© 2010 The McGraw-Hill Companies, Inc. Flexible Budgets and Performance Analysis.

Slides:



Advertisements
Similar presentations
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Advertisements

Flexible Budgets and Performance Analysis
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Operational Budgeting Chapter 22.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
OPERATIONAL BUDGETING
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Flexible Budgets and Performance Analysis. Learning Objective 1 Prepare a flexible budget.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Flexible Budgets and Performance Analysis Chapter 10 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Flexible Budgets and Overhead Analysis.
CHAPTER 15 Cost Analysis for Control. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved Decision Making Strategic, Operational,
Cost Analysis for Control
Flexible budget..
Flexible Budgets and Overhead Analysis Chapter 11.
Flexible Budgets and Overhead Analysis Chapter 11.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
Flexible Budgets and Overhead Analysis 11/30/04 Chapter 11.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Flexible Budget, Overhead Cost Variances and Management Control
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 12 Professor Jeff Yu.
Fundamentals of Accounting II
Financial and Managerial Accounting
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Budgetary Control and Responsibility Accounting
Chapter 21 Flexible Budgets and Standard Costing.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Cost-Volume-Profit Analysis Chapter 19.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Budgeting: The Basis for Planning and Control – Planning Developing objectives for acquisition and use of resources. – Control Steps taken by management.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 20-1 COST-VOLUME-PROFIT ANALYSIS Chapter 20.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Copyright © The McGraw-Hill Companies, Inc 2011 FLEXIBLE BUDGETS AND PERFORMANCE ANALYSIS Chapter 9.
Flexible Budgeting Chapter 07, 08
Flexible Budgets and Overhead Analysis Chapter 7.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/IrwinCopyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and.
1 Chapter 9. Flexible Budgets. Variance Analysis. M11-Chp-10-1-Flex-Bud-Variances Edited May 24, Copyright © 2011, Dr. Howard Godfrey This.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
1 Flexible Budgets and Performance Analysis Chapter 10.
Chapter 9. Static Budgets and Performance Reports Static budgets are prepared for a single, planned level of activity. Performance evaluation is difficult.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Flexible Budgeting and Analysis of Overhead Costs CHAPTER 11 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
Chapter 17 Overhead Cost Management Flexible Budgets.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Flexible.
8-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
9-1 Larry’s Lawn Service provides lawn care in a planned community where all lawns are approximately the same size. At the end of May, Larry prepared his.
11th Edition Chapter 11.
Flexible Budgets, Standard Costs, and Variance Analysis
Flexible Budgets and Performance Analysis
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
Performance Evaluation
Flexible Budgets and Overhead Analysis
Managerial Accounting
Flexible Budgets and Performance Analysis
Operational Budgeting
Flexible Budgets and Overhead Analysis
Paper F2 Management Accounting
Flexible Budgets and Performance Analysis
Flexible Budgets and Overhead Analysis
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs.
Presentation transcript:

© 2010 The McGraw-Hill Companies, Inc. Flexible Budgets and Performance Analysis

McGraw-Hill/Irwin Slide 2 Learning Objective 1 Prepare a flexible budget.

McGraw-Hill/Irwin Slide 3 Larry’s Lawn Service provides lawn care services in a planned community where all lawns are approximately the same size. At the end of May, Larry prepared his June budget based on mowing 500 lawns. Since all of the lawns are similar in size, Larry felt that the number of lawns mowed in a month would be the best way to measure overall activity for his business. Larry’s Budget Deficiencies of the Static Planning Budget

McGraw-Hill/Irwin Slide 4 Deficiencies of the Static Planning Budget Larry’s Planning Budget

McGraw-Hill/Irwin Slide 5 Deficiencies of the Static Planning Budget Larry’s Actual Results

McGraw-Hill/Irwin Slide 6 Deficiencies of the Static Planning Budget Larry’s Actual Results Compared with the Planning Budget

McGraw-Hill/Irwin Slide 7 Deficiencies of the Static Planning Budget Larry’s Actual Results Compared with the Planning Budget F = Favorable variance that occurs when actual costs are less than budgeted costs. U = Unfavorable variance that occurs when actual costs are greater than budgeted costs. F = Favorable variance that occurs when actual revenue is greater than budgeted revenue.

McGraw-Hill/Irwin Slide 8 Deficiencies of the Static Planning Budget Larry’s Actual Results Compared with the Planning Budget Since these variances are favorable, has Larry done a good job controlling costs? Since these variances are unfavorable, has Larry done a poor job controlling costs?

McGraw-Hill/Irwin Slide 9 Characteristics of Flexible Budgets Planning budgets are prepared for a single, planned level of activity. Performance evaluation is difficult when actual activity differs from the planned level of activity. Hmm! Comparing static planning budgets with actual costs is like comparing apples and oranges.

McGraw-Hill/Irwin Slide 10 I don’t think I can answer the questions using a static budget. Actual activity is above planned activity. So, shouldn’t the variable costs be higher if actual activity is higher? Deficiencies of the Static Planning Budget

McGraw-Hill/Irwin Slide 11 Improve performance evaluation. May be prepared for any activity level in the relevant range. Show costs that should have been incurred at the actual level of activity, enabling “apples to apples” cost comparisons. Help managers control costs. Characteristics of Flexible Budgets

McGraw-Hill/Irwin Slide 12  The relevant question is... “How much of the cost variances is due to higher activity, and how much is due to cost control?”  To answer the question, we must the budget to the actual level of activity.  The relevant question is... “How much of the cost variances is due to higher activity, and how much is due to cost control?”  To answer the question, we must the budget to the actual level of activity. Deficiencies of the Static Planning Budget

McGraw-Hill/Irwin Slide 13 How a Flexible Budget Works To a budget, recall that:  Total variable costs change in direct proportion to changes in activity.  Total fixed costs remain unchanged within the relevant range. Fixed Variable

McGraw-Hill/Irwin Slide 14 Let’s prepare a budget for Larry’s Lawn Service. How a Flexible Budget Works

McGraw-Hill/Irwin Slide 15 Preparing a Flexible Budget Larry’s Flexible Budget

McGraw-Hill/Irwin Slide 16 Quick Check What should the total wages and salaries cost be in a flexible budget for 600 lawns? a. $18,000 b. $20,000. c. $23,000. d. $25,000. What should the total wages and salaries cost be in a flexible budget for 600 lawns? a. $18,000 b. $20,000. c. $23,000. d. $25,000.

McGraw-Hill/Irwin Slide 17 Quick Check What should be the total wages and salaries cost in a flexible budget for 600 lawns? a. $18,000 b. $20,000. c. $23,000. d. $25,000. What should be the total wages and salaries cost in a flexible budget for 600 lawns? a. $18,000 b. $20,000. c. $23,000. d. $25,000. Total wages and salaries cost = $5,000 + ($30 per lawn  600 lawns) = $5,000 + $18,000 = $23,000 What should the total wages and salaries cost be in a flexible budget for 600 lawns? a. $18,000 b. $20,000. c. $23,000. d. $25,000. What should the total wages and salaries cost be in a flexible budget for 600 lawns? a. $18,000 b. $20,000. c. $23,000. d. $25,000.

McGraw-Hill/Irwin Slide 18 Learning Objective 2 Prepare a report showing activity variances.

McGraw-Hill/Irwin Slide 19 Activity Variances Planning budget revenues and expenses Flexible budget revenues and expenses activity variances. The differences between the budget amounts are called activity variances.

McGraw-Hill/Irwin Slide 20 Let’s use budgeting concepts to compute activity variances for Larry’s Lawn Service. Let’s use budgeting concepts to compute activity variances for Larry’s Lawn Service. Activity Variances

McGraw-Hill/Irwin Slide 21 Activity Variances Larry’s Flexible Budget Compared with the Planning Budget

McGraw-Hill/Irwin Slide 22 Activity Variances Larry’s Flexible Budget Compared with the Planning Budget Activity and revenue increase by 10 percent, but net operating income increases by more than 10 percent due to the presence of fixed costs.

McGraw-Hill/Irwin Slide 23 Learning Objective 3 Prepare a report showing revenue and spending variances.

McGraw-Hill/Irwin Slide 24 Revenue and Spending Variances Flexible budget revenueActual revenue The difference is a revenue variance. Flexible budget costActual cost The difference is a spending variance.

McGraw-Hill/Irwin Slide 25 Now, let’s use budgeting concepts to compute revenue and spending variances for Larry’s Lawn Service. Now, let’s use budgeting concepts to compute revenue and spending variances for Larry’s Lawn Service. Revenue and Spending Variances

McGraw-Hill/Irwin Slide 26 Revenue and Spending Variances Larry’s Flexible Budget Compared with the Actual Results $1,750 favorable revenue variance

McGraw-Hill/Irwin Slide 27 Larry’s Flexible Budget Compared with the Actual Results Revenue and Spending Variances Spending variances

McGraw-Hill/Irwin Slide 28 Learning Objective 4 Prepare a performance report that combines activity variances and revenue and spending variances.

McGraw-Hill/Irwin Slide 29 Now, let’s use budgeting concepts to combine the revenue and spending variances reports for Larry’s Lawn Service. Now, let’s use budgeting concepts to combine the revenue and spending variances reports for Larry’s Lawn Service. A Performance Report Combining Activity and Revenue and Spending Variances

McGraw-Hill/Irwin Slide 30 A Performance Report Combining Activity and Revenue and Spending Variances

McGraw-Hill/Irwin Slide 31 A Performance Report Combining Activity and Revenue and Spending Variances 50 lawns × $75 per lawn 50 lawns × $30 per lawn

McGraw-Hill/Irwin Slide 32 A Performance Report Combining Activity and Revenue and Spending Variances $43,000 actual - $41,250 budget

McGraw-Hill/Irwin Slide 33 Learning Objective 5 Prepare a flexible budget with more than one cost driver.

McGraw-Hill/Irwin Slide 34 More than one cost driver may be needed to adequately explain all of the costs in an organization. The cost formulas used to prepare a flexible budget can be adjusted to recognize multiple cost drivers. Flexible Budgets with Multiple Cost Drivers

McGraw-Hill/Irwin Slide 35 Because of the large unfavorable wages and salaries spending variance, Larry decided to add an additional cost driver for wages and salaries. The variance is due primarily to the number of hours required for the additional edging and trimming. So Larry estimates the additional hours and builds those hours into both his revenue and expense budget formulas. Larry’s New Budget Flexible Budgets with Multiple Cost Drivers

McGraw-Hill/Irwin Slide 36 Flexible Budgets with Multiple Cost Drivers Larry’s Budget Based on More than One Cost Driver