District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.

Slides:



Advertisements
Similar presentations
January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
Advertisements

Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
6 th Street Water Main And Street Reconstruction 2013.
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
November 14, 2014 District Construction Season.
Welcome.
Chubaka Producciones Presenta :.
DISTRICT 1 November 2014 DONNIE DREWER DISTRICT ENGINEER.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Madison Avenue Reconstruction Department of Planning and Development.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
Week 7, April 10, 2017.
Town of Brighton, Department of Public Works
Deadline for Requisitions Payment Processing Date
Regional Roads Committee
June 5, 2017.
Infrastructure Investment Needs
DICKINSON AVENUE RECONSTRUCTION
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
DISTRICT 1 ADVERTISED PROJECTS
Measure A Financial Oversight Committee August 7, 2013
Highway 169 Bridge Replacement & Pavement Resurfacing
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
SE 12th Street Roadway Improvements February 8, 2005.
Public Works Planning and Design Division
McDonald’s Kalender 2009.
District Construction Season
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
Contract 60X10 Informational Meeting Weber I-55
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
District Five Upcoming Projects
February 2007 Note: Source:.
Monterey County Project Report for Measure X Expenditures
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project Development

Contract No. - XY Various Locations in Kent County Contract No. - XY Various Locations in Kent County Resurfacing Advertisement Date: November 1, 2013 Notice to Proceed: January 6, 2014 Approximate Hot Mix Asphalt Tonnage: 35,300 Tons. MD 291 from East of MD 213 to Morgnec Cutoff Road; MD 291 from MD 701 to Daisy Drive; MD 444 from End of SHA Maintenance to MD 444; MD 298 from MD 213 to MD 292 MD 291 MD 444

Contract No. - XY Contract No. - XY Various Locations in Queen Anne’s County Resurfacing Advertisement Date: November 1, 2013 Notice to Proceed: January 13, 2014 Approximate Hot Mix Asphalt Tonnage: 34,850 Tons MD 18V from MD 18B to Structure #17048; MD 300A from U.S. 301 to MD 19; MD 290 from MD 544 to MD 300; MD 404 from Talbot County Line to Caroline County Line; MD 662 from Talbot County Line to U.S. 50, MD 18C in Queenstown Town Limits MD 662MD 300A

Contract No. - AW Contract No. - AW MD 404 from West of MD 309 to Cemetery Road – Phase 1-B 4 Lane Divided Highway Construction Advertisement Date: November 29, 2013 Notice to Proceed: February 10, 2014 Approximate Hot Mix Asphalt Tonnage: 43,000 Tons

Contract No. - CE Existing Bridges on U.S. 1, U.S. 40, MD 222 and MD 272 Contract No. - CE Existing Bridges on U.S. 1, U.S. 40, MD 222 and MD 272 Clean/Paint Bridges Advertisement Date: November 29, 2013 Notice to Proceed: February 10, 2014 U.S. 1 over Branch of Octoraro Creek, U.S. 40 Over North East Creek, U.S. 40 Over Little North East Creek, U.S. 222 Over Octoraro Creek, MD 272 Over North East Creek U.S. 222U.S. 40

Contract No. - QA Contract No. - QA MD 835C from East of Cockey Lane Relocated to MD 18A Town of Stevensville Resurfacing and Safety Improvements Storm Drains, Sidewalk, Geometric Improvements Advertisement Date: November 5, 2013 Notice to Proceed: February 17, 2014 Approximate Hot Mix Asphalt Tonnage: 250 Tons Approximate Concrete Sidewalk Square Feet: 4,200 Square Feet Approximate Brick Sidewalk Square Feet: 1,600 Square Feet

Contract No. - XY Various Locations in Caroline County Contract No. - XY Various Locations in Caroline County Resurfacing Advertisement Date: November 5, 2013 Notice to Proceed: February 10, 2014 Approximate Hot Mix Asphalt Tonnage: 35,000 Tons MD 314 from East of Cranby Street to MD 480; MD 313 from Structure #5027 to MD 314 Spur; MD16 from MD 331 to MD 578; Campground Road from One Block East of MD 404 to One Block West of MD 404 MD 16MD 313

Contract No. - XY Contract No. - XY Various Locations in Cecil County Resurfacing Advertisement Date: November 5, 2013 Notice to Proceed: February 17, 2014 Approximate Hot Mix Asphalt Tonnage: 35,300 Tons U.S. 222 from MD 275 to Mill Street; MD 896 from the Delaware State Line to the Pennsylvania State Line; MD 274 from Post Road to Cecil Community College; MD 545 from MD 279 to Kirk Road; MD 285 from Lock Street to Lewis Street MD 274U.S. 222

Contract No. - AT U.S. 50 from 0.5 Miles West of MD 404 to 0.5 Miles East of MD 404 Contract No. - AT U.S. 50 from 0.5 Miles West of MD 404 to 0.5 Miles East of MD 404 Resurfacing and Safety Improvements Advertisement Date: December 3, 2013 Notice to Proceed: Notice to Proceed Date: March 17, 2014 Approximate Hot Mix Asphalt Tonnage: 6,000 Tons Approximate Concrete Pavement Square Yards: 700 Square Yards

Contract No. - QA Bridge #17030 Contract No. - QA Bridge #17030 MD 313 Over Chester River Bridge Deck Replacement Advertisement Date: December 10, 2013 Notice to Proceed: March 24, 2014

Contract No. - CE Contract No. - CE MD 272 in Cecil County Bridge #7036 over Amtrak Proposed Bridge Replacement Advertise Date: January 7, 2014 Notice to Proceed: April 21, 2014

Contract No. – XY Various Locations in Talbot County Resurfacing Contract No. – XY Various Locations in Talbot County Resurfacing Advertisement Date: January 7, 2014 Notice to Proceed: April 21, 2014 Approximate Hot Mix Asphalt Tonnage: 32,750 Tons MD 33 from Seymour Avenue to Pea Neck Road; MD 33 from Easton Corporate Limits to Washington Street; MD 334 from MD 322 to End of S.H.A. Maintenance; MD 33 from Athletics Field to Marks Lane; MD 309 from U.S. 50 to Ball Park MD 334MD 309

Contract No. - QA U.S. 50 from U.S. 301 to 0.5 Miles West of MD 404 Resurfacing and Safety Improvements Contract No. - QA U.S. 50 from U.S. 301 to 0.5 Miles West of MD 404 Resurfacing and Safety Improvements Advertisement Date: February 14, 2014 Notice to Proceed: May 19, 2014 Approximate Hot Mix Asphalt Tonnage: 36,000 Tons

Contract No. - TA MD 331 over Choptank River Bridge #20034 Bridge Replacement Contract No. - TA MD 331 over Choptank River Bridge #20034 Bridge Replacement Advertisement Date: March 4, 2014 Notice to Proceed: June 16, 2014

Contract No. - KE Contract No. - KE MD 213, MD 290, and MD 313A in Kent County Resurfacing and Safety Improvements Level 1 ADA improvements, signal reconstruction Advertisement Date: April 8, 2014 Notice to Proceed: July 21, 2014 Approximate Hot Mix Asphalt Tonnage: 3,000 Tons Approximate Square Feet of Concrete Sidewalk: 2,400 Square Feet

Contract Number – CE Contract Number – CE US 1 in Cecil County From MD 273A to Pennsylvania State Line Proposed Resurfacing and Safety Improvements Advertise Date: April 22, 2014 Notice to Proceed: August 8, 2014 Approximate Hot Mix Asphalt tonnage: 14,000 Tons

Contract Number – QA Contract Number – QA U.S. 301 at MD 304 Proposed Interchange Construction Advertise Date: June 3, 2014 Notice to Proceed: September 15, 2014