Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.

Slides:



Advertisements
Similar presentations
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Advertisements

County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
CENTRAL CORRIDOR TRANSIT ACCESS STUDY Citizens for Modern Transit March 27, 2014.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 Riverside County - Orange County.
California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
INTRODUCTION TO INFRASTRUCTURE: AN INTRODUCTION TO CIVIL AND ENVIRONMENTAL ENGINEERING Chapter 4: Transportation Infrastructure.
FTA’s Small Starts Program Charlotte, North Carolina October 11, 2007.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
New I-65 Interchange at Worthsville Road Welcome!.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Los Angeles County Metropolitan Transportation Authority Douglas R. Failing, P.E. Executive Director, Highway Program Public Private Partnerships CTF Transportation.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
Longmeadow Parkway Fox River Bridge Corridor
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
The RHNA and Sustainable Communities Strategy Joe Carreras, Program Manager, Housing and RHNA Southern California Association of Governments October 2010.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
California High-Speed Train Project California High-Speed Rail Metro Bus Operations Subcommittee January 2010.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
New Starts/Small Starts and BRT: An Update APTA Bus Conference Seattle, WA May 5, 2009.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
Metropolitan Bakersfield High- Speed Rail Terminal Analysis and Evaluation A Presentation to the California High-Speed Rail Authority By the Kern Council.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
PROJECT UPDATE PUBLIC OPEN HOUSE #5 MARCH 12 4:00 PM – 6:00 PM Northern Service Center.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
Indian Hill Boulevard Grade Separation Proposal, January 25, 2016.
Indian Hill Grade Separation City Council Meeting February 23, 2016.
Prepared by: Alex Fisch Planning Services Division.
RIVERSTONE CONNECTION STUDY Task Force Meeting #4 June 19, 2013.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Central Polk Parkway PD&E Study
I-85 Corridor Light Rail Transit Feasibility Study
Chicago Transit Authority
White Flint North Entrance Feasibility Study
Presentation transcript:

Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report

Alternative Alignments

Design Guidelines 1.Consistency with the Metro Green Line technology and Standards 2.Maintain a minimum operating speed of 40 miles per hour 3.Maintain 2.5 minutes headway 4.Maintain option for a connection with Orange County 5.Provide for convenient transfers between Metro Green Line, Metrolink, Orange County Fixed Guideway Transit and Buses at the Norwalk/Santa Fe Springs Transportation Center

Evaluation Criteria 1.Minimize negative impacts on the surrounding community 2.Avoid major utility disruptions 3.Avoid costly engineering obstacles 4.Minimize travel times 5.Emphasize cost effectiveness

Alternative 1-A and 1-S

Alternative 1-A (Aerial Guideway) Alternative 1-A is approx. 2.8 miles long Alternative 1-A study alignment would be adjacent to 42 single-family and 28 multi- family buildings Eight properties would need to be acquired Crossing over I-5 would be at a very high elevation (approx. 67 feet) Crossing Firestone Blvd. Would necessitate very long spanned striders ( feet) Traffic impacts would be low

Alternative 1-S (Subway) Alternative 1-S is approx. 2.6 miles long and would have the shortest travel times of all alternatives Impacts on utilities would be minimal Construction process would require crossing beneath a portion of Imperial Highway while a vent shaft is constructed, and a construction staging area would be needed for tunnel construction Alternative 1-S subway study alignment would have minimal adverse impacts on adjacent buildings

Alternative 2 (Aerial Guideway)

Alternative 2 is approx. 3.4 miles long and would have the lowest overall operating speed of all alternatives because of severe curvilinear alignment Moderate impacts on utilities expected A high elevation crossing of I-5 would be required (approx. 67 feet) Alternative 2 study alignment would be adjacent to 44 single-family units and 21 multi-family buildings Expected traffic impacts would be moderate

Alternative 3 (Aerial Guideway)

The longest of all alternatives (approx. 3.6 miles) resulting in the longest travel time Impacts on utilities would be moderate A high elevation crossing of I-5 would be required (approx. 67 feet) Partial right-of-way takings for roadway required at I-5 and Imperial Highway, Foster Road and Firestone Boulevard Study alignment would be adjacent to 142 single-family units and 29 multi-family buildings Traffic impacts would be high

Results of The Evaluation The consultant team recommended that Route Alternatives 2 and 3 be dropped from further consideration due to their higher costs, longer travel times, slower operating speeds and more extensive environmental impacts The consultant team felt that the subway Alternative 1-S along Imperial Highway was more advantageous due to its shorter length, higher operating speed, comparable cost with the aerial alternative along Imperial Highway and fewer environmental and traffic impacts

Results of The Evaluation (contd.) On May 27, 1992 the MTA Board decided that both the aerial and subway alignments along Imperial Highway should be carried forward through the EIR process.

Project History On February 24, 1993 the MTA Board (LACTC) certified the EIR for both the aerial and the subway alignments Staff was directed to return with Findings, Statement of Overriding Considerations, and Mitigation Monitoring Program for adoption when project is approved and a Notice of Determination is authorized

Project History continued Estimated 2004 cost for the Subway Alignment 1-S is $360 million and for the Aerial Alignment 1-A is $321 million The EIR would need to be updated to current conditions including SCAG forecasts, ridership projections, engineering assumptions and construction cost estimates

Alignments Studied