DRAFT 06.03.09 Madison Valley Stormwater Project Phase 2 Seattle Design Commission June 4, 2009 Seattle City Hall Boards and Commissions Room, L2-80.

Slides:



Advertisements
Similar presentations
Kingdom Hall Construction Burundi. Facts on Burundi No. of Congregations:51 Kingdom Halls Needed:35 Kingdom Halls completed since start of program:29.
Advertisements

Redwoods National Park. Elk Camp Site. Looking from north toward south.
City Managers Neighborhood Impact Initiative Impact Initiative Acre & Pawtucketville.
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Route 27 / Route 244 Bridge Design Aesthetic Considerations VDOT Project Number: V01, PE 101 June 28,
Presented by: Ronald O. Nichols LADWP General Manager
45 th Ave S Shared Street Design Commission September 17 th, 2009 Megan Hoyt SDOT Traffic Operations.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
SUNY ONEONTA – NEW RESIDENCE DORMS COMMUNITY MEETING, Site Existing Conditions Site Plan Circulation Utilities Landscape.
CHARLESTON GAILLARD CENTER ARTS PRECINCT ARTS PRECINCT … designed to bring the arts into the public realm by creating a civic destination for.
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
Stormwater Master Plan University of North Carolina Peter A. Reinhardt Sharon Myers, L.G. Department of Environment, Health and Safety.
Chapter 8 Plot Plans.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING March 4-3:00PM | ROOM 1E-113.
ART IN THE LANDSCAPE Dr. Lou Mills LARC 1302 Spring 2014.
B IG I DEAS part 2 May 19, 2014 City of Duluth Unified Development Code.
PROPOSED EAGLE PROJECT BY TYLER BOOTH Installation of Raised Garden Beds At Timberlane Regional High School 1.
PROPOSED RESIDENTIAL SCHOOL FOR
Capital Development Process Office of the Architect August 10, 2009 Project Manager / Construction Administration Manager Training.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
Stormwater Treatment and Flow Control Dan Cloak Presentation to the Citizens Advisory Committee November 13, 2006 Options for implementing new Phase II.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Our company will do the design and installation We specialize in lawn care, sprinklers, paving stones, flowers, trees and retaining walls.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
American Architecture Jorge López My Noteworthy Buildings.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Willamette Christian Center Site Analysis for Sustainable Development Sustainable Building Advisor Class Lane Community College Proposed by.
Plans to achieve our goals were approved unanimously by the Temple Board on June 11, 2008, and by the congregational meeting on June 22nd without a dissenting.
1 Item W9a (Ruffalo) Coastal Commission March 7-9, 2012 Hearing.
City of Appleton Stormwater Management Update Presented to the June 11, 2013 Utilities Committee.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
1 Town of Taghkanic Highway Department Highway Facility Addition and Salt/Sand Storage.
May 2010 Photo provided by the Trust for the National Mall U.S. Commission of Fine Arts Concept Review.
Potomac Hill Campus Master Plan Preliminary Planning Principles “Observing the Past, Planning the Future” Campus Master Plan Potomac Hill.
Baltimore City Department of Public Works. Design Notice to Proceed: October % Design Completed: July % Design Completion: November 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Basis of recommendation (cont.) 3.Insufficient green/open space (pgs. 3-4)  Green/open space within the site inadequate to serve estimated population.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZM The Parker Apartments July 12, 2012.
David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1.
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update October 2, 2008.
Needham Town Hall Feasibility Study Cover & Credits Prepared for: Needham Town Hall Feasibility Study Committee Permanent Public Building Committee John.
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Land Use Review LU DZ Arthouse.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
Campus Stormwater Assessment
Transportation Engineering Business Development Workshop Department M
Riverwalk Park – 8/23/17 Preferred Riverwalk Park Concept Plan
Jefferson County SA Red Rocks Site Approval
Marina Vista Streetscape Project
Delivering Water Reuse Solutions
Willow Meadows Civic Club Meeting September 13, 2011
Baltimore City Department of Public Works
Main Street Improvements
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
Campus Stormwater Assessment
Richmond Greenway Phase I
Condominiums Association
1 Semester Project Design A Multi Story Office Building
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
CONVENTIONAL FACILITIES LCLS Office Space
Minuteman Vocational Technical Regional High School Progress
St. Martin’s Evangelical Lutheran Church - School
Washoe County Board of Adjustment June 6, 2019
What is Site plan and Site Plan Rendering Service Linesgraph.
Presentation transcript:

DRAFT Madison Valley Stormwater Project Phase 2 Seattle Design Commission June 4, 2009 Seattle City Hall Boards and Commissions Room, L2-80

DRAFT Three Stormwater Pipeline Alignment Options Baseline Open-Cut Trenchless

DRAFT Selected Stormwater Pipeline Alignment = Proposed shaft location = Stormwater pipeline

DRAFT Construction Boundaries in Washington Park

DRAFT Existing Conditions in Washington Park Looking toward southwest corner of Washington Park Mixed-use building on E Madison St E Madison St streetscape Batting cage and south slope from lower lawn View down into site from E Madison St

DRAFT Conceptual Landscape Plan

DRAFT Conceptual Landscape Details BALUSTRADE / ORNAMENTAL RAILING Concrete or Cast Stone Balustrade Metal Railing on Low Wall Metal Railing on Curb

DRAFT Conceptual Landscape Details EXISTING STORAGE TANK FACADE Natural Stone Shotcrete Stone Work in Washington Arboretum Stone Veneer Synthetic Stone Stone Façade on Tank Overlook with Ornamental Railing Upper Lawn Rain Garden and Drainage Grate Sunken Lawn Meadow with Wooded Hillside Beyond

DRAFT Preliminary Tree Preservation Plan

DRAFT Project Schedule