1 Setup Reduction For CNC Principles Copyright 2001.

Slides:



Advertisements
Similar presentations
The Five Finger Method Who ? Wha t? How ? Whe re? Whe n? Wha t? Who ? Whe n? Whe re? How ? SAT Math – A Strategic Approach Rational Routes.
Advertisements

The Five Ss.
1 Principles of Cycle Time Reduction Copyright 2000.
10 Steps To Better Time Management We understand how difficult it is to pursue a passion with your day-to-day responsibilities. Everyone and everything.
TIME MANAGEMENT Using your Time Wisely. Time Management (TM) Myths TM is just common sense. I make good grades, so I must be using my time effectively.
Setup Reduction For CNC Machining & Turning Centers Copyright 2001 Demo only – Most topics are not active!
SPORT EDUCATION MISS PAJAK’S CLASS.
RollCall is a feature recently added to ControlSoft It allows you to have groups of devices checked periodically to see if they are working. The results.
Why Computers Are Necessary in Today’s World!
Small engine repair/maintenance FAS 1401L Small engines Small engines make up a surprising component of daily aquaculture operations. They provide.
The Design Process Where do consumer products begin?
Time Management Skills and Defeating Procrastination Workshop Presented By The New Student Advisement and Retention Services (STARS) center.
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 1 1 Disciplined Software Engineering Lecture #7 Software Engineering.
Applied Software Project Management INTRODUCTION Applied Software Project Management 1 5/20/2015.
Social Media: FACEBOOK Kristin Martin Professional Development.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Applied Software Project Management 1 Introduction Dr. Mengxia Zhu Computer Science Department Southern Illinois University Carbondale.
Establishing corrective norms Session III TEAM WORKSHOP team3.ppt - 1 Team Workshop - Session III  Summary of Brainstorming/Affinity grouping exercise.
Fundamental Problem of Scarcity
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Chapter 14 From Randomness to Probability.
Identify the Problem Identify Criteria And Constraints Brainstorm Solutions Generate Ideas Explore Possibilities Select an Approach Prototype Refine Design.
Time Management.
SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first.
Unit 1 – Improving Productivity. 1.1Why did you use a computer? What other systems / resources could you have used? For unit 10,I had to make a power.
Please close your laptops and turn off and put away your cell phones, and get out your note-taking materials. Today’s daily homework quiz will be given.
Setup Reduction Module
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Christopher E. Naujok, P.E., CEP, CSWP Optimizing SolidWorks through Standards.
Value Analysis/ Flow Analysis
Getting More From Your CNC Machines
Unit 1 – Improving Productivity Ryan Taroni Instructions ~ 100 words per box.
Unit 1 – Improving Productivity Josh Sherriff Instructions ~ 100 words per box.
Chapter 4 Process Design.
Single Minute Exchange of Die OR Quick Changeover
Surviving Your First Weeks. Reality Check  According to American College Testing (ACT), one in every four college students leaves before completing their.
Unit 3 Advantages of NC Thursday, May 10th, 2007.
Processes and OS basics. RHS – SOC 2 OS Basics An Operating System (OS) is essentially an abstraction of a computer As a user or programmer, I do not.
Sugartown Science Fair Science Fair What is Science Research? Where Can I Get My Research Project Idea ? How Do I Develop My Idea into an Experiment?
Big Six By Gloria Redwine 7/98 ckd The Big Six Putting it All Together In Six Easy Steps.
Time management means planning how you can best use your time.
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 7 1 Design and Code Reviews - Overview What are design and code.
Unit 1 – Improving Productivity Instructions ~ 100 words per box.
Complete Branding with Video Kit Part2 Everything you need included (does not include items you already have)
Time Management. Presented by: Jomana Zuhair Al-Momani Eman Al-Qudah Bashaer Mawajdeh Salam Bani-Ata Bayan Bani-Mfrej.
CS Class 22 Today  A word from the Real World What happens when software goes bad…  Binary Search Announcements  Exam 3 – Nov. 25 th in class.
ExPLORE Information Plan Locate Organise Represent Evaluate EX.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Fundamentals of Workflow Analysis and Process Redesign Unit Process Change Implementation and Evaluation.
IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS
Time Management By Josh Bregar Intro To Career Education - CRED-CE Mohawk College.
Lecture 15 Page 1 CS 236 Online Evaluating Running Systems Evaluating system security requires knowing what’s going on Many steps are necessary for a full.
Copyright © 2010 Pearson Education, Inc. Chapter 14 From Randomness to Probability.
Big6 Research and Problem Solving Skills 6 th Grade Project Creating a Travel Brochure.
Automation Copyright © Texas Education Agency, All rights reserved.
7 th Grade Big6 Project Assignment: Make a children’s informational book (It can be in graphic novel format or regular picture-book format)
IMS 4212: Course Introduction 1 Dr. Lawrence West, Management Dept., University of Central Florida ISM 4212 Dr. Larry West
TEN MONEY SAVING TIPS FOR TEENAGERS BY PHILLIP QUINTANA.
Activity-Based Costing
Unit 3 Advantages of NC Thursday, May 10th, 2007.
Part III – Gathering Data
Introduction to Computers
Relates to machining and turning centers
FACILITY LAYOUT Facility layout means:
Setup Reduction -- Creating More Production Time Dr. Richard A
Fishbone Diagram/ Cause & Effect Diagram
Put First Things First Habit 3.
Quick Set-Up Technique
Presentation transcript:

1 Setup Reduction For CNC Principles Copyright 2001

2 Setup reduction principles: J Definition of setup time J Two task types related to setup J Three ways to reduce setup time J Four steps to setup reduction

3

4 Definition of setup time: The time it takes to go from making the last workpiece in the most recent production run…

5 Definition of setup time: The time it takes to go from making the last workpiece in the most recent production run… …to making the first good workpiece (efficiently) in the next production run Everything that happens while the machine is down between production runs is part of setup time!

6 By our definition: Definition of setup time: If you’re running but one workpiece… …there is no production run If you have machines dedicated to one job… …there is no setup

7 Much is directly related to setup: 4Tear down old setup & put everything away 4Clean machine 4Make new setup 4Cutting tool tasks 4Assemble, measure, and enter offsets for 4Assign program zero 4Measure position and enter fixture offsets 4Load program 4Verify program 4Optimize program

8 But maybe some non-productive activities: 4Time spent gathering needed items 4Hand tools 4Cutting tools 4Fixtures 4Gauges 4Material 4Paperwork 4Storage containers ?

9 Or maybe some non-productive activities: 4Time spent gathering needed items 4Personal time 4Breaks 4Lunch 4Phone calls

10 Or maybe some non-productive activities: 4Time spent gathering needed items 4Personal time 4Time spent waiting 4For inspection 4For tool crib attendant 4For fork lift operator These are all fair game for your setup reduction program!

11 4Tear down old setup & put everything away 4Clean machine 4Make new setup 4Cutting tool tasks 4Assemble, measure, and enter offsets for 4Assign program zero 4Measure position and enter fixture offsets 4Load program 4Verify program 4Optimize program Core tasks: 4Time spent gathering needed items 4Personal time 4Time spent waiting 4For inspection 4For tool crib attendant 4For fork lift operator Non-productive tasks: Compare core tasks to non-productive tasks! One goal will be to find ways to draw total setup time down to the time it takes to complete core tasks!

12 One more point… Setup time: the entire time a machine is down between production runs Cycle time: the time it takes to complete a production run divided by the number of good workpieces produced Think about it… …machines are either in setup or running production – there is nothing else!

13

14 Two setup-related task types: On-line tasks: Tasks done while the machine is down between production runs Off-line tasks: Tasks done while the machine is in production for the next (or some future) setup Setup time is the sum- total of all on-line tasks!

15 Two setup-related task types: 4Tear down old setup & put everything away 4Clean machine 4Make new setup 4Cutting tool tasks 4Assemble, measure, and enter offsets for 4Assign program zero 4Measure position and enter fixture offsets 4Load program 4Verify program 4Optimize program Tasks commonly done while the machine is down The fewer the people in the CNC environment, the more tasks tend to be done on line

16 4Programming 4Cutting tool assembly 4Gathering of hand tools 4Gathering of fixtures 4Gathering of gauges Tasks commonly done off line Two setup-related task types: The more people in the CNC environment, the more that can be done off line

17 Two setup-related task types: Important points: The machine is down during the performing of on-line tasks The machine is running during the performing of off-line tasks

18 Two setup-related task types: Off-line tasks are affected by lot size and cycle time… …with small lots and short cycles, there won’t be time to do anything off line! Even with large lots… …if cycle time is short, the operator won’t have time to do anything during the CNC cycle! More about off line tasks

19

20 Three ways to reduce setup time: Eliminate (especially on-line) tasks You save the amount of time it was taking to perform the task

21 Three ways to reduce setup time: Eliminate (especially on-line) tasks You save the amount of time it was taking to perform the task Eliminate the task Remember, given unlimited resources, there is no task that cannot be eliminated! Don’t be too quick to give up on eliminating tasks Ingenuity plays a big part!

22 Three ways to reduce setup time: Eliminate (especially on-line) tasks You save the amount of time it was taking to perform the task Move on-line tasks off line At least the machine is not down during the performance of the task

23 Three ways to reduce setup time: Eliminate (especially on-line) tasks You save the amount of time it was taking to perform the task Move on-line tasks off line At least the machine is not down during the performance of the task Many tasks can be done while the machine is running production Assumes you have adequate lot sizes, cycle times, and available personnel Often requires duplications (especially tooling) Move the task off line

24 Three ways to reduce setup time: Eliminate (especially on-line) tasks You save the amount of time it was taking to perform the task Move on-line tasks off line At least the machine is not down during the performance of the task Facilitate tasks Make it as quick & easy as possible to perform the task

25 Three ways to reduce setup time: Eliminate (especially on-line) tasks You save the amount of time it was taking to perform the task Move on-line tasks off line At least the machine is not down during the performance of the task Facilitate tasks Make it as quick & easy as possible to perform the task The easier a task is to perform, the faster it can be done! Task simplification makes it possible for people with lower skill to perform well Often the easiest alternative to justify Facilitate the task

26 Three ways to reduce setup time: Eliminate (especially on-line) tasks You save the amount of time it was taking to perform the task Move on-line tasks off line At least the machine is not down during the performance of the task Facilitate tasks Make it as quick & easy as possible to perform the task All setup reduction techniques fall into one of these three categories!

27 Remember – feasibility doesn’t always equal possibility Your first goal: Eliminate the task! If that’s not feasible: Move the task off line! If that’s not feasible: Facilitate the task!

28

29 Regardless of whether you are trying to improve an entire setup… …or but one task that is performed in many setups… …there are four basic steps 1)Evaluate current methods 2)Brainstorm for improvements 3)Assign and implement changes 4)Gauge success Planning form is in your manual

30 We’ll show many ways to change the way you make setups With the goal being to reduce setup time But some changes may have unexpected consequences Step one: Evaluate current methods

31 You must be able to gauge the impact of any change on your CNC environment! Since we’re talking about setup time reduction… …most evaluations will be gauging time Before you attempt to improve a setup task, you must know how long the task is currently taking! Step one: Evaluate current methods

32 Step one: Evaluate current methods The time required to performing a task is directly related to its complexity Since facilitating (simplifying) tasks is one way to reduce setup time… …you must also be able to evaluate the complexity of tasks to be improved

33 4Get everyone’s approval 4Watch for unusual behavior 4Use a camera with time/date The best way is to video tape the task… Step one: Evaluate current methods You must be able to gauge the impact of any change on your CNC environment!

34 …another way is to simply time the task Step one: Evaluate current methods You must be able to gauge the impact of any change on your CNC environment! But it will be much more difficult to evaluate complexity

35 Step one: Evaluate current methods You must be able to gauge the impact of any change on your CNC environment!

36 What you may find: A high degree of disorganization! Your greatest initial improvement may be… …to get better organized KOrganization of hand tools KOrganization of cutting tools KOrganization of fixtures KCleanliness of work area KMisplaced items KPoor documentation KMinimal engineering support KConflicting methods KNo communication KTooling not available

37 Setup reduction form: