BI Outlook for 2013-15 BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC Beam instrumentation status LBOC 17 March 2015 E. Bravin BE-BI on behalf of many many people in several groups.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
BI Activities for LS2 Ray Veness for BE-BI.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Instrumentation and Tools for LIU and HL-LHC B. Mikulec with the invaluable input from many colleagues from ABP, OP, RF and BI HL-LHC/LIU Day 15 th of.
IEFC Workshop 2011 Session 2: “MTE and High Intensity Operation” Short summary/Follow-up items V.Mertens / T.Zickler Presentations: M.GiovannozziMTE Roadmap.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
Hardware Commissioning Review BDI Equipment
Status of the BI Work Package in the LIU-PSB frame
Beam instrumentation MDs
Beam Gas Imaging Kick-off meeting 30-Oct-2012
BE-CO Activities for LIU-CPS and LIU-SPS
BE-BI Activities and Status: LHC and Injectors
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
BE-BI Software for LINAC4
Status of the BI Work Package in the LIU-PSB frame
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Status of the MOPOS BI TB – 26th June 2014.
WPs concerned by L4 connection:
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
YETS PS + PS SWY + TT2 Facility Coordinator:
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
Status of the BI Work Package in the LIU-PSB frame
SPS Injection BIS - Draft requirements
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed

LINAC4: We will install and commission L4 beam instrumentation (BPM, BLM, BCT, Grids, scanners…) during LS1 following project progress L4 Beam Instrumentation

LEIR [Consolidation]: LEIR ECool collector exchange + replacement of the cathod. L4 Beam Instrumentation ECool

L2/3/PSB/PS [Renov]: SEM electronics will be renovated all over CPS complex. L4 Beam Instrumentation IPM SEM

L2/4 [LINAC4]: New PUs for LT, LTB and BI lines to PSB, including new electronics and SW. L4 Beam Instrumentation IPM SEM BPM

L2/4 [Consolidation]: New cables for BCT around inflector zone will be installed (the BCT on L4 side of the wall will not be cabled during LS1.). PSB [LIU]: New cable for PSB slow BCT for injection watchdog will not be pulled during LS1. L4 Beam Instrumentation IPM SEM BPM BCT

PSB Inj [LIU]: The cables for the observation monitor on H0/H- injection foil will not be pulled during LS1. L4 Beam Instrumentation IPM SEM BPM BCT BTV

PSB [LIU]: New cables for the new PSB orbit and trajectory system will not be pulled BUT this system will be installed and commissioned via existing OASIS channels with slightly reduced performance (S/N). Old system remains as is. L4 Beam Instrumentation IPM SEM BPM BCT BTV BPM

PSB [LIU]: New cables for the new PSB BLM system will be pulled in // to the old ones for the existing monitors in the ring only NOT for the extra 32 ring BLMs, NOT for the existing monitors in the transfer line, NOT for the new fast BLM requested. Old system will remain as is. New system will be commissioned in parallel in the ring L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM

PSB : General maintenance on BWS. We hope to be able reach 20 m/s in the PSB with present set-up. We also plan to improve our PM dynamic range during LS1 L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BWS

PSB [Consolidation]: New cables and monitors for PSB extraction fast BCTs will be installed L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT

HIE-ISOLDE: We will produce and deploy the new HIE ISOLDE diagboxes following project planning. Some issues remain to be tackled: i.e. Short FC limitations, manpower for the electronics development L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes

PS[Conso]: * New cables and monitor for the PS ring fast BCT will be installed * 1000 turn BCT will be made operational * BUT cables for TT2 BCTs may not be pulled. A cable tray (~100 m) is missing and would have to be financed. L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT

PS[LIU]: New cables for the PS BLM renovation (ring, TL and fast) will not be pulled during LS1. L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM

PS[LIU]: New cables for the PS BWS bunch by bunch measurement tests on SD68 will be pulled. We also plan to improve our PM dynamic range during LS1 but we cannot reach 20 m/s in the PS with current PS. L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS

PS[LIU]: 2 new WCM monitors will be installed. L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS WCM

AD[Consol]: * AD IPM will be moved and modified (strip readers instead of camera) * BBQ system will be deployed * Ctrl SW will be upgraded (ACCOR, Men, Linux). L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM

SPS[Consol]: Due to EN/EL constraints, the SPS BTV renovation will only be partial. BA1 will be done. BA2 feasibility is still under discussion. BA80 will only happen in 2015 during TCC2/TDC2 campaign. L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV

SPS[LIU]: The cables for TT10 BLM installation will not be pulled. L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM

SPS[LIU]: The new orbit and trajectory system fibers and cables will be installed for Pt5, 6 and 1(+). The old system will remain operational. BA 5 will be equipped to commission the new electronics L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS

SPS[NA61]: The new DCCT for personal protection (NA61) will be installed and commissioned at start-up. L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCT

SPS[LIU]: A new BWS prototype will be installed, provided enough space is found on cable trays. L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS

SPS[LIU]: The SPS BGI will be repaired and optimized (see comment LHC BGI). L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI

SPS[LIU]: A sync light telescope will be designed and deployed if we manage to find a place for our electronics where we can pull the necessary cables. …Under investigation… L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT

SPS[LIU]: Matching monitor installation will be finalized (for LHC as well) L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching

EAN: New GEMs will be deployed in the north areas L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching GEM

EAN: New ‘Scaler’ electronics will be deployed in the north areas with sampling rate > 100MHz L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching GEM SCALER

EAN: TBIU/ID instrumentation monitors and local cabling will be entirely renovated (same but new) L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching GEM SCALER TBIU/ID

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM GEM SCALER LHC: * The temperature controlled racks (BPM&BLM) will be installed in all surface buildings. * The collimator BPMs will be installed * Cables for BPM defined by ATLAS for their forward physics project will be installed

LHC: If the corresponding DIC is accepted (under discussion), diode BPM will be available around the experiments L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM Diode BPM GEM SCALER

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM BLM Diode BPM GEM SCALER LHC: * BLM cable upgrade campaign (NGFS18) will be done. * A prototype of cryo BLM will be integrated into a cryo magnet * Arc BLMs will be dismounted/remounted following LHC consolidation

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM BTV LHC: BTVSE/T/S repair of RF fingers will be done BLM Diode BPM GEM SCALER

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM BTV LHC: 2 of our 4 Fast BCTs will be replaced by ICT monitors. dT/dt interlock will be made ready for commissioning BLM Diode BPM GEM SCALER BCT

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM BTV LHC: Installation of PUs for gated tune measurements will be done BLM BBQ Diode BPM GEM SCALER

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM BTV LHC: * Installation of PUs for BGI calibration * BGI monitors repair and optimization will be done BLM BBQ BGI Diode BPM GEM SCALER

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM BTV LHC: * Full maintenance of the BWS * Installation of new bellows with extended lifetime will be done BLM BBQ BGIBWS Diode BPM GEM SCALER

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM BTV LHC: * Redesign of the extraction mirror tanks * Installation of the optical bench shielding will be done BLM BBQ BGIBWSBSRT Diode BPM GEM SCALER

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM BTV BLM BBQ BGIBWSBSRT Diode BPM GEM SCALER All: An international workshop on beam profile measurements is being organized (around March April) to review and optimized our developments on our instruments (this includes CPS and SPS monitors)

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM BTV BLM BBQ BGIBWSBSRT Diode BPM GEM SCALER CTF3/CLIC: * EO bunch length monitor commissioning * Additional segmented dump installation * test of Cherenkov fiber BLMs * Diffraction radiation studies… CTF3

L4 Beam Instrumentation IPM SEM BPM BCT BTV BPMBLM BCT HIE DiagBoxes BCT BLM BWS IPM BTV BLM MOPOS BCTBWS BGI BSRT Matching BPM BTV BLM BBQ BGIBWSBSRT Diode BPM GEM SCALER Voila! Sorry for the ones I forgot in this list. Just a word on 2 comments: on how to go from specs to proof of success? on things disappearing from the requirements It will clearly be a busy shutdown for all of us So let start with a well deserved drink!