Lutetia.  Safes fuel compared to later Trajectory Correction Maneuvers.  Requires final decision about flyby geometry for Lutetia on the upcoming SWT (June 2009).  Closest approach 13 Nov. ~07:45 UT, 2480 km above Earth‘s surface.  Moon closest approach about 8 hours later at km.  Remote sensing instruments are going to perform calibrations and PR observations, RPC will do measurements of the magnetosphere.  Limited visibility of Rosetta from Earth.  Closest approach over day side.  Over night side until shortly before CA, but over Pacific Ocean.

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz  Rosetta‘s (and ESA‘s) first asteroid flyby was a success!  Successful operations at the asteroid by 8 orbiter instruments and 3 Philae instruments  Very few minor payload anomalies  Some issues with autonomous tracking (Asteroid Flyby Mode) Steins Fly-by Summary Excellent scientific results. First results already presented at various conferences and workshops. Science Exploitation Workshop for PIs took place, Feb Special session at AGU Spring Meeting, May 24-27, Nature papers planned by OSIRIS, VIRTIS, MIRO

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz Lutetia Fly-By Constraints Michael Müller (ESOC/FD) Requirements: 0 phase angle observation CA distance as close as possible <=3000km CA distance >3000km (MIRO) Pointing offset around CA (SR) No flip shortly before CA (Rosina) HGA coverage across CA (RSI) RSWT, Nov 5 rd 2008, Darmstadt, Germany

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz  Closest apprach:  2.7AU heliocentric distance  3AU geocentric distance  15km/s relative velocity  Phase angle at CA 79deg  Phase angle at approach 11deg  scenario recommended by Astrium: -CA distance: 3055km (  16000km at zero phase angle) -AFM exit 20min after CA -HGA off at CA -10min -flip hours-days before CA Sun direction CA Fly-by geometry (considering 0 phase angle requirements) zero phase angle

Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz Rosetta Book - status ROSETTA ESA’s Mission to the Origin of the Solar System Book finally went into printing 28 February 2009!