Www.fugro.com Offshore Wind Project Logistics & Unique Site Technology Investigation – Fabrication - Installation Presentation to: Virginia Offshore Wind.

Slides:



Advertisements
Similar presentations
B ONES O F S TEEL 100 YEARS IN BUSINESS +1MILLION TONNES OF STEEL 4 GENERATIONS E ST MW = 650,000 TONNES S TRENGTH & INNOVATION.
Advertisements

Forth Estuary Forum 28th Nov 2013
TIDAL TURBINE FOUNDATION OPTIMISATION RAMBOLL ENERGY MOJO MARITIME Alternative title slide.
Welcome to Lindø Industrial Park
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
Local Content Reflections & Opportunity Areas Maputo - Feb’ 2014 Company of ENH, EP Group.
Ilinca Julian, Heikki Ojanen, Juha - Matti Lukkari.
“Energy from the Sea – BioFuels, Currents, Tides & Wind” Panel Contribution by Dr Tony Raven Director, Research & Innovation Services University of Southampton.
Louisiana Offshore Wind Energy Wind Energy Systems Technologies, LLC New Iberia, Louisiana, USA Presented By: Herman J. Schellstede W.E.S.T.
THE MONOPOD BUCKET FOUNDATION Recent experience and challenges ahead Christian LeBlanc1, Kim Ahle1, Søren A. Nielsen 2, Lars B. Ibsen 3 1) DONG Energy,
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
© Siemens AG 2011 Hull Offshore Wind Workshop Siemens Wind Power A/S, Thomas Mousten, Offshore Wind Americas.
Facilities and Infrastructure December 10, Barletta Construction: Parent Organization In 1914, Vincenzo Barletta, a recent immigrant from Italy,
Integrated Assessment of Off-shore Wind A Research Partnership between: Grand Valley State University Michigan Alternative and Renewable Energy Center.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group.
UK’s First Commercial Scale Offshore Wind Farm 26th March 2003 NWP Offshore Ltd.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
DHL, A leader in logistics Faysal Elhajjami Business Development Manager, Chemicals Industry Eastern Europe, Middle East and Africa NOT AN OFFICIAL UNCTAD.
Multi-Sector Ocean Use: Traditional and Alternative Energy MAFAC Meeting May 13, 2009.
Converting Wind to Energy: The University of Maine at Presque Isle Wind Project By Sumul Shah Solaya Energy (A Division of Lumus) May 14, 2009.
OPERATING SEGMENTS Grain and Ingredients. Gavilon manages the third largest grain merchandising operation and leading feed ingredient business in the United.
Agenda  Surging wind industry  Land-based wind in Maryland  Offshore wind  Policies – federal and state  MD’s Climate Action Plan  40% clean electricity.
TECHNOLOGY AND INNOVATION Substructure design, manufacturing and new concepts Stockholm, 2009 September 15 th INNOVATIONS IN DESIGN AND INSTALLATION.
1 | Program Name or Ancillary Texteere.energy.gov Offshore Wind Energy Overview Patrick Gilman Environmental & Siting Specialist Wind and Water Power Program.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Massachusetts Leads: Protecting the Environment and Greening Up the Bottom Line State Senator Marc R. Pacheco Chairman of the Senate Committee on Global.
THE VULNERABILITY OF GULF OF MEXICO SHIPYARDS TO COASTAL FLOODING AS A RESULT OF STORM SURGE By Capt. Christopher Bowman.
Maine Wind and Ocean Energy Industry Initiative An Overview Jeff Thaler Visiting Professor, University of Maine Co-Chair, E2Tech November 15, 2011.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
- Industrialization & Economic Development -
Off-Shore Wind Energy Technologies
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
OCEANS, LAKES & RIVERS. INNOVATION, EXCELLENCE & SERVICE. Great Lakes Data in Offshore Wind Applications Andrew McGillis Detroit, MI 21 June 2011.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
Virginia Economic Development Partnership Federal and State Leasing and Permitting Stephen Walz Department of Mines, Minerals and Energy December 7, 2010.
Stephen Kerr Beatrice Offshore Windfarm. STW Offshore Wind Supply Chain 2 nd February 2010 Inverness.
AquaRET 2 LEONARDO DA VINCI - Transfer of Innovation AquaRET 2 Online Survey results Bilbao, 05/10/2010 E. Mavrou Environmental Scientist, MSc CRES - Greece.
Offshore Wind International Review Luciano Pirazzi ENEA.
DOE Peer Review May 10, 2006 Golden, CO Walt Musial Leader-Offshore Projects National Renewable Energy Laboratory Offshore Wind.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Unit 2 Careers. Aerospace Engineer A person who the research, design, development, construction, testing, science and technology of aircraft and spacecraft.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
THE VIRGINIA OFFSHORE WIND COALITION PROMOTING THE OFFSHORE WIND INDUSTRY IN VIRGINIA.
Dan Finch Moray Offshore Renewables Ltd. DELIVERING ROUND 3 Inverness 2nd February 2010 MORAY FIRTH OFFSHORE RENEWABLES Ltd.
Birds and Offshore Wind Development in the Northeast/Mid- Atlantic February 13, 2008 Birds and Offshore Wind Development in the Northeast/Mid- Atlantic.
© 2012 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
GBT - part of Econcern’s Wind Holding BV - works closely with Darwind BV and Steelworks BV. GBT forms an essential part of the value chain that will provide.
Oil and Gas Insurance Lessons for East Africa 7-Dec-15.
NAVITUS BAY UPDATE Sean Matthews Project Engineer 20 March 2013.
Industrialized Floating Foundation
Offshore Wind Farms An overview… UE VISION FOR % energetic efficiency -20 % greenhouse gas emissions 20 % of energy from renewable.
A Presentation By Student Ocean Advocates. The New York/New Jersey Bight: Our Little Sea in the Big Ocean The NY/NJ Bight NY/NJ Bight - Waters from Montauk.
North Coast Wind Farm Tolano Environmental Consulting.
08/11/2013 Tidal Energy: a Vision from West Normandy Region and ALSTOM Thematic Workshop 2: Energy J. CREST, Business Development Manager, ALSTOM Ocean.
Building Offshore Wind in England: Centres of Offshore Renewable Engineering (C.O.R.E) British Embassy, Lisbon, 25th October 2012.
REMCAP Workshop – Maritime Autonomous Systems Jonathan Williams, CEO at Marine South East Ltd 23 Sept 2015.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
Marco Williams, Lauren Radford, Greer Taylor, Lucy Woods, Mollie Winning, Blane Barton and Thompson Taylor.
Manufacturing in Denmark
HYDROELECTRIC CORPORATION
Renewables Capability Presentation All Energy May 2017
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Icebreaker Wind Supply Chain Open House
Nuclear Power - a reliable partner
INSTRUCTOR © 2017, John R. Fanchi
Bureau of Ocean Energy Management
Underwater Storage Technologies for Offshore Wind Energy
Introduction Life cycle impacts to be considered for several LEANWIND innovations, including: foundation design vessel design novel O&M methods Initial.
FRANCE THLG member since 2015
Presentation transcript:

Offshore Wind Project Logistics & Unique Site Technology Investigation – Fabrication - Installation Presentation to: Virginia Offshore Wind Supply Chain Educational Forum December 2010, Richmond Tom McNeilan, General Manager, Fugro Atlantic, Norfolk, VA

Foundation Requirements for OW Turbines Foundations & Substructures are the components you can not see beneath the sea Investigation – Fabrication – Installation Large structures Many of them Heavy industry required to manufacture & fabricate Large plant required to install Type, design, installation & performance depend on subsurface December 2010

Fugro - Investigates Planet Earth Fugro is the world’s largest and most technologically-advanced firm that:  collects, interprets, and analyzes data from and below the earth’s surface and  provides advice for projects based on that data. Primary supplier of our services to the offshore Oil & Gas (O&G) industry in the Gulf of Mexico (since the late 1940s) and around the world Primary supplier of these services to the European offshore wind industry since its inception (> 100 OW developments) December 2010

Timeline of Development of Offshore Wind in Europe - What Can We Learn from Europe? Mid 1990s - Initial demonstration projects (a few WT of 700kW to 1.5MW) Early 2000s - Initial small projects (5 to 30 WT of 1.5 to 2.5MW) Mid to Late 2000s – Additional projects with more and larger WTs Circa 2009 – Evolution from projects to an industry Starting in 2008 – Each year add 50% of the previously installed capacity December 2010

The Status of Offshore Wind Industry in U.S. Initial project proposed early to mid 2000s Of those initial legacy projects, only Cape Wind is still alive Starting about 2008, additional developer projects proposed Regulatory authority (in federal OCS) passed to former MMS in 2009 MMS renamed BOEMRE in summer 2010 No federal legislation allowing sizable credits or feed in tariffs Only 1 met mast installed and no Wind Turbines installed to date Areas: Northern Mid Atlantic Great Lakes Central Mid Atlantic Texas Maine What opportunities does this provide to the Commonwealth? December 2010

Foundation Requirements for OW Turbines Foundations & Substructures are the components you can not see beneath the sea Investigation – Fabrication – Installation December 2010 Gravity Base Monopile Tripod Jacket

Monopile Tripile Construction Tripod Construction Jacket Construction Transition Piece Foundation Requirements for OW Turbines

Understanding the Importance of the Subsurface What you can’t see can hurt you - The mysteries beneath the sea It costs significant $s to define and understand the mysteries beneath the sea Open ocean surveys and investigations require large vessels, sophisticated equipment, and experienced personnel HSE Exposure This is often the 1 st major expense of an OWF project December 2010

Monopile Tripod Jacket Steel MillPipe MillTransportSteel MillPipe Mill Transport AssemblySteel MillPipe MillAssembly Transport Foundation Requirements for OW Turbines Manufacturing – Fabrication Process Courtesy EEW

Milling Cutting Inside lg. welding Milling Outside lg. welding CalibrationAssembly Inside circ. welding Milling Outside circ. welding Testing (Ultrasonic,…) Rolling Storage Monopile Manufacturing – Fabrication Process

Pipe productionAssemblyStorageCoating/Storage Finishing Secondary Steel Transition Piece Fabrication Process Courtesy EEW

Typical Commercial OWF – Thanet in UK Monopile Foundations 100 Wind Turbines 13- to 17-ft-diameter 130- to 200-foot-long 38,000 tons of steel 1,600# 2.5- to 3.75-inch plates Transition Pieces 70-foot-long 12,000 tons of steel 700# to 3-inch plates 5,000 tons of secondary steel Coatings 40,000 gallons of coatings December 2010 Foundation Requirements for OW Turbines Courtesy Smulders

Foundation Requirements for OW Turbines December 2010 For the 350 MW Thanet project 18 different fabrication facilities 500,000 man-hours 55,000 tons of steel The tons of steel required for the foundations for 100 WT ~= the tons of steel required for a nuclear aircraft carrier

Staging area requirements Dock side requirements Transportation fleet At sea requirements December 2010 Logistics for OW Turbine Foundations

Staging area requirements Dock side requirements Transportation fleet At sea requirements Transportation Requirements for OW Foundations

Open ocean environment Large & heavy lifts Many lifts Tolerances December 2010 Foundation Installation for OW Turbines

Open ocean environment Massive pile hammers December 2010 Foundation Installation for OW Turbines

Foundation Installation for OW Turbines Completed installation Pile in the ground Transition piece in place

Desirable Experience Requirements What are the Desirable Attributes and Experience for Firms who wish to be involved on Offshore Wind in the US? Experience with projects in the Open Ocean Experience with Offshore Wind development Knowledge/track-record dealing with the MMS/BOEMRE Knowledge of the Local conditions These needs apply to: Siting & environmental considerations Investigation and engineering considerations Design Fabrication Installation Operations & Maintenance December 2010

Where will the U.S. Offshore Wind Industry find supply chain expertise for offshore wind energy development? Northern Europe OW Industry + offshore wind experience + open ocean experience – lack of MMS experience – not local Gulf of Mexico O&G Industry + open ocean experience + MMS experience – no offshore wind experience – not local East Coast & Great Lakes Marine Industry – waterfront, not open ocean – no MMS experience – no offshore wind experience + local Where will the Industry Find Appropriate Expertise? December 2010 !

Opportunities for the Commonwealth Leverage the on-the-water assets in Hampton Roads Protected harbor with ocean access Existing at dock capacity Ample on water marshalling area Suitable water depth No air height restrictions Leverage the business friendliness of the Commonwealth Access to businesses and people with appropriate skills Ship repair, manufacturing Technical, blue collar work force Ex Navy personnel Connectivity with the Great Lakes / Heartland region December 2010

Fugro Global Experience – Local Presence On behalf of Fugro, I appreciate the opportunity to present these thoughts, and look forward to future opportunities to advocate the development of offshore wind energy in the U.S. Thank You Tom McNeilan