21 –23 Feb 2005NORM Workshop 2005 PDO NORM Management System Brett Young.

Slides:



Advertisements
Similar presentations
EMERGENCY MEDICAL MANAGEMENT OF RADIATION CAUSALTIES IN HOSPITAL Module XVII.
Advertisements

NORM Training Shauna Landsberger MSPH Graham George, President
YOUR Hospital's DECON AREA A few things to consider.
We develop custom maps for clients in British Columbia, Alberta, Saskatchewan and Manitoba We assist our clients in identifying and managing their assets.
Bliss Area Sewage System Groundwater Monitoring Pete Ganzel Washington County Department of Public Health & Environment.
Naturally Occurring Radioactive Material Supervisors Training Course
RWE NUKEM The Design, Construction and Operation of NORM Descaling Plants E Taylor and L Fellingham.
Strategies for Implementing a Listeria Control Plan The Big Picture.
Mini A Probe (Gamma detector)
Inorganic Arsenic Training on the hazards of arsenic in the workplace Developed by the Division of Occupational Safety & Health (DOSH) for employee training.
Mercury in PDO Gas Processing Mercury Technology Services.
Hydrogen Workshop for Fleet Operators. Module 3, “Vehicle Operations and Maintenance Facilities”
Radiological Assessment - of effects from - Fukushima Daiichi Nuclear Power Plant May 13, 2011.
Gauges and well logging
Overview & Management of NORM in Saudi Aramco
AL FURAT PETROLEUM CO. NORM MANAGEMENT SYSTEM
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
EMERGENCY PLAN AND PROCEDURE IN INDUSTRY INVOLVING NORM/TENORM
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Update: 2/2/2012.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008.
1 AFPC Norm Decontamination Facility Plant (NDF) 1.Introduction - The passage of produced water through pipe work and plants leads to the built up of Norm.
WORKER SAFETY Radionuclides Web Cast August 4, 2004 Loren W. Setlow Office of Radiation and Indoor Air
Managing NORM - Oman and Regional Issues
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
1 III. Water Treatment Technologies Topic III. 7. Water Stability. General Arrangement of Water Treatment Plant Water Stability §Stability index (Index.
21 –23 Feb 2005NORM Workshop 2005 Costs of Managing NORM Brett Young.
Oman & PDO NORM Regulation and Specifications
Version One Naturally Occurring Radioactive Material Awareness Training Course.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Construction HSE Guideline _ 2005
Field Visit MODULE 8: Walkthrough of a Healthcare Waste Treatment Facility.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
Risk Based Approach to NORM Dr. Brian Heaton. When non specialist staff are responsible for identifying when a hazard exists the areas of concern need.
21 –23 Feb 2005NORM Workshop 2005 Controlling Exposures Brett Young.
1 Corporate Audit Learnings for Dissemination February 2010 Level 1 HSE MS Audit Learnings.
RADIATION SAFETY Mrs. Brinston. Introduction As a healthcare worker, you know that radiation is an important tool for detecting and treating diseases.
PDO NORM Storage Facilities
Table of Contents  General Description  Concept of RX Vessel and Location of Defect  Radiation Dose Control  Repair Schedule of Bottom Header Defected.
National Workshop on FSM, March 17, 2015
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
IAEA International Atomic Energy Agency Module 6.2: Source not under control (Mexico) IAEA Training Course.
8/18/2010Robert Fairchild LBNL Metals Moratorium Robert Fairchild Lawrence Berkeley National Lab Radiation Protection Group ASW-2010 Metals Moratorium.
Good Operating Practice. The importance of GOP General Listeria -specific GOP Specific food GOP These are in addition to the guidance available on the.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Update Presentation January 12, 2015 Town of Concord School Bus Transportation and Maintenance Center Town Project Team: Christopher Whelan – Town Manager.
PROTECTIVE ACTIONS AND REENTRY. Protective Actions Promptly and effectively implemented or recommended for implementation to minimize the consequences.
Management and Safe Disposal of Radioactive Waste Sulaiman Al Hinai Industrial Hygienist Petroleum Development Oman LLC.
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
NORM: Radiation Surveys (an Attempt for Source Inventory) Gert Jonkers Engineering & Analytical - GSEA/4 “ Problem Solving ” (Shell E&P Ionising Radiation/NORM.
Bear Trap Dunes Water Treatment Facility Report conducted by.
L4: GP TOOLS / 1 Asian Productivity Organization, Tokyo Brainstorming Idea 1 Supporting Idea 1 Extension to Idea 1 Opposing Idea 1 Idea 2 Idea 3 based.
Mu2e Target Hall Remote Handling - Contamination Control, Schedule, Risk & Conclusions Ryan Schultz Deputy L3 Manager Target Station 11/17/2015.
NORM.
J.P. Bolívar 1) and R. García-Tenorio 2)
E n v i r o n m e n t a l s o l u t i o n s f o r t h e e n e r g y i n d u s t r y Assessment, Treatment and Management of NORM in the Norwegian.
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
Water Sector Trust Fund
Hanmer Springs Water Supply
Ensure safety devices are working prior to starting work
Update on TCEQ’s Role in Oil & Gas Waste Management
Radiation Protection Handbook
Disaster Site Worker Safety
Class Tasks Q1: Water flows into a process unit through a 5-cm ID pipe at a rate of 4.00 m3/h. Calculate Ėk for this stream in joules/second. Q2: Water.
Recorder Post Training
Presentation transcript:

21 –23 Feb 2005NORM Workshop 2005 PDO NORM Management System Brett Young

21 –23 Feb 2005NORM Workshop 2005 Specification SP 1170 Version.3.0 –Defines responsibilities –Est. Dose limits –Inc. NORM Radiological Surveys into the PTW –Training –Transport and Storage Locations –Emergency Procedures –Incorporates NORM Management Guidelines

21 –23 Feb 2005NORM Workshop 2005 SP 1170 PDO Policy –Plant that has conveyed or stored production fluids (water/oil) or gas are potentially NORM contaminated. Dose Limits –1 mSv/year for PDO workers & contractors –NORM Guideline CSM.001 provides guidance on action limits Inhalation / Ingestions Limits –5 cps above background - PPE

21 –23 Feb 2005NORM Workshop 2005 NORM Management Guidelines Based on Syrian Guidelines –“How to”….. guidelines –Inc. NRS in PTW for consistency of approach –Added flow charts for specific activities –Modified to include PDO’s meters

21 –23 Feb 2005NORM Workshop 2005 HEMP - Permit To Work Production oil/gas/water - conveyed/stored –Trips PTW which requires a NORM Radiological Survey (NRS) –Measurements conducted by RPT –Recorded and attached to PTW –NRS stipulates controls e.g. PPE, Supervised/Controlled Areas.

21 –23 Feb 2005NORM Workshop 2005 Example - Zauliyah Measurements for Tank T7402 –Ground 5 μSv/hour ( cps) exterior wall –At 50 cm above ground = 2.0 μSv/hr exterior wall –At 1.0 m above ground = 1.5 μSv/hr (125 cps) exterior wall –At 1.5 m above ground = 20 cps exterior wall Inside tank in centre approx μ Sv/hr Workers 4 hrs per day inside cleaning = 80 μ Sv/day 80 uSv/day x 14 (days) = 1120 μ Sv/2 weeks inside tank > 1 mSv/2 weeks

21 –23 Feb 2005NORM Workshop 2005 NORM Radiological Survey √ 24372

21 –23 Feb 2005NORM Workshop 2005 Example of NORM Survey ReportCertificate No: 24372

21 –23 Feb 2005NORM Workshop 2005 Monitoring of Personnel Action Limit 1 μSv/hour Record on NORM Radiological Survey Attached to PTW RPT estimates workers daily dose > 8 μSv/day record into a database Risk assessment - Tank cleaners and sludge farm operators required to wear TLD Badge

21 –23 Feb 2005NORM Workshop 2005 Bahja NORM Storage facility Rest Room & Toilet Scrap metal 50m x 25m Drum storage 50m x 25m 400 m Entrance gate * Concrete pad 100 m x 50 m Tubulars 50m x 25m 2 Pits Sludge Storage 100m*10m*1m depth

21 –23 Feb 2005NORM Workshop 2005 NORM Survey Proposal Reservoir to Min Al Fahal (MAF) Oil/water/gas  wells  manifold/gathering station  Main pumping station (MPS)  MAF tanks Survey Proposal Survey backwards from MPS (dehydration tanks)  Gathering Stations (separators)  % well heads Fields declared –Green (NORM Free) –Yellow (NORM Suspected) –Red (Known NORM) Work back as to which geology, depth, water chemistry, E.O.R. programs are likely to produce NORM

21 –23 Feb 2005NORM Workshop 2005 Further discussion 1.Does PDO need dedicated Interior based RPS? 2.How do other organisations consistently identify contaminated plant/areas? Do you use a PTW system or other? 3.Are surveys a useful tool? Do you utilise a similar method or other than proposed?