2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.

Slides:



Advertisements
Similar presentations
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Advertisements

1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Advanced Project Management - CPH
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Project Management: A Managerial Approach
1 Operations Management Lesson 5 Project Management.
Operations and Supply Chain Management, 8th Edition
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Management. Maintenance and Reliability 14 Aug 2001.
Importance of Project Schedules
BA 333 Operations Management
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Project Management OPIM 310-Lecture.
1 Material Management Class Note # 5-A ( in review ) Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
S N R E University of Michigan Announcements 1. 1.Pick project treasurer All treasurers have group meeting with Mary M. in SNRE business office soon.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Lecture 4 Project Management Chapter 17.
Roberta Russell & Bernard W. Taylor, III
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Scheduling & Budgeting CEE 402 Engineers Without Frontiers Lecture 6 February 26, 2003.
P ROJECT MANAGEMENT Inna Vasiljeva Ryan Chase Konstantin Lizunov.
HIT241 - TIME MANAGEMENT Introduction
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Project Scheduling: PERT/CPM
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Lean Project Management
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
Reid & Sanders, Operations Management © Wiley 2002 Project Management 17 C H A P T E R.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 6 th Edition Chapter.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 Material Management Class Note # 6 Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
To accompany Quantitative Analysis for Management, 7e by Render/Stair 13-1 © 2000 by Prentice Hall, Inc., Upper Saddle River, N.J Quantitative Analysis.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
PERT/CPM By Bhupendra Ratha, Lecturer S. L. I. Sc., D.A.V.V., Indore Id:
PROJECT MANAGEMENT Approaches
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Project Management Organization Scheduling 31 January.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
Operations Management Project Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management: PERT/CPM
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
deterministic Fixed and known in advance, representing a
Project Planning and Budgeting
SE Tasks for a Concept Development Project
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
AOA A style of project network diagram in which arrows
Presentation transcript:

2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon systems –Automotive, Ship, Aircraft –Planning a concert –New Products

3 Project Management  Elements Project Team Project Planning Project Control

4 Project Team

5 Project Planning  Precedence Relationship Sequential relationship of activities in a project  Project planning Define project objective(s) Identify activities Establish precedence relationships Make time estimates Determine project completion time Compare project schedule objectives Determine resource requirements to meet objectives

6 Project Planning  Project Network Building a sidewalk

7 Project Control  Control Activities are identified Activities are completed in order Resource needs Schedule changes and corrections  Main Goal – maintaining project schedule so project in on-time and close to budget

8 Project Control  Work Breakdown Structure (WBS) Method for project planning and control Breaks down components, sub- components, activities, and tasks

9 Work Break Down Structure  Good way to identify activities and determine tasks  Helps identify relationships between modules and activities  Cancels out unnecessary duplication of activities

10 Gantt Chart  Helps identify start of activities end of activities slack time –amount of time an activity can be delayed without delaying the project precedence relationships between activities

11 CPM - Critical Path Method  Definition: In CPM activities are shown as a network of precedence relationships using activity-on-node network construction Single estimate of activity time Deterministic activity times

12 PERT - Project Evaluation & Review Techniques  Definition: In PERT activities are shown as a network of precedence relationships using activity-on-arrow network construction Multiple time estimates Probabilistic activity times

13 Critical Path  Longest path through a network  minimum project completion time

14 Benefits of CPM/PERT  Useful at many stages of project management  Mathematically simple  Give critical path and slack time  Provide project documentation  Useful in monitoring costs

15 Limitations to CPM/PERT  Clearly defined, independent and stable activities  Specified precedence relationships  Subjective time estimates  Over emphasis on critical paths

16 Questions Answered by CPM & PERT  Completion date?  On Schedule?  Within Budget?  Critical Activities?  How can the project be finished early at the least cost?

17 ANY QUESTIONS???