WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding  Fall 2013 - Presented ‘gaps’ and possible project solutions to WHCA in.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
Advertisements

January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Town of Dryden, NY :: Hamlet of Varna – Community Development Plan Public Workshop Project Scoping/Issues Identification December 1, 2010.
Lawrence Park-Wide Traffic Task Force Update April 11 th, 2008 Lawrence Park Ratepayers Association.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Neighborhood Preservation Program Planning Proposal.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Public Open House February 6, Study Overview - Study Area South North.
City/University Projects Fund Calendar Year 2012 Budget Request.
Hallandale Beach Community Redevelopment Agency Budget Overview Fiscal Year
SOUTH TAMA COUNTY COMMUNITY SCHOOL DISTRICT SAFE ROUTES TO SCHOOL
Yorktown Civic Association Neighborhood Conservation Plan Update March 2006.
Miccosukee Road Resurfacing and Re-striping Public Input Requested On-Street Parking vs Bike Lanes.
Building Healthy Communities “ Healthy Places and Healthy People Go Together” Kate Whitehead, BS Tim Scandale, BS Selina Rooney, RCDC Funded through a.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Cultivating Vitality Services Advisory Committee November 16, 2010 A Strategy to Create a Thriving Downtown Nashua.
Strong Schools, Strong Communities Strategic Plan Implementation Process and Roles Saint Paul Public Schools has designed the following process and roles.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Planning Area Standards May 18, Outline of today’s meeting Introductions Recap of previous community meetings Planning Area Standards Discussion.
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
Crash Impediments Ordinance Update Orange County BCC September 1, 2015.
County of Marin March 2004 County Budget Overview and Potential Impact of State Funding Cuts.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
LE DROIT PARK TRANSPORTATION PACKAGE. BACKGROUND Neighbors across LeDroit have been dealing with many transportation related issues over the years with.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
 HOA Annual Meeting 2012 April  Finances o Current Budget o Current Financial Status  Dead Trees & Pond Fencing  Communication  Landscaping.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Livingston County Transportation Connectivity Plan Final Report December 2013.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
MISSOULA SCHOOL ZONE SPEED LIMITS PUBLIC WORKS COMMITTEE NOVEMBER, 9, 2011.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Objective & Goals The objective of this presentation is to build on the Charrette and Museum Project recommendations and present infrastructure upgrades.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Welcome Open House Public Information Session Reconstruction Project Brunswick Avenue (Guelph Street to Blucher Street) Guelph Street (Ellis Avenue to.
Complete Streets Training Module 4b – Designing for All Users.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Pedestrian Facility Improvement Program
What's in the 2009 MUTCD For Bicyclists?
Presented by Kelsey Lang, Planning Associate June 27, 2016
Improvements to Stockton Street
City of Charlottesville
Jefferson County SA Red Rocks Site Approval
Participatory Budgeting in the 49th Ward Our Eight Year!
Marina Vista Streetscape Project
The Oakton Condominium Association September 12, 2017
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
Transportation Alternatives (TA) Set-aside
Capital Improvement Program
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
City of Wilmington Bike Plan Update
Meadow Lake Boulevard Street Extension Project
Neighborhood Traffic Management Program Greenbrook Drive South
M14A/D Select Bus Service
Alex Henry FDOT District Seven Safety Office
ARCHIE BRIGGS Traffic Calming
Presentation transcript:

WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding  Fall Presented ‘gaps’ and possible project solutions to WHCA in Draft NCP - unanimously approved with one abstention.  March Presented draft list to WHCA for feedback.  April 2014 – Presented draft list to County for input.  April 9, 2014 – Revised list with deletions of some projects. Final draft list of options is presented tonight for discussion only – not voting.  May 7, 2014 – Vote on Priorities Project List to NCAC.

Priority Project on Pedestrian Safety – 18 th Street & Wakefield Discussed in March & Deleted from Original List a.Sidewalk on south side of 18 th Street from Glebe to Wakefield b.Improvements to 18 th Street and Wakefield intersection Rationale – To facilitate pedestrian safety en route to Glebe Elementary School, the County submitted a Revenue Sharing Request last fall to the State. The budget of $152,000 includes some improvements on Glebe, but it specifically regards improvements to the south side of 18 th St. N. from Glebe to Wakefield Street. Includes – sidewalk, retaining wall, curbs, and curb ramps. It also includes improvements to 18 th St. & Wakefield intersection – school crosswalk sign, crosswalk pavement markers, and stop bars. Response anticipated in June - State funds would eliminate the need for NCAC funding. If not approved, could complete survey of residents and submit to NCAC in the fall.

Priority Project for Improved Lighting along Utah – Discussed in March & Deleted from Priority List Utah is an important pedestrian route from Metro. However, the WHCA can not submit this – staff said that existing cobras could be changed to LED but application has to come from Cherrydale ‘s CA – County does not typically install street lighting on both sides of any residential street.

Idea for Priority Project Option # 1 – Woodstock Park Issue – Improvements have been implemented ad hoc, as there Is no master plan to guide priorities. The County Parks and Recreation Department is implementing improvements to the playgrounds & BB court. It does not include the area closest to Woodstock Street, where the WHCA Parks Committee has discussed a quieter zone with adult activities. Proposed Project – Staff recommends that we submit as a single priority project with two internal steps, not phased…first a master plan and then implementation of the recommendations resulting from the master plan. Possible MP Recommendations – Survey, new fencing, solar lighting, site furniture (benches, tables, trash, bike racks), landscaping, maintenance, urban ag, electricity, signage, etc.

Potential NCP Project – Woodstock Park - Master Plan Option 2: Woodstock Park Master Plan

Implementation of recommendations in the Woodstock Park Master Plan

FYI Other Funding - $13,374 in WHCA Fund at Parks and Rec Dept.  County has determined that this must be used for built improvements. Can not be used to fund a community event in the park.  Could recommend it be added to Woodstock Park project funding or could spend separately on ‘hardscape’ improvement.

Idea for Priority Project Option # 2 – Sidewalk on 20 th Road & Utah  Install 5’ Sidewalk (replace existing curb/gutter)  Install retaining walls/replace one existing  Replace steps/hand rails in front of four houses & screen of shrubs at corner house  Move storm drain on 20th, two no parking signs, and Cobra at 2032 Utah WHCA 2013 Draft NCP, 5.0 Transportation, Traffic and Pedestrian Concerns 5.2 Sidewalks, Line 43 NEW SIDEWALK

Option 1: 20th Rd N, and Utah View of proposed sidewalk at 20 th Road & Utah

1. Project is in accord with NCP & County goal to have one sidewalk every street 2. Improves pedestrian access(to Woodstock Park, LH buses, HBW School) and safety for owner at 2032 Utah 3. Residents surveyed indicated support (14 HH/11 Y/3 N/6 unknown-1 WH/5CC) 1.Retaining walls might be costly. 2.One or two existing trees might be lost. 3.Need to coordinate with Cherrydale. Option 2: 20th Rd N, and Utah ProsCons

Q&A Priority Project Options – Submit one or two to County Discussion tonight – Vote at May 7 Meeting 1. Woodstock Park Master Plan & Recommended Improvements 2.20 th Road & Utah Sidewalk – will discuss with Cherrydale NCAC  Which option shall be the priority project?  Shall the other be sent to the County as the second priority?  May 15, 2014 – Deadline for submitting to County for Dec funding round; project would begin accumulating points. Any proposed project, especially the park project, will not be ready for qualification and funding until earliest 2015, probably later, as it has to gain enough points to compete for funding.