ME 380 Project Planning. Critical Path Method (CPM) Elements: Activities & Events Feature: Precedence relations ActivityDurationPrecedence A4- B5- C3A.

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

Chapter 17 Project Management McGraw-Hill/Irwin
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Chapter 13 Project Scheduling: PERT/CPM
Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. Use.
Project Scheduling / Time Study
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Operations Management Session 27: Project Management.
Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.
D1: Critical Events And Critical Paths. D1: Critical Events And Paths A critical path is the list of activities on an activity network that, if they are.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 © 2007 Pearson Education.
MGMT 483 Week 8 Scheduling.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
ELC 347 project management
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Activity networks – Example 1 TaskDuration (hours)Immediate predecessors A3- B4- C6- D5A E1B F6B G7C, D, E The table below shows the tasks involved in.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
ISP-2010 Network Evaluation & Analysis ISP Project Management.
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
5/18/2015 L. K. Gaafar PROJECT MANAGEMENT Time Management* Dr. L. K. Gaafar The American University in Cairo * This Presentation is Based on information.
BA 333 Operations Management
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Network Problem CPM & PERT
Network Planning Methods Example PERT & CPM
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
PROJECT MANAGEMENT Approaches
11/02/09 Chapter 7-Project Planning 1 Elements of Project Planning  Divide project into tasks, tasks into subtasks, subtasks into...  Estimate duration.
Project Management - CPM/PERT
INDE 6332 ENGINEERING PROJECT MANAGEMENT SCHEDULING LECTURE 1 University of Houston Dept. of Industrial Engineering Houston, TX (713)
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
5 th LectureCEN 4021: Software Engineering II Task Sequence and Effort representation  All tasks share at least two basic characteristics –Require effort.
Project Management Chapter 13 Sections 13.1, 13.2, and 13.3.
TK3333 Software Management Topic 6: Scheduling. Contents  Estimate the duration for each activity  Establish the estimated start time and required completion.
Dr. Hany Abd Elshakour 2/18/ :27 PM 1. Dr. Hany Abd Elshakour 2/18/ :27 PM 2 Time Planning and Control Activity on Arrow (Arrow Diagramming.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Q1) A precedes C. B precedes D & E. C precedes F & G. D precedes G.
15B Critical path analysis. In a critical path analysis, edges represent activities. Nodes (vertices) represent the end of one activity and the start.
Project Scheduling. Why Are Projects Late? an unrealistic deadline established by someone outside the software development group changing customer requirements.
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
9-1 ELC 347 project management Day 19. Agenda Integrative Project –Part 4 Due –Part 5 Due Nov 24 (page 342) –Any of the first five sections can be resubmitted.
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management Chapter Topics
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PERT and CPM.
Project Planning & Scheduling
UNIT II Scheduling Procedures & Techniques CRITICAL PATH ANALYSIS
Project Scheduling: networks, duration estimation, and critical path
CHAPTER 8: SCHEDULING (PENJADUALAN)
Presentation transcript:

ME 380 Project Planning

Critical Path Method (CPM) Elements: Activities & Events Feature: Precedence relations ActivityDurationPrecedence A4- B5- C3A D3A E2B, C Activities Table

Critical Path Method (CPM) Graphical representation : Activities : (edges) Events : (vertices) C  T (Time reqd. for activity)

Critical Path Method (CPM) Precedence: Activities B & C precede Activity E C B E This “Event” cannot occur before both activities B & C have been completed

Critical Path Method Example ActivityDurationPrecedence A4- B5- C3A D3A E2B, C

Critical Path Method (CPM) The project sequence graph is constructed: C B E A D Now what ??? Project Start Project End

Critical Path Method (CPM) Events are consolidated to provide the specified precedence. “Dummy” activities are added if necessary. C B E A D Project Start Project End

Dummy Activity Example To be able to bolt a bracket to a panel, the operations required are : Design bracketA- Build bracketBA Build panelC- Drill holes in panelDA,C C B A D A A C C D D B

Critical Path Method (CPM) Activity times (duration) are added next : C B E A D Project Start Project End

Critical Path Method (CPM) The CRITICAL PATH is the path through the project on which any delay will cause the completion of the entire project to be delayed: C B E A D Project Start Project End

Critical Path Method (CPM) For fairly simple projects, the critical path is usually the longest path through the project. For projects with several parallel and interlinked activities, this may not always be the case. For more complicated projects, the critical path can be determined with an ‘earliest time’ forward sweep through the diagram followed by a ‘latest time’ reverse sweep.

Critical Path Method (CPM) The EARLIEST starting time of each activity is associated with the events. It corresponds to the longest time of any path from any previous event. C B E A D Project Start Project End

Critical Path Method (CPM) The LATEST starting time of each activity is also associated with the events. It corresponds to the longest time of any path from any subsequent event. C B E A D Project Start Project End

Critical Path Method (CPM) The CRITICAL PATH is the path along which the earliest time and latest time are the same for all events, and the early start time plus activity time for any activity equals the early start time of the next activity. C B E A D Project Start Project End

Critical Path Method (CPM) This project cannot be completed in less than 9 weeks given the expected duration of the activities. However, activities B & D could be delayed or extended by up to 2 weeks each without affecting the minimum project completion time. This is termed ‘float’ or ‘slack’ time. C B E A D Project Start Project End

Example Activity Duration Precedence A3- B3A C4- D1C E3B, D F2A, B, D G2C, F H4G I1C J3E, G K5F, H, I

Example C BE A D Project Start Project End H K J F I G

Example ActivityDurationEarliest Start Latest Start Float A3000 B3330 C4011 D1451 E36137 F2660 G2880 H410 0 I14139 J K514 0

Summary: CPM Steps List all activities and expected durations. Construct CPM diagram for activities list. Determine EARLIEST start time for each event (working forward from project start). Determine LATEST start time for each event (working backwards from project end). Identify the CRITICAL PATH (and the ‘float’ time for any non-critical activities).

Using Estimates of Activity times The estimated duration of any activity is just that – an estimate. There is usually an optimistic time (shortest time, T S ) associated with any activity – 1 in 100 chance of taking less time than this. There is also usually a pessimistic time (longest time, T L ) associated with any activity – 1 in 100 chance of taking longer than this. If T M is the most likely time for a specific activity, then a mean and variance for the activity can be calculated, assuming that T S, T L and T M are the parameters describing a Beta distribution.

Using Estimates of Activity times The estimated time T EST is calculated as: T EST = (T S + 4.T M + T L )/6 and the variance of this is:  2 = (T L – T S ) 2 /36

from the previous Example ActivityDuration T M TSTS TLTL T EST Earliest Start Latest Start Float A B C D E F G H I J K

PERT/CPM The critical path has now become C-D-F-G-H-K with a total estimated time of 21.3 days (i.e ) The std. deviation along the critical path is the square root of the sum of the individual variances:  CP =   C 2 +  D 2 +  F 2 +  G 2 +  H 2 +  K 2 which for this data is 2.36 days