MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.

Slides:



Advertisements
Similar presentations
ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Advertisements

The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
University Medical Center of Princeton Alexander J. Burg Structures Option Senior Thesis 2012 Faculty Advisor: Professor Parfitt Introduction Architecture.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
THE COMMONWEALTH MEDICAL COLLEGE (TCMC) SCRANTON, PAXIAO YE ZHENG | STRUCTURAL OPTIONSENIOR THESIS 2013 ADVISOR: HEATHER SUSTERSIC.
Reading Structural Drawings
JOSEPH MUGFORD THESIS PRESENTATION SPRING 2007 SOHO HIGH RISE CONDOMINIUMS A STUDY OF LIGHTWEIGHT CONCRETE CONSTRUCTION.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Jonathan Coan AE Senior Thesis April 10, 2012 Weill Cornell Medical Research Building New York, NY Images courtesy of Ennead Architects.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
TYPICAL member spot checks & alternate systems design study
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Reinsurance Group of America (RGA) Global Headquarters Natasha Beck Structural Option Faculty Advisor: Heather Sustersic Images courtesy of Gensler & Tom.
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
N EW Y ORK, N EW Y ORK 100 Eleventh Avenue © Tyler E. Graybill | Structural Option AE Senior Thesis Presentation | April 12, 2010 Faculty.
Brad Oliver – Structural Option Advisor – Professor Memari.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
NEW VIRTUA VOORHEES HOSPITAL Voorhees, NJ Paul Stewart Structural Option Senior Thesis Presentation 2010 The Pennsylvania State University.
Computer Associates International, Regional Office
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Upper Campus Housing Project
Pearl Condominiums Philadelphia, PA
An-Najah National University Faculty of Engineering
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
North Shore at Canton The Pennsylvania State University
An Najah National University Submitted to : Dr.Munther Diab .
RiverView Condominiums II Chicago, IL
Presentation transcript:

MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION BUILDING INTRODUCTION OWNER: MARYLAND INSTITUTE COLLEGE OF ARTS ARCHITECT AND ENGINEER: RTKL ASSOCIATES CIVIL ENGINEER: KCW ENGINEERING TECHNOLOGIES GENERAL CONTRACTOR: WHITING TURNER LANDSCAPE ARCHITECT: HIGGINS LAZARUS  122’ TALL  9 STORIES PLUS MECHANICAL PENTHOUSE  108,000 SQFT  64 APARTMENTS  MULTIPURPOSE “BLACK BOX” THEATER  COURTYARD  CAFÉ  STUDIOS

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION SLABS:  TWO WAY FLAT PLATE  8” THICK COLUMNS:  TWO CONCENTRIC RINGS  12”x12” – 24”x24”  CIRCULAR EXTERIOR  36” DIAMETER UNIQUE CONDITIONS:  BLACK BOX ROOF  41’ SLENDER COLUMNS EXISTING STRUCTURE

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION CONCRETE SHEAR WALLS DRILLED CAISSONS 360 o CURTAIN WALL FAÇADE EXISTING STRUCTURE

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION CHANGE USE TO MUSUEM BENEFITS:  CIRCULAR FLOOR PLAN  ARCHITECTURAL SIGNIFICANCE  OTHER APPROPRIATE SPACES DETRACTIONS:  LOW DESIGN LIVE LOADS  LOW FLOOR TO FLOOR HEIGHT  POOR SUNLIGHT CONTROL THESIS CHALLENGE

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION INCREASE LIVE LOAD:  40 PSF – 100 PSF INCREASE FLOOR TO FLOOR HEIGHT:  10 FEET – 15 FEET  LEVEL 4 – LEVEL 7  ELMINATE LEVELS 8, 9 DECREASE SUNLIGHT EMITTED INTO BUILDING:  USE SOLID PANELS  USE REFLECTIVE/ABSORBANT GLASS ARCHITECTURAL CHANGES:  FLOOR PLAN  CIRCULATION PROPOSED SOLUTION

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION SLAB ANALYSIS:  EQUIVALENT FRAME METHOD  FLEXURE  PUNCHING SHEAR  DEFLECTIONS SLAB DESIGN:  12” THICK  #6 USED FOR FLEXURE  12” BOTTOM MAT  3” FOR SHEAR GRAVITY SYSTEM DESIGN

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION COLUMN ANALYSIS:  41’ TALL SECTION  STANDARD 15’ TALL SECTION  spCOLUMN  SLENDERNESS CHECK COLUMN DESIGN:  36” – 42” DIAMETER EXTERIOR  11 #10’s  SLENDERNESS CHECK OKAY  24”x24” – 30”x30” INTERIOR  8 #10’s  CONTINUOUS SIZE LEVEL 4 - ROOF GRAVITY SYSTEM DESIGN

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION ETABS MODEL:  UPDATED SLABS AND COLUMNS  UPDATED FLOOR TO FLOOR HEIGHT  SHEAR WALLS - MESHED SHELLS  LATERAL AND GRAVITY 1 ST ANALYSIS:  SEISMIC IN Y DIRECTION CONTROLLED  SHEAR WALLS INADEQUATE IN FLEXURE  INCREASED LENGTH 4’ LATERAL SYSTEM DESIGN

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION 2 ND ANALYSIS:  ACCEPTABLE DEFLECTIONS AND STORY DRIFT  CHECKED OVERTURNING MOMENT SHEAR WALL DESIGN:  36” BOUNDARY ELEMENT  12 #11’s WITH #3 12”  VERTICAL SHEAR  HORIZONTAL SHEAR FOUNDATION DESIGN:  SHEAR WALL CAISSONS  CRSI 2008 HANDBOOK  ADEQUATE SHAFT AND BELL SIZES LATERAL SYSTEM DESIGN

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION DESIGN ASPECTS:  LARGE VIEWING SPACES  OPEN GALLERIES  CIRCULATION  SUNLIGHT CONTROL  REST AREAS DESIGN CHANGES:  APARTMENT REMOVAL  MUSEUM STORAGE AND MAINTENANCE  RESTROOMS  ART ALCOVES ARCHITECTURAL BREADTH

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION FAÇADE CHANGES:  CONTROL SOUTH SIDE  INCREASED USE OF SOLID PANELS  REFLECTIVE AND ABSORBENT GLASS ARCHITECTURAL BREADTH

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION COULD HAVE BEEN DESIGNED AS MUSEUM SYSTEM TYPES FEASIBLE SIGNIFICANT STRUCTURAL STRENGTHENING SIGNIFICANT ARCHITECTURAL CHANGES INCREASED MATERIAL AMOUNTS = HIGHER COST CONCLUSION

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION MARYLAND INSTITUTE COLLEGE OF ARTS RTKL ASSOCIATES  BOB KNIGHT  PETE MALMQUIST  DAVID DYMOND  ADAM REED PENN STATE ARCHITECTURAL ENGINEERING:  PROFESSOR HEATHER SUSTERSIC  PROFESSOR KEVIN PARFITT  PROFESSOR BOB HOLLAND FRIENDS AND FAMILY ACKNOWLEDGEMENTS QUESTIONS AND COMMENTS

PRESENTATION OUTLINE BUILDING INTRODUCTION EXISTING STRUCTURE THESIS CHALLENGE PROPOSED SOLUTION GRAVITY SYSTEM DESIGN LATERAL SYSTEM DESIGN ARCHITECTURAL BREADTH CONCLUSION APPENDIX MATERIAL INCREASE:  SLAB CONCRETE: 27%  COL. CONCRETE: 26%  COL. STEEL: 21% DEVELOPMENT LENGTH:  6’ BEYOND IN FRAME 1  5’ BEYOND IN FRAME 2  7’ BEYOND IN FRAME 3  BOT. BARS CONT. HOOKS:  90 o  6” BOT. BARS  9.8” TOP BARS