Unlatch and open the instrument door. Removing the Recorded Tape.

Slides:



Advertisements
Similar presentations
Using a Sewing Machine Fashion and Interior Design Page
Advertisements

MO-735 Overlock Dealer Training CLICK.
Introducing Digital Talking-Book Machines Standard player Advanced player.
Replacing the Maintenance Kit HP Printers OIT lab services.
First Paper Feed Area Table Height Adjustment: There are two ways of adjusting the upper limit sensor. 1. You can put two sheets of paper on the paper.
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
 When using the rotary cutter always walk with the blade closed. To open the blade place four fingers around the handle and slide the blade guard button.
Changing the Oil in a 2006 Mitsubishi Eclipse. Introduction Changing the oil in your 2006 Mitsubishi Eclipse is easier than you may think. With a few.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Boring Head Kaizen Project By: Tyson Meeks Christopher Tockey.
Installing a double Dreamscreen. Check measurement Left.
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
Optical Manufacturing Solutions 1 Probe Assembly.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Click on this image to open the full PDF document.
Kwikset Rekey Ultramax Rekeying the Ultramax by Kwikset this presentation is designed for beginners.
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Making Grids This document shows you one way to make grids in PowerPoint. I prefer this way over PowerPoint’s built in grid because I can make my grids.
Yamaha oil pump rebuild
Split steering gaiter (nearside) this is an MoT failure.
MyLock 644D Service Seminar.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Pulleys Vanderbilt Student Volunteers for Science Fall, 2010 Training Refresher.
Reduced Vertical Separation Minimum (RVSM)
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Threading the Sewing Machine Place the Spool of Thread on the Spool Pin.
Printing From Your Black & White Film Enlarger to Projection Print Your Negative onto Paper 4-in-1 Printing Easel for your RC paper Timer for the enlarger.
USING THE LATHE TO MAKE THE TENSILE TESTING SAMPLE
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Introduction to Operation of the XL- 30 Scanning Electron Microscope Tutorial # 2 Introduction to Operation and Imaging.
How to thread the Sewing Machine. Winding the Bobbin Place your thread on the spool pin Pull thread around knob on opposite end of the machine Thread.
Showing Demonstrations on the TV How to connect the camera to our TV set.
1 Spool Pin 2 Upper Thread Guide Thread Guide 3 Tension spring 5 6 Take-up Lever 7 Thread Guide 8 Thread Guide 9Thread Guide 10 Needle Tension Discs.
How to make a paper bag book cover
4100 HP Maintenance Kit Enter
How to Make PVC Pan Pipes
Service Seminar Memory Craft Removing the Face Plate 1. Open the face plate. 2. Remove the 2 screws and remove the face plate. 1.
Levers and Pulleys. Levers A lever is a tool that people use to make work easier. Levers are used to lift things or overcome resistance. Levers give us.
Intro to Power Tools Ag Mech I Class Notes. Objectives AM15.01 Explain how power tools are used in agricultural mechanics. AM15.02 Know and demonstrate.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
How to make a portrait template By Carlin Bright ACT-IED-8. Students will demonstrate use of proper line types a) Demonstrate the ability to perform a.
Harding High School Technology Lab Safety Power Machine Review Mr. Pottkotter & Mr. Robinson.
China Gracemac Paper Limited. 1 Lift the printer cover door.
Parts of the Sewing machine
Setting up correctly Different types and their use
Physics of Sound Investigation 2, Lesson 2 Length and Pitch.
Pin your locations First, you need to visit each of the stops you want to make on the tour and put a yellow push pin in it. Click the yellow pin along.
HOW TO CHANGE A TIRE. Take out the following items for you vehicle: - Spare Tire - Jack - Tire Iron - Lug Nut Key(if applicable) Spare Tire Jack Tire.
Perspective Drawings Linear perspective is a geometric method of representing the apparent diminishing of scale as the distance from object to viewer increases.
Square Plant Stand. TOOL: Radial Arm Saw NEXT STEP: Surface Planer RESULTS: Rough size pieces for 4 Legs. 33” long PROJECT Square Plant Stand PART Legs.
1 Point Perspective Students will tape down a piece of paper and go through the steps As we go through the presentation.
Parts of the Bernina 240 Sewing Machine Dalton- Clothing Instructions: Please go through The Parts of the Sewing Machine and explore each part on your.
MATTING. REMEMBER… Matt Board is expensive. Measure twice, cut once. Lay your matt board on something clean… on newsprint for example, NOT the floor!
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Memory gift box leahfung.typepad.com. memory gift box opened.
Build A Motor You must follow the directions step-by-step!
Part of the Sewing Machine. Bobbin Winder  a peg that spins your bobbin as you wind thread on to it  powered by the foot pedal when your needle is disengaged.
VIEW SERIES with Sliding Door
WELCOME TO EVM WITH VVPAT TRAINING FOR ARO’S and STAFF
Safety Review & Equipment
Bilge Pump Service Project Model Service Kit
Let’s learn about the parts of the sewing machine.
Sewing Machine Parts Guided Notes.
Railcar Tow Rope System
Using the Sewing Machine
Creating a grid by Carl Dellutri.
Presentation transcript:

Unlatch and open the instrument door. Removing the Recorded Tape

Make sure the next punch cycle is not ready to begin, by checking the timer. Push the button on the right side of the timer. If a punch cycle begins – just stop and wait for it to complete. You CAN turn the gage off – just remember to turn it back ON!!!

Remove the plastic chad tray. Remove the plastic chad tray.

1. Mark a line across the top of the tape. 2. Make one or two manual punches. Removing the Recorded Tape

Mark the date, time of removal, and Station Name and number on the recording tape – BELOW the bar. Example: Hobbs 13W, NM Dec MST Below the bar

From the underside of the instrument, draw about 20 inches of blank tape from the spool. There are several ways to do this: Push down gently on the metal flange or tape guide and pull on the tape as shown. side of the tape.

Or hand rotate the sprocket as shown.

Or loosen the tape by counter rotating the take up spool slightly – this will cause the tape to bow.

Pull enough tape to have at least 24 inches of excess for the next step. Pull this excess tape through, the punch block, then tear.

Tear the tape above the punch block.

This allows sufficient tape to re- thread, and enough tape for the end. There should be 12 inches at the end of the roll and 12 inches of blank tape at the beginning. Do Not tear at the end of the data. That is where the data holes are.

Roll up the remaining tape onto the take-up spool.

Without tearing the tape pull the roll off the spool.

Another view, removing the tape. Note the spring inside the grooved wheel – you can’t see it when the cover is on, but you can feel it.

Now you should Have sufficient Amount of tape To rethread

Thread tape under the bar guide to the tape spool. Note the slot along the edge of the spool. Bar guide

Re threading the spool. Line up the paper with the slot across the tape take up spool.

It is best to have enough tape to rap around the spool 3 or 4 times. If you do not have enough, pull more tape from the bottom. Go back to slides 7 and 8. Using the take up spool Spring, Tighten the tape around The spool several times.

Other things to consider: Do Not write on the data area of the tape. Do Not write on the data area of the tape. Check that the tape is properly keyed to the drive sprocket feed pins. Check that the tape is properly keyed to the drive sprocket feed pins. Holes line up with feed pins

Setting the Time The time at the punch block should be a little short of the actual time. The time at the punch block should be a little short of the actual time. Manually punch up to the correct hour. Manually punch up to the correct hour. Manually punch to the the quarter hour you need. Manually punch to the the quarter hour you need. Adjust as needed. Adjust as needed.

More on Setting the time: The gear sprocket: see slide 7 see slide 7 As you turn the gear sprocket, each click moves the paper by 1 line or 15 minute increment. As you turn the gear sprocket, each click moves the paper by 1 line or 15 minute increment. Move the tape this way, you should tighten the paper feed at the top, Move the tape this way, you should tighten the paper feed at the top, see slide 18. see slide 18. The lines on the tape: The solid horizontal lines indicate the hour measured in military time. The solid horizontal lines indicate the hour measured in military time. i.e. 12 is noon, 13 is 1 pm 14 = 2 pm etc. i.e. 12 is noon, 13 is 1 pm 14 = 2 pm etc. Lighter shaded horizontal lines are in 15 minute increments. Lighter shaded horizontal lines are in 15 minute increments. Vertical lines are Precipitation amounts. Vertical lines are Precipitation amounts.

Now you are ready To complete the tape Process Mark a line across The top of the Tape guide bar.

Mark New date and time the tape was put on. Remember Station Name and number – When putting on the new tape write information **ABOVE** the bar. Above the punch block bar.

Label the gage with the Station Name and number. Label the gage with the Station Name and number. And Date and time you completed the process. e.g. And Date and time you completed the process. e.g. 2 Jan 05 2 Jan CST or MDT indicating daylight time or standard, as the case may be CST or MDT indicating daylight time or standard, as the case may be.

Put the Chad tray back on by sliding the side indentations along the sticks on the side. Remember to Turn the gage Back on if you Turned it off.

The End