SIXTH FRAMEWORK PROGRAMME Assessment of desalination mortars and poultices for historic masonry (2006-2009) EC PROJECT DESALINATION NEWSLETTER 2/2007 Contract.

Slides:



Advertisements
Similar presentations
Industrialization of Electrical Contracting Supply Chain and Logistics Management Santa Clara University School of Engineering Department of Civil Engineering.
Advertisements

WP 1 “Project management & assessment of progress and results” The main goal in this period of WP1 was to set up the systems, procedures and tools.
Analytical Evidence on Research & Innovation in the Danube Region Progress of WP4 Vienna, Béla Kardon, PhD; RCISD
Introduction to Concrete
IMPORWARE EGYPT - WP2 Activities. Egyptian Environmental Affairs Agency (EEAA) Established according to the Law 4/1994 (later amended by Law 9/1999) for.
WP5 – Knowledge Resource Sharing and Management Kick-off Meeting – Valkenburg 8-9 December 2005 Dr. Giancarlo Bo Giunti Interactive Labs S.r.l.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS NATIONAL TECHNICAL UNIVERSITY OF ATHENS SCHOOL.
MDDS: monument damage diagnostic system
Who does what and when? Mary Rowlatt MDR Partners.
Interviewers training, ScoPeO evaluation(Country), (date) Module 1: Present the project and study.
INTERIM REPORT AND MAIN FINDINGS Anna Lasakova, Lubica Bajzikova & Simone Sasso Smolenice, 5th November 2014.
ESA Project- Coupled Model Assimilation Year 1 workshop Aim: To establish coupled Atmosphere-Ocean assimilation system at ECMWF and demonstrate improved.
Cluster “LIFETIME” Cluster “LIFETIME” projects: LIFECON (Coordinator VTT, Finland) EUROLIFEFORM (Coordinator Taylor Woodrow, United Kingdom) INVESTIMMO.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
Clara Puech European Projects Coordinator EGNATIA EPIRUS Foundation INTERREG III B CADSES Neighbourhood Programm “HERITOUR” September 2005.
Project ALPTER - ‘Terraced landscapes of the alpine arc’ EU Programme Interreg IIIB Alpine Space Venice, 20 th January 2005 Project Kick-off Meeting Location:
Large-Scale Integrating Project SEVENTH FRAMEWORK PROGRAMME THEME 1: HEALTH Optimization of Treatment and Management of Schizophrenia in Europe General.
WP1 presentation Christian Jagersma Bucharest, 1-4 March 2010 Agentschap NL (NL Agency)
Sixth Framework Programme Project no. Contract no Project acronym: DESALINATION Project title: Assessment of Desalination Mortars and Poultices.
Qualifications Update: Environmental Science Qualifications Update: Environmental Science.
2nd Meeting of the MariFish Bycatch and Discards Scientific Committee Madrid, 5-6th October 2009 Work Package 7: Collaborative Research Programmes Thematic.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
A Virtual Instrumental Analysis Laboratory (VIAL) for Buffalo State and Open SUNY Jinseok Heo, Alexander Nazarenko, M. Scott Goodman, and Jamie Kime Department.
EGIDA PROJECT 1stJoint Workshop of the EGIDA Stakeholder Network and Advisory Board Connecting GEOSS and its Stakeholders in Science.
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
MULTILATERAL COOPERATION KEY PERFORMANCE AREAS SA engagement with the UN Implementation of major summits and international conventions relevant to S&T.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
Public Transportation Business Plan Workshop on Regional Planning June 14, 2005.
Clara Puech European Projects Coordinator EGNATIA EPIRUS Foundation INTERREG III B CADSES Neighbourhood Programm “HERITOUR” November 2005.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Introduction of the ‘SDI-EDU for regional and urban planning‘ project Karel JANECKA 1 1 University of West Bohemia, Faculty of Applied Sciences Department.
EBP-BIOSOC Juin 2007 Biosoc general framework Agenda of the meeting and expected results Practical information Introduction of WP1 discussion.
CARPE DIEM 3 rd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Why a co-ordination action about Enhanced Geothermal Systems ? P. Ledru & A. Genter Engine Launching Conference February 2006 Orléans, France Opening.
HySafe Coordination Committee Meeting, October 18, 2005, Karlsruhe Status of WP5- The Hydrogen Incident and Accident Database Update October 2005 Christian.
Work packages SGA II ESSnet on microdata linking and data warehousing in statistical production Harry Goossens – Statistics Netherlands Head Data Service.
1 Session II: Innovative Applications and New Ideas: Immovable Heritage rapporteur: Roman Kozlowski.
LOGO Mamdouh Abdel Aziz Refaiy Dr. Associate Professor, Business Administration Department, Faculty of Commerce, Ain Shams University, Cairo, Egypt. Evaluating.
WP4 – Policies, strategies, plans and innovative energy efficient solutions in urban transport Steering Committee Meeting Rijeka, Croatia 26/02/2015 Presented.
Gabriela Macoveiu North-East RDA, Romania PP11 – WP responsible Cluster Policy Learning Platform WP3 Description Smarter Cluster Policies for South-East.
Community of Practice on partnership in the ESF October 2008 Open Days Benedict Wauters Deputy Director Flemish ESF Agency COP partnership coordinator.
Maria J. Martins, IST, Lisbon, Portugal Vigo, 2001 THEIERE meeting: Vigo, 1st December THEIERE’s first year overview -New partners -Discussion of.
September 2005 DEA: First National Workshop 1 Development and Energy in Africa First National Workshop: Tanzania 12 September 2005 Introduction Gordon.
Community of Practice on partnership in the ESF 10 December 2007 Benedict Wauters Deputy Director Flemish ESF Agency COP partnership coordinator.
Slide 1DSS Board 1-2 December 2014 Eurostat ESS.VIP ADMIN project on use of administrative data sources Agenda point 7 DSS Board 1-2 December 2014.
AWAST final meeting - Brussels december 2003 Aid in the management and European comparison of Municipal Solid WASte Treatment methods for a global.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
Deliverable Status Christian Esposito University of Napoli Federico II Naples, 25th January 2011.
REACH FOR POLYMERS A €480, month project aiming to increase the knowledge base of the European polymer industry, particularly SMEs, when complying.
Avena genetic resources for quality in human consumption (AVEQ) Startup Meeting, Clermont Ferrand 2007 Federal Centre of Breeding Research on Cultivated.
Monitoring Visit to NatRisk Project
Energetická náročnost budov
Kick Off Meeting Largs, Scotland
Quality Assurance MENTEP Yves Beernaert, Educonsult
Dr. Charikleia Karakosta, Ms. Anastasia Ioannou, Ass. Prof
43rd PMP-Meeting Rosa Delgado IDIADA 15/03/ /03/2017 TITLE
M. Z. Bezas, Th. N. Nikolaidis, C. C. Baniotopoulos
Development and Energy in Africa
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
Upgrading the research performance in molecular medicine at the
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
ESS.VIP ADMIN Sorina Vâju.
AMICI WP1 – Management, coordination and dissemination
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
ITDG meeting of of October 2011
The basics ESSnet on SDMX prepared in 2008/2009
GeoERA - GROUNDWATER VoGERA - rationale Increased pressure on deep sub-surface in Europe for energy related activities e.g. oil and gas, geothermal, energy.
ENabling SafE Multi-Brand Platooning for Europe
Presentation transcript:

SIXTH FRAMEWORK PROGRAMME Assessment of desalination mortars and poultices for historic masonry ( ) EC PROJECT DESALINATION NEWSLETTER 2/2007 Contract No Scientific co-ordinator: Fulvio Zezza University IUAV of Venice

WP 1: management WP 2: interviews and selection of desalination system WP 3: case studies WP 4: performance of desalination systems WP 5: NMR research moisture and salt transport WP 6: knowledge transfer Work Package (WP) list The following meetings have been organized and the meeting minutes have been produced for each scheduled meeting 1st meeting 1st 6M meeting 1st WP4 meeting 1st Workshop Desalination 2nd 6M meeting Venice, 9-10 May 2006, Italy Dijon, October 2006, France Delft, 9 February 2007, The Netherlands Venice, May 2007, Italy Venice, May 2007, Italy WP1 – Coordination

UNIVERSITY IUAV OF VENICE – FACULTY OF ARCHITECTURE Aula Gradoni – Santa Marta, Dorsoduro 2196 Venice May 21-22, 2007 WORKSHOP DESALINATION The Workshop proposes an approach to the complex desalination question and penetrates into the scientific and technological objects of the EC Project Desalination to gain a better understanding of the salt transport mechanism between salt laden substrates and poultices. Possibilities and limitations of the desalination treatments are considered taking into account from one hand the environmental conditions and the salt origin, and, from the other, the products characterization, within a modular desalination system which considers different substrates as composition and properties. The Workshop Desalination aims to extend the knowledge of the restorers on the practice for desalination: the materials properties, the environmental conditions, the kind of salt and the type of treatments to apply for desalination play a fundamental role in their decision.

The results of the online survey of Desalination Questionnaire, collated and assessed using statistical software (SPSS), give an insight into the current working practice and materials selection of conservators, contractors and architects WP2 – Interviews/selection of mortars Location of respondents Type of poultice products used

WP3 – Case studies In situ investigations Church of Zoutelande Waag building Amsterdam The Netherlands Italy-Venice Terese ConventSan Geremia Church New Orleans USA Augustusburg Palace Germany-BruhlFrance-Dijon St. Philibert Church

Practical demonstration performed in situ during the 1st Workshop (Venice). Three different kind of poultices with different grain size composition, specifically prepared by Remmers, have been applied on substrates previously detected by NDT techniques. The comparison of the results (pre – post treatment) by means of the methodological research foreseen in the Project will be the aim of the next in situ research work. WP3 – Case studies Case study: Terese Convent - Venice

Within the laboratory tests the characterization of poultices workability, shrinkage and composition has been completed for the four main types of poultices: cellulose based poultices clay based poultices (mineral class) poultices made off a mixture of cellulose and mineral compounds ready to use poultices WP4 – Performance of desalination systems The first results of moisture transport for different kind of poultices (kaolin sand, cellulose poultice and Arbocel poultice) applied on different substrates, (a fired clay brick and a calcium silicate brick), have been presented The selection of the salt mixture composition for lab test is ready calcium silicate brickfired clay brick fine porous coarse

Salt transport and building materials WP5 - NMR research NMR equipment Grey calcium silicate stone White calcium silicate stone Red brick Yellow marl limestone WP6 – Knowledge transfer implementation in MDDS Project website: salt diffusion on porous building materials TNO organized a miniworkshop for the partners in the project on the use of MDDS (Monument Damage Diagnostic System), which took part in Feb The project website was developed ( Activities around this deliverable have been performed by TNO and subcontractor SNA.

WP Common procedure for assessment of treatments M Description of case studies M24 WP4 4.3 Report on the results on the evaluation of the performance of different desalination systems M Scheme which indicates what desalination system may be used successfully on substrates with specific pore-size distribution M32 WP5 5.3 Insert for air flow and relative humidity control during NMR scanning M Input data for model on moisture and ion transport during drying for mortar/mortar/poultice and substrate combination M22 WP6 6.4 News letters 3 M25 NEXT DEADLINES