Proposed Statewide Baseline Groundwater Sampling and Monitoring Rules Staff Presentation Cause 1-R, Docket No. 1211-RM-04 November 14, 2012.

Slides:



Advertisements
Similar presentations
NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
Advertisements

COLORADO OIL AND GAS CONSERVATION COMMISSION STATE REGULATION OF OIL & GAS OVERVIEW LONGMONT CITY COUNCIL COLORADO OIL AND GAS CONSERVATION COMMISSION.
Water Quality and Hydraulic Fracturing: GIS Analysis Kyra Reumann-Moore REU in Environmental Sustainability Mentor: Joe Ryan Graduate Student: Jessica.
PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS Zach C. Miller Davis Graham & Stubbs LLP Denver, Colorado December 14,
Moving Beyond Misinformation: Education and Engagement.
7:00 pmWelcome and introductions 7:05pmHLWD planning overview Plan update process 7:25 pmStakeholder involvement Watershed problems 7:40 pmPublic comment.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
1 February 10, 2014 Presented By: Michael E. Parker, P.E. Parker Environmental and Consulting, LLC Hydraulic Fracturing Best Management Practices Comments.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
GARFIELD COUNTY OIL & GAS SUMMARY. OPERATING GAS WELLS IN GARFIELD COUNTY PRODUCING WELLS PRODUCING WELLS
Performance Audit (May 2014) Office of Conservation, DNR Oil and Gas Program Concluded (among others): o Does not perform appropriate routine inspections.
Water Issues Related to Marcellus Gas Drilling Activity Water Issues Related to Marcellus Gas Drilling Activity Bryan Swistock Water Resources Extension.
Industry Growth and Change 2014 Martz Summer Conference University of Colorado Law School Getches-Wilkinson Center for Natural Resources, Energy, and the.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Suzanne Macey.  DEC looks at known occurrences with 1 mile  FWS looks at known occurrences plus the potential for suitable habitat  Contact DEC and/or.
INPATIENT PROPOSAL INPATIENT PROPOSAL 4 MONTH CERTIFICATION SCHEDULE.
Davis Graham & Stubbs LLP DGSLAW.COM Dave Neslin Davis Graham & Stubbs LLP Former Director of the Colorado Oil & Gas Conservation Commission Environmental.
PAGE # 1 Presented by Stacey Hancock Advised by Scott Urquhart Colorado State University Developing Learning Materials for Surface Water Monitoring.
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
Master Development Plans (MDPs) Oil and Gas Projects.
Ecosystems Climate and Land-Use Change Water Natural Hazards Core Science Systems Energy and Minerals, and Environmental Health U.S. Geological Survey.
NWIS Data Pulls for National- and Regional-Scale Applications Kathy Smith (Crustal Geophysics and Geochemistry) and Nancy Bauch (Colorado Water Science.
BBC Research & Consulting 3773 Cherry Creek North Drive, # 850 Denver, Colorado December Committee Meeting Progress.
Ministry of the Environment Certificates of Approval for an Anaerobic Digestion Facility Post Construction DIGGING INTO BIOGAS DETAILS WORKSHOP April 5,
Colorado’s Groundwater Protection Program Monitoring and Protecting Groundwater During Oil and Gas Development Natural Resources Law Center Intermountain.
Adem.alabama.gov Coal Combustion Waste Regulation Stephen A. Cobb Governmental Hazardous Waste Branch Land Division.
Hydrostatic Testing Draft General Permit Draft Permit Stakeholder Outreach Meeting April 23, 2015 Moderated by: Lillian Gonzalez, Unit Manager, Permits.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
DEVELOPMENT OF THE HYDRAULIC FRACTURING REGULATIONS FOR NEVADA PRESENTATION TO MINING OVERSIGHT AND ACCOUNTABILITY COMMISSION ( MOAC) September 24, 2014.
Monitoring and Protecting Groundwater During Oil & Gas Development Overview of Colorado Aquifer Systems November 26, 2012 Christopher J. Sanchez, P.G.
How do 210 Water Reuse Authorizations relate to O&G Development? Jaya Zyman-Ponebshek, P.E. Assistant Director Water Quality Division.
The Role of Groundwater Sampling/Monitoring COGCC Proposed Rule 609 University of Colorado Law School Nov 26, 2012.
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
Complaints Information Santina Thibedeau March 5, 2009.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Background Weld County Wells West Divide Creek Seeps Well Testing Regulations Gasland Reaction A reaction to the documentary “Gasland” by Josh Fox from.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
AOGCC Proposed Regulations regarding Hydraulic Fracturing April 4, 2013 Kara Moriarty, Executive Director.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Hydro One Community Liaison Committee Minister’s Conditions Meeting #2 August 19, 2014 Solina Hall.
 Introduction… ◦ Former Director of Western Colorado Congress ◦ Graduate of University of Colorado Law School ◦ Attorney specializing in representation.
Moving Beyond Misinformation: Education and Engagement
Thom KerrNovember 17, 2015 Colorado’s Continuous Adjustment to Unconventional Resource Development.
Outline Introduction Current Approaches for Regulating Activity Overview of Recent Study Sessions and Rulemaking Current Activity in Adams County Recent.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
1 AGRICULTURAL POLLUTION REDUCTION ACTIVITY Financed by USAID APRA ROMANIA PROJECT Project implemented by: Assistance project for MAFWE International Resources.
Principal Investigator ESTCP Selection Meeting
MS4 and Trading Considerations
Department of Environmental Quality
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Principal Investigator ESTCP Selection Meeting
Sustainable Groundwater Management Act
Watershed Management Plan Citizens Advisory Committee April 18, 2011
Monitoring and Protecting Groundwater During Oil and Gas Development:
September 8, 2016 Request Approval of the Determinations to be Submitted to Rules Review Commission for Subchapter 15A NCAC 02E (Periodic Review of Existing.
Dots 5 × TABLES MULTIPLICATION.
Dots 5 × TABLES MULTIPLICATION.
Dots 2 × TABLES MULTIPLICATION.
Dr. Jim Thomas Desert Research Institute
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Dots 3 × TABLES MULTIPLICATION.
Principal Investigator ESTCP Selection Meeting
Greater Kaweah GSA Board Meeting
CP-TXT Water Supply Facilities Work Plan Amendment
Hydraulic Fracturing Best Management Practices Comments and Considerations Presented By: Michael E. Parker, P.E. Parker Environmental and Consulting, LLC.
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Proposed Statewide Baseline Groundwater Sampling and Monitoring Rules Staff Presentation Cause 1-R, Docket No RM-04 November 14, 2012

Presentation Outline Part 1: Introduction Existing COGCC Sampling Rules and Orders COGA Voluntary Sampling Program Part 2: Details of Proposed Rule 609 Benefits of the Proposed Groundwater Rule

Introduction Oil and Gas operations occur in multiple areas throughout the State where citizens obtain their water supply from groundwater sourced by water wells or springs. Groundwater users have expressed concerns to COGCC, Oil and Gas Operators, and local governments. COGCC receives on average, two requests to sample a water well every week. Several local governments have proposed or adopted rules/policies regarding groundwater sampling near oil and gas wells and facilities.

Existing COGCC Sampling Rules and Orders DateRule or Order Description Apr & Sampling near CBM wells in the San Juan Basin Dec 2005Rule 318A.eSampling within GWA for infill wells Apr 2009Rule 608Sampling near all CBM wells Statewide April 2009Rule 305.dProvides for Conditions of Approval which can require groundwater sampling on Form 2A. Sept 2011Rule 318AExpands required sampling to all of GWA Note: COGCC can require samples at any time pursuant to Rule 207.

Water Wells and Oil/Gas Fields of Colorado

Example – Proximity of Water Wells to Oil/Gas Wells Red Dots: Oil and Gas Wells Blue Dots: Water Wells 1 mile

Rule 609 – Supplement to Existing Rules The proposed rule will provide additional groundwater data in areas of oil and gas development, as a supplement to existing COGCC groundwater protection rules, such as: Surface Casing –Rule 317.d., e., f., g., 317A.a., b. Well Cementing – Rule 317.h., i. Bradenhead Testing – Rule 317.j, 341 MIT Testing – Rule 326 Pit Lining – Rule 904 Form 2A Process for Siting and Constructing Surface Facilities – Rule 303.d.

Rule 609 –Supplement to Existing Rules The proposed rule IS NOT a comprehensive groundwater study and/or monitoring program designed to detect all potential impacts for all users at every water well or spring. Complaint driven investigations will continue by COGCC, as they have in the past, to specific situations. COGCC will also continue to require groundwater investigations at new reported and known spills.

Existing COGCC Sampling Rules and Orders DateRule or Order Description Apr & Sampling near CBM wells in the San Juan Basin Dec 2005Rule 318A.eSampling within GWA for infill wells Apr 2009Rule 608Sampling near all CBM wells Statewide April 2009Rule 305.dProvides for Conditions of Approval which can require groundwater sampling on Form 2A. Sept 2011Rule 318AExpands required sampling to all of GWA Note: COGCC can require samples at any time pursuant to Rule 207.

Existing Rule 608 Summary Applies to all CBM areas within the State. Analyze for complete analytical list in 608.b.(2). Collect initial baseline, 1 year, 3 year, and 6 year samples. Submit data to water well owner and COGCC. COGCC posts to public website.

COGA Voluntary Baseline Groundwater Sampling Program Summary Effective January Sample 2 groundwater water wells, springs, or seeps within 1/2 mile radius of the surface location. Analyze for complete analytical list on Table 1 in the COGA Sampling and Analysis Plan. Collect initial baseline and a 1 year sample. Submit data to COGCC for posting on Public Website

This and other documents discussed during the workshop can be found on the BMP Project website workshops/COGCCgroundwater/index.php