Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Putting Houses on the Path to Lower Energy Consumption. Awareness and Long term planning helps to maximize energy opportunities.
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: August 19 th, 2013 – August 23 rd, 2013.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Hospital of the Future Construction Update as of Dec. 3, 2010.
Bond Program Planning Imperatives Study Session October 12, 2004.
05/07/12 – 5/13/12 Phase 1 Demolition at West Entry Complete; Drilled Piers and footers Started.
Architectural Drawing
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Grimsby Secondary School
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Lighting Techniques and Technology Practical Applications Britnei Godusky LC, LEED AP BD+C June 4, 2014AOBA / Current Trends in Sustainability.
Elevations.
Parallel Lines & Transversals & Angles
BCT 102 Residential Printreading
Site Plans.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.

Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
NOTE: Availability NOT guaranteed. Please call ahead to verify building availability. Purchase and Lease Options Available. Visit our Online Showroom at.
Facilities Modernization Program Funded by Measure B Project Report April 19, 2010.
HOME MODEL. P e r s p e c t i v e HOME MODEL 4.00m X 5.50m Floor Area = 22 sqm. Turn-over unit 4.00m 5.50m 1.4m 4.00m.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
Winchester Medical Center Campus Expansion June 21, 2011.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
DIL-009 Phasing Plan TASKS START END CONSTRUCTION (7 weeks) 02/07/11 04/01/11 PHASE 1: BACKROOM AND GROCERY (2 WKS) 2/7/11PM2/18/11AM.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
Fort Benning’s SUSTAINABLE Showcase Ribbon Cutting December 7th, 2007 Fort Benning established in 2006, for testing and evaluation purposes, a SIS (Sustainable.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Prove Lines are Parallel
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
Administration Offices Proposed by: Wyatt Marvin and Mitch Sander.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
Bond Oversight Committee
Huntington Convention Center of Cleveland &
Construction Documents
PAT MEETING HISD JACK YATES HIGH SCHOOL February 16, 2017 PAT MEETING.
ADDITION AND MODERNIZATION
About Us- Phone- (IND) , (UAE)
Carleton College Summer 2018 Science and Campus Construction Plan
INDUSTRIAL / COMMERCIAL Facility For Lease
Minuteman Vocational Technical Regional High School Progress
2007 Bond Issue Capital Improvement Program
Spin and Spell Directions:
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
New White Lake Township Library
Wall and Ceiling Construction
DBIA Manual of Practice
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Mount Vernon Community School
Lafayette Airport Commission New Terminal Program Update
Angles and Parallel Lines
Presentation transcript:

Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed from Structure

New Gas and Water Service Underground Started

Health Inspector Page Turn of CD Documents Exterior Continue Demo of Atrium Begin Removal of Stairwells Finish Gas and Water Line Utility Services Interior Complete all temporary walls for Phase 1 Saw Cut of Dining Level Slab for Removal Complete temporary office space in 1927 Wing Remove remaining ceilings and MEP Overhead PROJECT MEETINGS HELD NEXT WEEK LOOK AHEAD BIM Coordination Meeting