1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Silver Star Rd. (SR 438) Public Meeting Public Information Meeting Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road From.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Carroll Engineering Corporation Existing Conditions Richland Township Ronald Reagan Drive Extension Richland Elementary School Strayer Middle School Railroad.
F IRST C APITAL E NGINEERING 48 S. Richland Ave. York PA | Phone: | Fax: | TRAFFIC REPORT Kingston Road &
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
West Plumb Lane Project Preliminary Design Public Information Meeting June 4, 2012.
Before you cycle you always check your bike incase something doesn’t work. First you need to check your tires after you done that, check your brakes,
Transport.tamu.edu Options for Access Improvements Near MSC Wednesday, December 7, 2011.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Florida Department of Transportation, November 2009
Slide 1. Slide 2 Introduction How did you get to school as a child?
NCTCOG Sustainable Development Call for Projects Interlocal Cooperative Agreement Reporting Form Reimbursement Phase 2 5/24/20151 This portion.
Miccosukee Road Resurfacing and Re-striping Public Input Requested On-Street Parking vs Bike Lanes.
I-65 Added Travel Lanes Project in Tippecanoe County
From Island Estates Parkway to St. Johns County Line.
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Drive Smart Virginia Sharing the Road 101 OUR WORLD IS CHANGING Are becoming more popular means of travel So is the way we get places. We still like.
Agreement with Town of Tioga, LLC. Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Outdoor Learning Area School Parking School Playground Existing Recreation. Facilities School Parking Neighborhood Tree Buffer Basketball Courts Abandoned.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Sustainable Traffic Management: Freiburg, Germany
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
STA Safety Project PID #76439 December 12, 2006.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Designing for Pedestrian Safety – Road Diets 9-1 ROAD DIETS.
10 -1 ROAD DIETS Before After Designing for Pedestrian Safety – Road Diets.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Traffic Signs Part Two. What do these 2 signs tell you?
Lompoc Walkability Assessment September 24, 2009.
Before After ROAD DIETS MODULE of 9 Safety Proven Countermeasures.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Improvements to Stockton Street
Transportation Engineering Business Development Workshop Department M
District 3 Complete Streets Projects
INTERSECTIONS CHAPTER 10.
Sample Eastern Sustainable Development Project
Building & Property Meeting
Citrus Park Drive Extension
State Road 72 Safety Improvements
Issaquah-Fall City Road
City of Wilmington Bike Plan Update
Safety first… How many of you have crossed a road without looking?
Traffic Study Presented by Keith Wenners, pe, ptoe
Walker Street Reconstruction Project 25% Design Public Hearing
Commissioners Presentation
Presentation transcript:

1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road

2 CONSTRUCTION SCHEDULE  Estimated Construction Time for the entire project is 9 to 12 months.  The Sidewalk Construction started in front of the Deer Lake Middle School and will continue on Deer Lake Road.  Construction activities are generally within two 1,000-foot segments at a time if a second crew can be added.  The construction work in front of the Killearn Lakes Elementary School will be scheduled when the school is not in session.

3 LOCATION MAP

4 SCOPE AND INTENT OF THE IMPROVEMENTS  Add Sidewalks on one side of the Deer Lake Road and Kinhega Drive, and Pedestrian Crossings.  Improve Safety and Function while preserving existing trees, wetlands, and character.  Add Bike Lane Pavement Marking and Signage to both sides of the road.  Reduce the vehicular travel lane width to encourage slower running speeds.

5 MAINTENANCE OF TRAFFIC

6 MOT EXAMPLE DURING CONSTRUCTION

7 POST IMPROVEMENTS TYPICAL PLAN REVIEW

8 TYPICAL SECTIONS

9 EXAMPLE BIKE LANE AND SIDEWALK AFTER CONSTRUCTION

10 EXAMPLE PEDESTRIAN CROSSING

11 CONTACT INFORMATION If you have any questions about this Project, please contact Leon County Public Works at