FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
FESA Vs 2.0 AB/CO TC - 12 Feb July 2004 FECOMSA FESA2 2.0β.
BE-CO work for the TS Nov 8 Nov 11P.Charrue - BE/CO - LBOC1.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
E. Hatziangeli – LHC Beam Commissioning meeting - 17th March 2009.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Controls Renovation for AB-BI Outline: Reminder of AB-BI-SW mandate History of controls renovation Renovation work-packages (-> 2012) – Projects known.
Barriere O, Le Roux P
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Stephane Deghaye (AB/CO) ATC/ABOC days.
Status and first objectives 14/06/2012Jean-Christophe Garnier1.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Wojciech Sliwinski for the BE-CO Middleware team: Wojciech Buczak, Joel Lauener Radoslaw Orecki, Ilia Yastrebov, Vitaliy Rapp (GSI)
T HE BE/CO T ESTBED AND ITS USE FOR TIMING AND SOFTWARE VALIDATION 22 June BE-CO-HT Jean-Claude BAU.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
Controls Renovations and End of Life (EoL) plan of major components of the controls infrastructure Eugenia Hatziangeli.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
Review of MPE activities during LS1 and outlook for LS2/LS3 View from BE/CO V.Baggiolini, M.Vanden Eynden On behalf of the BE/CO APS, DA, DO and FE Sections.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Post ACCOR until LS2: End of Life for CMW products CO3 meeting, 25th June 2015 Wojciech Sliwinski for the BE-CO Middleware team.
BE-CO review Looking back at LS1 CERN /12/2015 Delphine Jacquet BE/OP/LHC Denis Cotte BE/OP/PS 1.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
BE-CO Presentation FESA and O/S Support Post-ACCOR renovations until LS2 Front-End Platforms BE-BI TB, May 21 st, 2015 M.Vanden Eynden on behalf of BE-CO.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Feedbacks from EN/STI A. Masi On behalf of EN-STI Mathieu Donze` Odd Oyvind Andreassen Adriaan Rijllart Paul Peronnard Salvatore Danzeca Mario Di Castro.
POST-ACCOR renovations until LS2 – DEBRIEFING – Marine Pace, CO3 – 17 September 2015 Input from Chris, Marc, Stephen, Stephane, Wojtek.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
FESA S. Deghaye for the FESA team BE/CO. What happened since April? followed by “Our plans”
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
22/09/05CO Review: FESA IssuesJJ Gras [AB-BDI-SW] 1/18 AB-CO Review FESA  The Functionality  The Tools  The Documentation  The Support  Maintenance.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
European Organization for Nuclear Research Industrial Controls Engineering Department GUAPI working group meeting May the 6th 2015.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
V4.
Accelerator Controls Renovation Project “ACCOR”
Controls & software Andy Butterworth.
Status and Plans for InCA
LIU – EVM status and next steps
BE-CO LS1 review View from TE/ABT/EC
Middleware – ls1 progress and planning BE-CO Tc, 30th september 2013
Update on the Ethernet Network Installation Campaign
Progress, plans and experiences
BE-CO Activities for PSB
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
Presentation transcript:

FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users

Agenda FESA 3 Roadmap for 2013 and 2014 FESA 3 Adoption in BE FESA 3 Adoption in EN FESA 3 Adoption in TE Other groups Conclusions

FESA 3 Road Map – ‘13 FESA 3 follows ACCOR milestones – Development baseline milestone – 1 st of July 2013 – Operational baseline milestone – 1 st of Dec FESA 3 for early adopters was available early 2013 FESA 3.1 was released according to the ACCOR planning on the 1 st of July. Since then, many improvements and fixes released ( , and ).

FESA 3 Road Map – ‘13 The ACCOR Operational baseline is FESA 3.1 FESA will be released in Dec 2013 Reminder: minor version – Bug fixes – New features – Backward compatible

FESA 3 Road Map – ‘14 Next minor version will be in spring ‘14 (1.3) Next major version will be FESA 3.2 with RDA3. FESA 3.2 estimated release date: June ‘14 – for the SPS dry runs. FESA 3.1 and FESA 3.2 are fully compatible (except RDA)

FESA 3 Adoption

FESA in A&T Sector Many groups (12) in the A&T sector rely on FESA for their FEC software developments Also a few users outside the sector (PH, DGS) About 100 persons are registered FESA developers  Training for the new comers

FESA 3 Support & Training Since April ‘13, 2 courses on FESA 3 available – FESA Basics (2 days): should be mandatory for any new developer – FESA Advanced and Migration (1 day) Support team to help – Migration – New design – Problem with or in the framework – Try to solve in your team the C++ problems

FESA 3 Adoption in BE

BE/ABP HSL Linac 2 source migrated in FESA3 (99%) Linac4 source. FESA2 – low prio  after Linac 2 start- up SU See EN/ICE/PLC New development in FESA3 (lab only – 2014) LCU See EN/STI/ECE New development in collaboration with BI in FESA3

BE/BI 99% of the classes (100+) are FESA 2 FESA 3 is mainly under test & validation A few classes under migration (PSB BCTs, SPS Orbit, PSB/LN4 BLMs) All new developments based on FESA 3 from now on Plan: migrate quietly aiming at a complete renovation by end 2015 – FESA 2 end-of-life.

BE-CO-FE Generic classes 90% migrated to FESA 3 New developments in FESA 3 Operation: Restart with FESA 3 everywhere* OASIS New developments in OASIS  FESA3 Migration will start in 2014 *except LynxOS FECs

BE-CO-HT (Timing) All GM classes migrated to FESA 3 LTIM available in FESA 3 (32 and 64-bit) LHC Central timing in FESA 2 (redesign in 2014)  evaluate migration to FESA 3 FESA 3 in operation for – central timing of LIC, Linac4 and CTF. – LTIM: many installations (e.g. PSB BCT, CPS RF, FECs for Mil1553…).

BE/OP XenericSampler Migrating towards a post-processing only system Migration to FESA 3 done (some secondary features missing) Plan to start with FESA 3 version in the injectors

BE/RF Linac4: PLC control in FESA3 + plan move the power & low-level AD: 4 classes (stocatic cool + meas) in FESA3 – Old control (GM)  see ACCOR planning SPS: new dev (power and LL) in FESA3 LHC: new dev (damper) in FESA3 !! SPS & LHC = 130 FESA2 classes !! – Some LHC systems (cavity control) are planned to be renovated before the start-up

FESA 3 Adoption in EN

EN/ICE SIC QPS: Migrated to FESA 3 & under validation. Only solution for operation Totem roman pots: migration foreseen from January 2014 PLC LHC Cryo: migrated to FESA 3 & under validation. Plan to use FESA3 in operation Survey: migration in progress (waiting for cryo validation). Plan to use FESA3 in operation MTA Mainly FESA as communication layer (IEPLC) Migration on-going and nothing critical for start-up

EN/STI ECE – Baseline: migrate everything to FESA 3 pending validation – Ongoing validation with LHC Collimator (critical class) (90% done) – Will follow SPS, PS… LP (laser) – Renovation of an ISOLDE system (new dev  FESA3) – Photolab: Migration not started yet. Not critical (lab)

FESA 3 Adoption in TE

TE/ABT All new dev in FESA3 (LN4 pre-chopper…) LEIR Kickers GM migrated to FESA3 PS Continuous Transfer migrated to FESA3 PS KFA4, 13, 21 stay in FESA2 (FESA3 later – TS) SPS MKP, MKE6 in FESA3. MKE4 and MKD will follow pending validation LHC MKI in FESA3. LBDS will be migrated to FESA3 for the tests end of April.

TE/CRG FESA part handled by EN/ICE/PLC LHC Cryo in FESA 3 under validation Operational baseline

TE/EPC 99 % migrated to FESA 3 (1 REX power converter missing) Many devices already migrated in the DB 600 devices (PLC, RS422) to be migrated (Dec) Complete migration should be completed for the start-up

TE/MPE FESA2 classes for BIS, FMCM and SMP – Migration not started yet (tests with 1 BIS class) – Busy with PostMortem & RDA3 – Migration planned for 2014 or 2015 QPS (see EN/ICE/SIC) – Migrated to FESA 3

TE/MSC New development for PS B-train – Will be in FESA3

Other groups DGS-SEE – ARCON renov. – Operational deployment in S based on FESA3 PH-DT – Totem roman pot (See EN-ICE-SIC) – Possible new development  FESA3 if anything

Conclusions The ACCOR Operational baseline is FESA 3.1 Many groups have started the migration to FESA 3 Some groups with huge code base a bit behind  FESA team proposes active support (on location) to speed up migration Many critical systems are planned to restart with FESA 3 (QPS, Cryo, Collimators, many kickers, power converters…)