INDUSTRIAL TRAINING INSTITUTE (GIRLS) IMC SOCIETY, BARSHI ROAD, LATUR District -LATUR, MAHARASHTRA STATE Tel. No Fax No UPGRADATION WITH VIDEOCON INDUSTRIES, AURANGABAD AS INDUSTRY PARTNER ESTD.1992 S-1
S-2 Sr. no.ACTIVITYDESCRIPTION 1 Institute CategoryWomen 2 EstablishmentAugust, Intake228 4 Total Land6.07 Hectors 5 Construction of building sq.mts 6 Plantation2180 trees 7 IMC formation Industry PartnerM/s Videocon Industries Limited Aurangabad 9 Awards -Rajiv Gandhi Prashaskiya Gatimanta Abhiyan 2006,2007, 2008 & 2009 from DistrictCollector,Latur ABOUT INSTITUTE
TARGET AND ACHEIVEMENT Sl No ParticularsTargetAchievement 1Expansion – Intake (In Nos.) TO 324 2Loan Amount Received (Rs. In Lacs) Seed Money (Rs. In Lacs) Civil Work (Rs. In Lacs) Machinery & Equipment (Rs. In Lacs) Lab Set up Furniture (Rs. In Lacs) All Other Expenses (Rs. In Lacs) S-3
CIVIL WORK STATUS CONSTRUCTION OF COE BUILDING Built up Area 7406 sq.ft. Estimated Cost87.76 lakhs Accepted Rate by the Contractor lakhs Savings in construction cost35.55 lakhs Total proposed expenditure lakhs Total Expenditure as on today54.14 lakhs EXISTINGCOE S-4
ACADEMICS 100 % Admissions AITT Results above 90% Continuous guidance from the higher authorities and faculties. Visit of Hon. Bhanwar Lalji, Principal Secretary, AP Govt. to DM under IMC Display of quality jobs (COE) VISIT OF HON. J.D.BHUTANGE SAHEB DIR.(TRG) MUMBAI YearAdmi ssion Appea red Drop outs PassedResult %8385% %6990 % %9991 % SPECIAL EVENTS S-5
Exclusive Data Bank YEARAPPEAREDPASSED OUT EMPLOY ED SELF EMPLOY MENT Further Edn TOTAL ABSTRACT Placement in Partner-Industry VIDEOCON INDUSTRIES LTD. Aurangabad Placement in ONIDA, Thane Placement in B.G.APPLIANCES A’bad MOU likely to be signed with BOMBAY RAYON Fashions limited Latur for supplying trained woman for garment factory. Project requirement is 1500 trained woman PLACEMENTS 90% TCPC S-6
INFRASTRUCTURE FACILITIES UPGRADED EXTERNAL BEFOREAFTER ENTRANCE APPROACH BEUATIFICATION S-7
BEFORE- 300 Sapling PLANTATION S-8 AFTER Sapling INFRASTRUCTURE FACILITIES UPGRADED EXTERNAL
BEFOREAFTER DM SECTION S-9 INFRASTRUCTURE FACILITIES UPGRADED BUILDING BACK SIDE OLD BUILDING COE NEW BUILDING
BEFOREAFTER IT & ESM SECTION SP SECTION INFRASTRUCTURE FACILITIES UPGRADED-INTERNAL S-10
BEFOREAFTER FURNITURE SET- UP EBT - 4 FURNITURE SET UP CLASSROOM INFRASTRUCTURE FACILITIES UPGRADED-INTERNAL DUAL DESK SAMPLE SANCTION ORDER PLACED S-11
INFRASTRUCTURE NEWLY CREATED FOR COE COE NEW BUILDING LAB SET UP EBT -3 (WITH SECTION LIB) LAB SET UP EBT -2 (WITH SECTION LIB) LAB SET UP EBT -1 S-12
INFRASTRUCTURE NEWLY CREATED FOR COE S-13 LAB SET UP EBT -4 LAB SET UP EBT -5 AL PARTITION LAB SET UP EBT -6
OTHER ACTIVITIES Installation of garden lamps Installation of solar lamps S-14 Plantation ( maintenance ) Rain-Water Harvesting
OTHER ACTIVITIES S-15 Eye camp Free medical check ups Yoga Training
Attitude Change Training for Trainers & Trainees Art of Living – Navchetana workshop from to Meditation, Pranayama, the health, hygene in daily life & human values. Closing ceremony by DY. Collector, Anadkar saheb Art of Living – Navchetana workshop of Shri Shri Ravishankarji through art of living family, Latur branch-head Dr. Pranita Chakurkar. S-16
Overall Cleanliness – 5 S S-17
AWARDS- Rajiv Gandhi Prashaskiya Abhiyaan Award S
IRG ThroughBenefi ciaries Income (Rs. In lakhs MES & Short Term Courses POTS-0.69 COE Fees & IMC Quota Admissions TOTAL16.43 RESOURCE GENERATION ( ) It’s Woman ITI Out of Rs lacs, the amount actually received is Rs.6.02 lacs. Remaining Rs.10.41lacs is awaited from RDAT, Mumbai Mrs. Mahalaxmi Fulware, Income –Rs.8000/- p.m. Mrs. Gadade Chhaya Digambar, Income- Rs.6000/- p.m. S-19
Resource Generation ( ) It’s Woman ITI Mrs. Gaikwad Rajashri, Income-Rs.9000/- p.m. Mrs. Chapolikar Anita, Income, Rs.7000/- p.m. Mrs. Pawale(Ex-PFV Trainee-, Income- Rs. 8000/- p.m. Mrs. Devre Prabhavati, Income-Rs.10000/- p.m. S-20
S-21 Sr. no. ACTIVITYDOI 1 Revenue Generation of Rs.12 lacs Thr’ Advance courses in Animation,Web Designing,MES,POTS,etc By Dec’ Advance Module TrainingAUG’ % Admissions to ALL TRADESAUG’ %Placement of Electronics,COPA,SP Advance Module thro’IMC By Dec’ To Fullfill demand of BRFL by inducting 1500 trained woman in Garment Sector Sep’10 6 To Start Hi-Tech Garment Training CentreAug’10 MOVING FORWARD