WBS: Lowest level OBS: Lowest level
Advertisements

464 Lecture 09 CPM Revision. Scheduling Techniques r The scheduling techniques are î To plan, schedule, budget and control the many activities associated.
Chapter 17 Project Management McGraw-Hill/Irwin
Chapter 13 Project Scheduling: PERT/CPM
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
PROJECT MANAGEMENT. Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
إدارة المشروعات Projects Management
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Chapter 9 Project Management.
Chapter 10 Project Scheduling: PERT/CPM
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Operations and Supply Chain Management, 8th Edition
Importance of Project Schedules
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Project Management OPIM 310-Lecture.
1 Material Management Class Note # 5-A ( in review ) Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Roberta Russell & Bernard W. Taylor, III
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Software Project Management Task Estimating and Scheduling
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Network Planning Methods Example PERT & CPM
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
1 Material Management Class Note # 6 Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning, Scheduling and Control Planning: –defines objectives, tasks and preceeding relationships; estimates time and resources Scheduling: –identifies.
Beni Asllani University of Tennessee at Chattanooga
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management: PERT/CPM
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Projects: Critical Paths
PROJECT MANAGEMENT WITH CPM/PERT.
Project Planning and Budgeting
Slides Prepared by JOHN LOUCKS
Presentation transcript:

IE Work Design: Productivity and Safety Dr. Andris Freivalds Class #2

IE NEED FOR SAFETY – 5 Myths, misconceptions –Safety doesn’t sell –Catastrophic failures main concern –Safety slows operations –Safety is human (operator, user) problem –Cheaper to pay insurance (McWane??) –Making product safer increases costs

IE NEED FOR SAFETY – 5 cont’ AMOUNT OF SAFETY COSTS

IE IE 419 – Work Design Productivity –Productivity tools: PERT, Worker-machine charts, line balancing, plant layout –Work measurement: MTM-2, MOST, Work sampling Safety –General safety principles: how to recognize & analyze problem, select & apply remedy –Quantitative analyses: JSA, fault-tree, cost-benefit –Legal aspects: Workers Comp, OSHA –Hazards: recognize & control specific hazards

IE PRODUCTIVITY TOOLS Methods Study = Systematic recording of existing and proposed ways of doing work in order to improve productivity (to improve the job for the operator) 1)Select project 2)Get and present data 3)Analyze data 4)Develop ideal method

IE Fig. 2.1 – Steps in Methods Study

IE #1 – Select Project Pareto analysis aka: rule 80% of problems from 20% of jobs Focus on the 20% Plot in descen- ding order as cumulative proba- bility distribution DesignTools

IE #1 – Select Project Gantt Chart Horizontal bar chart of activities, shaded if done A snapshot of the status of all activities Focus efforts on those that are behind schedule

IE METHODS STUDY (Next?) 2)Get and present data 3)Analyze data 4)Develop ideal method All of these overlap Use special charts Quicker, efficient, for IEs Focus on productivity improvement

IE PERT and CPM (pp ) PERT = Program Evaluation and Review Technique (1950s) –Booz Allen for U.S. government & military –Time has uncertainty –Minimizing time is main goal CPM = Critical Path Method (1950s) –DuPont for large scale projects –Time is specified –Trade-off between cost and completion date

IE BASICS Set of well defined jobs (activities) Totality of which defines a project Jobs start/stop independently of each other Jobs are ordered in specific (technological) sequence Forms a graphical network diagram Allows computational estimates

IE GOALS/QUESTIONS How long if every job works out ideally? (optimistic estimate) How long if everything goes wrong? (pessimistic estimate) With average conditions → likely result How can project be shortened at least cost? (trade-offs)

IE RULES/PROCEDURES #1 1)List jobs and estimated duration time 2)Draw network diagram a)Arcs or vectors to depict jobs b)Arrows to indicate direction (progress) c)Numbered nodes to indicate events d)Events = start and end of jobs

IE RULES/PROCEDURES #2 3)No two jobs can be identified by same nodes 3 a) b)Dummy jobs take no time, no resources c)Only to show dependency Job A Job B Use Dummy Job Job A Job B Job C Job D Dummy Job Job B Job A

IE RULES/PROCEDURES #3 4)Show precedence relationships (IP) clearly a)Jobs B & C both required for Job D b)Job C not required for Job D (but needed further on) A C B DE A C B DE

IE RULES/PROCEDURES #4 Time = estimated duration of each job –Earliest start time (ES) = such that IP hold –Latest start time (LS) = without delaying project completion –Earliest finish (EF) = ES + time to complete job –Latest finish (LF) = LS + time complete job Critical jobs = jobs which delayed, delay project Float (slack) = difference between ES and LS; time that noncritical jobs can be ↑, without delaying project Critical path = longest path of critical jobs, determines duration of project; zero float

IE Ex #1- CRITICAL PATH (Travel Times) Two PSU profs (Allen, Booz) drive to Washington DC for a meeting with their contract sponsor (U.S. Army) Prof. Allen leaves State College at 8 AM –drives to Philadelphia (KP, 3 hrs) –get materials from subcontractor Lockheed Martin (0.5 hr) –then onto Washington DC (2.5 hrs) Prof. Booz leaves State College 8 AM –drives to Pittsburgh (3 hrs) –meets 3 rd prof (collaborator) for lunch (2 hrs) –then onto Washington DC (4.5 hrs) What is earliest they can meet for dinner?

IE Ex. CRITICAL PATH - 2 Allen Booz

IE Ex. CRITICAL PATH – 3 Network Table ActivityNodesIPTime A - drive(SC, Ph)-3 B – pick up(Ph, LM)A0.5 C - drive(LM, DC)B2.5 D - drive(SC, Pi)-3 E - lunch(Pi, Lu)D2 F - drive(Lu, DC)E4.5

IE Ex. CRITICAL PATH – 4 Network Diagram PiLu 3 2 SC Ph LM DC Critical Path = = 9.5 Earliest dinner: = 5:30 PM

IE Ex. CRITICAL PATH - 5 Critical path = 9.5 hours Earliest dinner is 5:30 PM Allen can leave 3.5 hrs later (11:30 AM) –Or drive more slowly, sightsee –Flexibility or slack in time = float Practically: If Booz shortens lunch to 1 hr, then could meet a 4:30 PM

IE Ex #2 – CPM and FLOAT ( Building a House) 7 major steps in building a house (months): 1)A - Design & obtain financing (3) 2)B - Lay foundation (2) 3)C - Order materials (1) 4)D – Build house (3) 5)E – Select paint (1) 6)F – Select carpet (1) 7)G – Finish work (1)

IE Ex #2 – CPM and FLOAT A 3 C 1 B 2 D 3 E 1 F 1 G 1

IE A 3 C 1 B 2 D 3 E 1 F 1 G 1 #1 #2 #3 #4 Critical Path =

IE A 3 C 1 B 2 D 3 E 1 F 1 G 1 Forward Pass ES = max (EF i ) EF = ES + t

IE A 3 C 1 B 2 D 3 E 1 F 1 G 1 Backward Pass LF = min (LSi) LS = LF - t

IE JobLSESLFEFFloat A (1,2) B (2,3) C(2,4) Dum (3,4) D (4,6)55880 E (4,5)65761 F (5,6)76871 G (6,7)88990 Float = LS – ES = LF – EF A 3 C 1 B 2 D 3 E 1 F 1 G 1 0,3 3,5 3,4 4,5 5,5 5,8 5,6 6,7 6,7 7,8 8,9 Critical path = all with 0 float =

IE A 3 C 1 B 2 D 3 E 1 F 1 G 1 Crashing – Expediting job, reallocation of resources to shorten project duration