Florida Product Approval System 2008 Rule 9B-72 Changes Florida Building Commission Florida Department of Community Affairs 2555 Shumard Oak Blvd | Tallahassee,

Slides:



Advertisements
Similar presentations
RP Designs Semi-Custom e-Commerce Package. Overview RP Designs semi- custom e-commerce package is a complete website solution. Visitors can browse a catalog.
Advertisements

Florida Product Approval System Validator Training December 11, 2012 Florida Product Approval System Validator Training December 11, 2012 Florida Building.
How to Submit a Matching Gifts Application.
1 Introducing: the updated BCIS Product Approval Website the revised Product Approval Rule 9B-72 & S.B. 442 State of Florida Department of Community Affairs.
The Application for Renewal Accreditation: Electronic Submissions.
Center Accreditation Online System
Purchasing Goods and Services. Overview In this session you will learn how to utilize the eProcurement Module to create requisitions for purchasing goods.
Florida Product Approval System Florida Building Commission Florida Department of Community Affairs 2555 Shumard Oak Blvd | Tallahassee, FL
LAWS & RULES MANUFACTURED (MODULAR) BUILDINGS PROGRAM.
P roduct Approval and the F lorida Building Code Building Codes and Standards Mo Madani, CBO, Technical Unit Manager Suzanne Davis, Product Approval Joe.
For: Current Certified Third Party Agencies Developed By: Florida Department of Community affairs Date: January 14,
WORKSHOP DCA MODULAR BUILDING PROGRAM
Engineering Document Repository & Electronic Signature (E-Sign) Tutorial 1 DCG- Revision C 7/25/2014.
1 Exemption AdministrationTraining Related to Accepting Certificates Prepared by the Streamlined Sales Tax Governing Board Audit Committee Prepared January.
Hallmark Certification. Agenda Ten Year Certification  Term of Certification Background 1.4 year term of certification 2. 8 year term of certification.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
C-TPAT Security Link Portal Overview. Login Home Screen Partner Documents Discussion My Account Logout.
Welcome to the Electronic Permit Submittal and Processing System (EPSAP) Professional Engineer Submittal Instructions.
Florida Product Approval System Validator Training February 1, 2010 Florida Building Commission Florida Department of Community Affairs 2555 Shumard Oak.
DIRECT CERTIFICATION Patricia Winders Director’s Conference July 29, 2015.
Step by Step Instruction: How to Conduct Direct Certification using File Upload: SAIS IDs Released January 2014 “How to Conduct Direct Certification using.
In-State Tobacco Products Wholesale Dealer’s Report.
Campus Solutions Self Service: Students. The Student Center Enrollment Weekly Schedule Account Inquiry Holds Meningitis Acknowledgement Form Addresses.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
ONLINE FILING WORKSHOP Presented By: The Indiana Lobby Registration Commission 1.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
International Fire Door Inspector Association Presents New Annual Fire Door Inspections NFPA 80 – 2007, 2010, 2013 Standard for Fire Doors and Other Opening.
Nipissing’s ROMEO e-System Internal Research Funding (IRF) Internal Research Grant Application Form (IRG)
Fire Safe Cigarette Online Registration Instructions.
Warehouse Report. Log into EDS using your Address/User Id and Password. If you have forgotten your password, click on the Forgot Password? link.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
Florida Department of Community Affairs - Codes and Standards Overview: Code Modification Process.
What Documentation Needs to be Submitted With an Approval Application?
DOMESTIC AND FOREIGN SUBCONTRACTS/SUBAWARDS CITI Training.
DHHS COE Meeting Agenda May 16, 2012 Welcome Introductions Contract Compliance Reporting Open Window Updates Questions and Answers.
Taxpaid Cigarette Wholesale Dealer’s Report (CWD).
Step by Step Instruction: How to Conduct Direct Certification using the State Match Method Released January 2014 “How to Conduct Direct Certification using.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
Public Purchase Vendor Registration & Responding to a Bid Copyright © The Public Group, LLC - This document is confidential and intended only for the use.
Vendor Bid System (VBS) Seminar. Agenda Vendor Bid System Overview Step-by-Step Advertisement Posting Editing Active Advertisements Recommended Practices.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Start the slide show by clicking on the "Slide Show" option in the below menu or – hit the F5 Key.
SDA Formulas Online Webinar Please use the mute button or press #6 on your phones to mute the teleconference line If you have questions or technical problems.
SDA Formulas Online webinar Tomika Moore Senior Chemist, Nonbeverage Products Laboratory September 13, 2012.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
U.S. General Services Administration Federal Acquisition Service U.S. General Services Administration GSA Federal Acquisition Service Industry Webinar.
Virginia Administrative Training Module 1: Processing, Online, Scoring and Reporting Training Presentation Training Presentation Working Within PearsonAccess.
American Diploma Project Administrative Site Training.
American Diploma Project Administrative Site Training.
American Diploma Project Administrative Site Training New Jersey.
Steve Griffith February 28th, 2017
SCC P2P – Collaboration Made Easy Contract Management training
Florida Codes and Standards
Transportation of Class 7 materials: Compliance & Regulatory issues
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Welcome to the Electronic Permit Submittal and Processing System (EPSAP) Professional Engineer Submittal Instructions.
Annual Inspection Certification Program
Acceptance Process for Manufactured Products by Certification:
Florida Product Approval System March 2010
WARNING Asking questions or providing feedback regarding the Invitation to Negotiate (ITN) will preclude the individual and their organization from participation.
Handgun Licensing for Instructors: Renewal Certification 2017
State Product Approval – The Next Step
To the ETS – Encumbrance Online Training Course
Fasset Briefing Session
To the ETS – Encumbrance Online Training Course
ONLINE FILING Updates and Review
Ministerial and Clerical Errors
Exemption AdministrationTraining Related to Accepting Certificates
Standards and Certification Training
Presentation transcript:

Florida Product Approval System 2008 Rule 9B-72 Changes Florida Building Commission Florida Department of Community Affairs 2555 Shumard Oak Blvd | Tallahassee, FL | (850)

Florida Product Approval System Department of Community Affairs Product Approval Team

Recent Product Approval Changes Ted Berman and Associates, LLC THEODORE BERMAN, P.E. Product Approval System Administrator SIMON SEGAL, P.E. Assistant Engineer, Product Application Review JESSICA HUPPERT Administrative Officer VERDA LA RUE Product Approval, Process Support Specialist

Recent Product Approval Changes Florida Building Code 2007 The 2007 Florida Building Code is now available online. The Effective Date for 2007 Code is October 1, 2008

Recent Product Approval Changes Florida Building Code 2007 There are three ways to have your product comply with the new code Self-Affirmation of existing application Revision of existing application New application

Recent Product Approval Changes Self–Affirmation FBC 2007  Application Self Affirmation  Upon review of the new Code, if the standards and restrictions in the new Code applicable to your product have not changed, you can “self-affirm” that your product complies with applicable standards of the new Code.  Please contact the Product Approval Administrator Ted Berman And Associates before initiating a self- affirmation  Self Affirmations cost $50.

Recent Product Approval Changes Revision FBC 2007 Application Revision: If the standards or restrictions pertaining to your product in the 2007 Code have changed, then a product revision application must be submitted. New evidence such as a test report or an evaluation report demonstrating compliance must also be submitted. Revisions cost $300.

Recent Product Approval Changes Revision FBC 2007 IMPORTANT IF THERE ARE MULTIPLE PRODUCTS WITHIN THE SAME APPLICATION (FL#), THEN EVIDENCE FOR ALL THE PRODUCTS MUST BE SUBMITTED. THE ENTIRE PRODUCT LINE MUST ALSO COMPLY WITH THE NEW STATE PRODUCT APPROVAL RULE AND ALL THE REQUIREMENTS THEREIN

Recent Product Approval Changes New Application Process Changes made to the new application process include: There is now ONE COMPLETION DEADLINE There is now ONE COMPLETION DEADLINE No more recommendation for Conditional Approval or Deferral by the Administrator. No more recommendation for Conditional Approval or Deferral by the Administrator. Applicants work at their own pace to complete applications by the posted deadline date. Applicants work at their own pace to complete applications by the posted deadline date. Early submittals will have more correction time if needed. Early submittals will have more correction time if needed. Once validated, Ted Berman and Associates, LLC review the application and the applicant notifying them of any discrepancies. Once validated, Ted Berman and Associates, LLC review the application and the applicant notifying them of any discrepancies. Only those applications that are complete and reviewed by the Deadline are recommended to the Product Oversight Committee (POC) and be listed on the meeting agenda Only those applications that are complete and reviewed by the Deadline are recommended to the Product Oversight Committee (POC) and be listed on the meeting agenda

Recent Product Approval Changes New Application Process Before submittal, verify the following: Verify that the product is Florida Building Code Compliant Verify that the product is Florida Building Code Compliant Manufacturer’s name on the BCIS matches the name on the Certification Agency Certificate. Manufacturer’s name on the BCIS matches the name on the Certification Agency Certificate. Model size and performance is an exact match with uploaded Certification Agency Certificate. Model size and performance is an exact match with uploaded Certification Agency Certificate. Installation Documents are attached. Installation Documents are attached. On Limitations of use for each model define: use within HVHZ or outside HVHZ; impact, design rating, missile level and any other pertinent information. On Limitations of use for each model define: use within HVHZ or outside HVHZ; impact, design rating, missile level and any other pertinent information. Testing standards and year of standard as certified by Certification Agency. If testing standards are not adopted in the version of the Florida Building Code, an equivalency of standards will be required. Testing standards and year of standard as certified by Certification Agency. If testing standards are not adopted in the version of the Florida Building Code, an equivalency of standards will be required.

Recent Product Approval Changes Product Approval Methods Four Methods for State Approval Certification Method Certification Method Test Report Test Report Evaluation Report from an Evaluation Entity Evaluation Report from an Evaluation Entity Evaluation Report from a Florida licensed Architect or a Florida Professional Engineer Evaluation Report from a Florida licensed Architect or a Florida Professional Engineer

Recent Product Approval Changes RULE 9B – 72 changes 9B – (31) (f)For shutters: Shutters subcategory has been expanded to add fabric storm panel. Shutters subcategory has been expanded to add fabric storm panel. 9B – (1)(g)Demonstration of Compliance: Products required to demonstrate compliance using referenced testing standard(s) and also requiring rational analysis that falls outside the scope of the agency certificate designating product certification, must demonstrate compliance using an evaluation report from an approved evaluation entity.

Validations 9B Product Validation Two Types of Validation Administrative Validation Administrative Validation Technical Validation Technical Validation NOTE: The validation process has been added to Certification Mark or Listing method on the Florida State Product Approval System

Administrative Validation Applicable to: A certification mark or listing from an approved certification agency A certification mark or listing from an approved certification agency An evaluation report from a Florida Registered Architect or Licensed Engineer independent from the manufacturer An evaluation report from a Florida Registered Architect or Licensed Engineer independent from the manufacturer An evaluation report from an approved evaluation entity (i.e. ICC) An evaluation report from an approved evaluation entity (i.e. ICC)

Recent Product Approval Changes Administrative Validation Criteria Criteria consists of: Criteria consists of: Verification of certification, certification agency status, product description, testing standards per Florida Building Code and compliance documentation with the current code. Verification of certification, certification agency status, product description, testing standards per Florida Building Code and compliance documentation with the current code. Verification of installation instructions, anchorage requirements and product performance under certification. Verification of installation instructions, anchorage requirements and product performance under certification. Verification of any limits of use included as certified and use of rational analysis within the scope of certification Verification of any limits of use included as certified and use of rational analysis within the scope of certification

Administrative Validation Checklist

Administrative Validation Overview

Technical Validation Applicable to: A test report from an approved testing laboratory A test report from an approved testing laboratory An evaluation repot from an approved evaluation entity that is not an independent third party from the manufacturer An evaluation repot from an approved evaluation entity that is not an independent third party from the manufacturer

Recent Product Approval Changes Technical Validation Criteria In addition to criteria for Administrative Validation, Technical validation includes: In addition to criteria for Administrative Validation, Technical validation includes: Determination that the evaluator has complied with acceptable standards of engineering principles. Determination that the evaluator has complied with acceptable standards of engineering principles. Engineering verification that the evaluation complies with the Code. Engineering verification that the evaluation complies with the Code. Copy of the application complying with all aspects of rule 61G15-36 F.A.C. must be filed with the Commission. Copy of the application complying with all aspects of rule 61G15-36 F.A.C. must be filed with the Commission.

Technical Validation Checklist

Technical Validation Overview

Installation Instructions Installation instructions also require validation: If prepared by company engineers then technical validation is required If prepared by company engineers then technical validation is required If prepared by independent engineers then administration validation is required If prepared by independent engineers then administration validation is required

Recent Product Approval Changes Installation Instructions Installation instructions criteria: Determination that the evaluator has complied with acceptable standards of engineering principles. Determination that the evaluator has complied with acceptable standards of engineering principles. Engineering verification that the evaluation complies with the Code. Engineering verification that the evaluation complies with the Code. Copy of the application complying with all aspects of rule 61G F.A.C. must be filed with the Commission. Copy of the application complying with all aspects of rule 61G F.A.C. must be filed with the Commission. Exception: Exception: Technical Validation is not required if the installation instructions including attachments are verified by the product certification agency or the product evaluation agency. Technical Validation is not required if the installation instructions including attachments are verified by the product certification agency or the product evaluation agency.

Windows Installation instructions requirements for windows must contain the following: Type, and grade of anchor, and/or manufacturer’s anchor specifications, including minimal nominal size, minimum penetration into substrate and minimum edge distances. Type, and grade of anchor, and/or manufacturer’s anchor specifications, including minimal nominal size, minimum penetration into substrate and minimum edge distances. Type, physical dimensions, material and grade of any accessory item or strap, if applicable. Type, physical dimensions, material and grade of any accessory item or strap, if applicable. Spacing of anchors, shims, accessory items and straps. Spacing of anchors, shims, accessory items and straps. Illustrated diagrams of the attachment of the product structure. Illustrated diagrams of the attachment of the product structure.

RULE 9B – 72 Optional State Approval with updates

Validation Entities All approved Validation Entities must retain documentation of the product application All approved Validation Entities must retain documentation of the product application Testing Labs are not allowed to conduct validations Testing Labs are not allowed to conduct validations

Quality Assurance Expiration For all the methods of compliance, including the certification Mark or Listing Method, a new field is added to collect the Expiration Date of the Quality Assurance Entity Contract on Page 3 of the application For all the methods of compliance, including the certification Mark or Listing Method, a new field is added to collect the Expiration Date of the Quality Assurance Entity Contract on Page 3 of the application An is sent to the Manufacturer with a copy to DCA when the Expiration Date has elapsed. An is sent to the Manufacturer with a copy to DCA when the Expiration Date has elapsed. Search criteria on the Product Search webpage allows searching for expired Quality Assurance Entity Contracts. Search criteria on the Product Search webpage allows searching for expired Quality Assurance Entity Contracts.

BCIS Homepage New order of compliance method

BCIS Homepage New validation for certification method

BCIS Homepage New QA contract expiration date

BCIS Homepage New evaluation by third party/rational analysis criteria

Florida Building Code 2007 Important Code Changes  Products to be Labeled:  Exterior Windows and Glass Doors  Garage Doors,  Skylights

Recent Product Approval Changes Skylights( ), Exterior Windows And Glass Doors(1714.5)  Skylights, Exterior Windows and Glass Doors  Required Labels:  Permanent Label  Temporary Label

Recent Product Approval Changes Skylights( ), Exterior Windows And Glass Doors(1714.5)  Permanent Label:  Permanent label is a label that cannot be removed without noticeable damage:  It is limited to one design pressure rating per reference standard per label.  Permanent label shall identify:  the manufacturer  performance characteristics  Product’s model/series number  Approved product certification agency, testing lab, evaluation entity or Miami-Dade Product Approval to indicate compliance with the relevant standards

Recent Product Approval Changes Skylights( ), Exterior Windows And Glass Doors(1714.5)  Temporary Supplemental Label:  Temporary Label has to be printed and supplied by the manufacturer and shall identify:  the manufacturer  products model/series number,  positive and negative design pressure rating,  products maximum size,  glazing thickness,  indicate impact rated if applicable,  Florida Product Approval number or Miami-Dade Product Approval number if applicable, and applicable test standard.  The supplemental label is limited to one design pressure rating per reference standard per label.

Recent Product Approval Changes Skylights( ), Exterior Windows And Glass Doors(1714.5) NOTE: PERMANENT LABEL SHALL BECOME THE DEFAULT IF THE TEMPORARY LABEL IS MISSING OR NO LONGER LEGIBLE

Recent Product Approval Changes Garage Door Labeling Garage Door Permanent Label shall identify  the manufacturer,  garage door model/series number,  the positive and negative design pressure rating,  indicate impact rated if applicable,  the installation instruction drawing reference number,  Fl. Product Approval number or Miami-Dade Product Approval if applicable,  and the applicable test standards.  Label may also contain in a checklist format required garage door components for an approved garage door assembly.

Impact- Resistant Coverings Location of Label: Accordion: Bottom of locking bar or center mate facing exterior Permanent Label is required Following information to be included on the label: Product approval name and address Methods of approval e.g. FBC, Miami-Dade (M-D), TDI Evaluation and ICC-ES Applicable standards For FBA and M-D, the FL # or the NOA #

Impact- Resistant Coverings Location of Label: Rollup: On the bottom of the hood facing the exterior or on the bottom slat facing the exterior or outside Bahama Awning or Colonial Hinged: On the bottom, placed on the back of the shutter. Panels: For metal and plastic panels the label may be embossed or printed spaced not more than every three lineal feet on each panel. The label shall be applied by the holder of the product approval and shall face the exterior. Framed products: The label shall be on the side or bottom facing the exterior. Labels on all other products shall face the exterior.

Impact- Resistant Coverings Installation: In accordance with manufacturer’s instructions, which shall be provided and be available to inspectors. Opening protection components including fasteners evaluated by an approved authority may be interchangeable if they provide equal or greater structural performance and durability

F.A.Q.’s I have a new product that meets 2004 and 2007 codes, which code do I apply for? Apply for 2004 and self-affirm for 2007 The person with authorized signature on the application no longer works for us? What do I do? If you are going to self-affirm, you can first submit an editorial revision. If you are going to revise anyway, you can change the authorized signature with the revision

F.A.Q.’s  I lost my username and password? Contact Department of Community Affairs with an from either the registered with the application or from the President or Vice-President of the Company The page loads with an error? What do I do? Norton / Symantec Firewalls do not like your Product to be approved. Turn the Firewalls off.

F.A.Q.’s I am submitted an entity application but I need to change something, can I do it? If the status of your entity application is “pending accreditation”, you can still make changes to your application.

Mo Madani Department of Community Affairs Codes and Standards (p) | (f)