Coast Economic Consulting By L. Jan Reid 831-476-5700 CEM vs. the CPUC: Why are RPS Contracts Labeled Top Secret?

Slides:



Advertisements
Similar presentations
Will CO2 Change What We Do?
Advertisements

Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Hedging Energy in the New Marketplace Scott E. Thompson Portfolio Director SPP/ERCOT.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
1.  What is a Renewable Energy Credit (REC)?  What are they used for?  Who uses them?  How is REC ownership tracked?  What is the Renewable Portfolio.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Session 3: The Federal Question: Setting a Good Precedent & Positioning California for Competitive Advantage California Public Utilities Commission Greenhouse.
The Green Rush Implementing Renewables in California Dave Ashuckian, P.E. Deputy Director Division Of Ratepayer Advocates Power Association of Northern.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
California’s Energy Efficiency Shareholder Incentive Mechanism CSEM Policy Conference December 9, 2008 Tom Roberts, Regulatory Analyst
Slide 1 Policy Alternatives to Stimulate Private Sector Investment in Domestic Alternative Fuels Wally Tyner with assistance from Dileep Birur, Justin.
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
The California energy crisis Introduction (Wolak March ‘01) –Wholesale: averaged $33 MWH in 1999, $116 MWH in 2000, $310MWH Jan –Natural gas $3-$4.
Energy Production and Use in California Source: California Energy Commission
Implementing one of the most ambitious renewable energy standards in the country California’s Renewable Energy Programs Implementing one of the most ambitious.
California’s Electricity Crisis: What Happened and Why? Joe Eto and Chris Marnay Electricity Markets and Policy Group EETD’s.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Henwood Consulting What’s Up ? California Electric Generation Markets Gary L. Hunt Managing Director.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
California Energy Commission HEATHER RAITT Technical Director Renewable Energy Program Proposed Changes to RPS Guidelines April 17, 2006 Proposed Changes.
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
California’s Renewable Energy Credits (REC) Market Update
Avoided Costs of Generation
1 Macroeconomic Impacts of EU Climate Policy in AIECE November 5, 2008 Olavi Rantala - Paavo Suni The Research Institute of the Finnish Economy.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
1 CPUC Avoided Cost Workshop Introduction and Overview.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
1March 24, 2000California PX Demand Responsiveness Workshop Christensen Associates Lessons from California The Role of Demand Response Energy Markets in.
CALIFORNIA ENERGY COMMISSION NATURAL GAS ASSESSMENT: SHORT AND LONG TERM Briefing to the Legislature Assembly Utilities and Commerce Committee January.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
Selected Geothermal Resource Topics from a Utility Perspective Geothermal Power Generation Workshop May 11, 2003 Ken Dragoon PacifiCorp
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
SDG&E’s Proposal to Implement AB 920 July 9, 2010.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Electricity Regulatory Commissions in India: Resources, Transparency and Public Participation Shantanu Dixit Prayas, Pune, India
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Resolutions E-4168 and E-4157 Southern California Edison (SCE) requests approval of contracts with a new wind facility and a new solar photovoltaic facility.
Rocky Mountain States Sub-Regional Transmission Study December 9, 2003 Generation Additions Strawman.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
The Effect of Environmental Regulation upon the Electric Power Industry: A Rating Agency Perspective 23rd February 2005 At the California Public Utility.
RENEWABLE ENERGY PROCUREMENT February 6, PROGRAM OVERVIEW In 2002, just 1% (141,026 MWh) of SDG&E’s portfolio was from renewables. In 2002, SDG&E.
Demand Response
Extra electricity slides
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Renewables Portfolio Standard Status Report California Public Utilities Commission February 26 th, 2008.
Overview: California Renewables Portfolio Standard (RPS) Program Presented by Paul Douglas RPS Program Manager California Public Utilities.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Michigan Public Power Agency Wind Energy Supply Agreement
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Northwest Power and Conservation Council The Role of Electric Energy Efficiency in Reducing PNW Carbon Emissions Tom Eckman Manager, Conservation Resources.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
SDG&E Procurement Perspective IEPA 35th Annual Meeting September 21st, 2016 Dan Skopec Vice President, Regulatory Affairs Sempra Energy Utilities.
Generation Expansion Daniel Kirschen
Electric Service for Residential and Small Business Customers
Presentation transcript:

Coast Economic Consulting By L. Jan Reid CEM vs. the CPUC: Why are RPS Contracts Labeled Top Secret?

Background  M.S. in Economics and Finance from University of California (1998)  CPUC Office of Ratepayer Advocates (ORA) staff member  Economic Consultant  Witness and advisor in cases related to the procurement of electricity and related fuels, demand response, the cost-of-capital, capital adjustment mechanisms, and emergency power-restoration standards  Workshop presentations include seminars on risk, effects of deregulation; performance incentives; and utility performance standards  Developed models to evaluate procurement contracts, utility cost-of-capital, post-emergency electricity restoration time, elasticity of demand, and market power effects COAST ECONOMIC CONSULTING2

Topics  The “California Energy Markets” request for Renewables Portfolio Standard (RPS) Contract Data.  RPS Costs  Why RPS Prices are not as high as they seem COAST ECONOMIC CONSULTING3

In Perspective California requires each load-serving entity (such as PG&E) to serve 33% of its load with renewable energy by (Executive Order S-2109) The California Public Utilities (CPUC) mandates that utilities progress toward their RPS goals via an annual procurement target (APT). As of the end of 2010, PG&E was at 17.7% renewables, SCE was at 19.4%, and SDG&E at 11.9%. Thus, PG&E’s portfolio would have to be 18.9% renewables in 2011, 20.1% in 2012, 21.3% in 2013, etc. 25% of the APT can be met by purchasing renewable energy credits, rather than actual electricity. COAST ECONOMIC CONSULTING4

In Perspective (continued) The CPUC is required by state law to establish a Market Price Referent for RPS contracts. The MPR is set by on-line date and by contract length. Regulated utilities typically hold one RPS solicitation per year in which they receive bids for RPS contracts. All utility procurement costs are paid for by consumers. The utilities are required to procure a planning reserve margin (PRM) of 16-18%. The utilities’ resource adequacy (RA) requirement is based on the PRM. The utilities must procure RA for both system and local requirements. Thus, a contract which provides either system or local RA decreases the utilities’ requirements. COAST ECONOMIC CONSULTING5

The Public Records Request COAST ECONOMIC CONSULTING6 November 2010: California Energy Markets filed a Public Records Request with the CPUC. The CEM asked the CPUC to disclose the price of already- approved Renewables Portfolio Standard (RPS) contracts. The CPUC claimed confidentiality and denied the request. The CPUC considers RPS contract prices to be market-sensitive. According to CEM, “El Dorado Energy, a 10 MW thin-film PV project in Boulder City, Nev., sells power to Pacific Gas & Electric at rates ranging from a low of $158.46/MWh to a high of $279.39/MWh, with an average of $ ” (CEM 1115 [11])

The Arguments Against Disclosure COAST ECONOMIC CONSULTING7 Bidders in renewable-energy solicitations would bid just below the disclosed price, which would harm competition. Market troubles similar to those encountered during the energy crisis might occur. Information cannot be released because the CPUC considers it privileged. CEM believes that “Of course, the real reason the CPUC may want to keep prices clandestine is that it fears public backlash against the RPS program for its high costs.” (CEM 1115 [11])

1.Utilities file the anuual cost of all of their contracts with the Federal Energy Regulatory Commission (FERC). The price information is publicly available. 2.Consumer advocates would love it if RPS developers bid just below the average price paid in the last solicitation. Since 2005, the MPR for 20-year contracts has risen by 66.91% while spot prices for electricity at NP-15 have fallen by 44.09%. 3.The CPUC already publishes a Market Price Referent for RPS contracts. (See Slide 10) 4.Every exchange provides bidders with the current bid and ask price for each product (including electricity products). COAST ECONOMIC CONSULTING8 Four Inconvenient Facts

COAST ECONOMIC CONSULTING9 Reasons for High RPS Prices 1.Construction prices have risen. For example, steel prices have risen by 76% over the last four years. 2.Prices for key parts (such as turbines) have risen dramatically. After all, when demand increases and supply remains the same, prices rise. 3.Financing costs have risen significantly. 4.Most importantly, the government-created demand for renewables rises every year. As utilities get closer to their RPS goal, prices rise. 5.Prices rise because demand is increasing and supply is relatively fixed.

The MPR ( ) COAST ECONOMIC CONSULTING10

Financial Benefits of Renewables COAST ECONOMIC CONSULTING11 Decreases greenhouse gas costs. In 2008, the Synapse medium-term forecast estimated that CO 2 costs would increase from $17.30/ton in 2014 to $53.40/ton in Typically 20-year fixed-price contracts, thus avoiding natural gas price volatility Decreases RA costs Provides a hedge against inflation and natural gas price volatility Avoids fines imposed on older, dirtier plants. During the energy crisis, fines resulted in energy prices as high as $1,700 MWh on some plants, paid for by consumers.

The Northstar Project (AL 3759-E) COAST ECONOMIC CONSULTING12 Duration20 Years LocationMendota, Calfornia Generation TypeSolar On-line Date2013 Project ViabilityHigh MPR$108.98/MWh Environmental Value$31.00/MWh PriceAbove MPR Benefit/Cost Ratio1.03

Why does the contract have a high value? COAST ECONOMIC CONSULTING13 1.The contract doesn’t begin for three years, thus hedging inflation risk. 2.The project is highly viable. 3.The project will deliver power in a significant number of peak and super peak hours, when the market price of electricity is highest. 4.The project is located in California and thus will provide economic benefits to the residents of California.

Resources COAST ECONOMIC CONSULTING14  California Energy Markets  California Public Utilities Commission  Federal Energy Regulatory Commission,  Synapse