1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
ODOT Structure Project Manager Seminar Specifications
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Supervision and Administration
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director PIAC HAM ; PID Major Rehab - Design Build Project Letting.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Reconstruction of the Eads Bridge Highway Deck
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
 Project Delivery  Design Considerations  Lessons Learned.
Montana Truss Rehabilitation Projects Lozeau Bridge over the Clark Fork Dearborn River High Bridge Van Buren Street over the Clark Fork.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
By PARIKH KALPESH. Overview Introduction Structural evaluation of the bridge deck, girders, abutment, and piers Recommended non destructive tests Short.
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Leadership Summit Cheiko High, Deputy Commissioner, CDOT.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Approaches to Historic Bridge Rehabilitation Case Study #4
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
1905 NW Thurman St Bridge. Project Location Thurman St Bridge.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Pavement Preservation Pavement Sealing COS Pre Bid Meeting March 22, 2016.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
 Final Inspection Reminders  and  Recurring Corrective Work Items.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
NAME OF PROJECT: Construction and Maintenance of Bridges along National Roads-Rehabilitation/Major Repair of Permanent Bridges, Mandaue-Mactan Bridge.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
High Bridge Re-Deck Project
5th Street Bridge Replacement Project Contract No
Project Purpose and Objective
Board of Commissioners Meeting
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
SW Gage Blvd - Street Repair Project
PROJ. 566(17) LOR PID MAJOR WIDENING
Contract 60X10 Informational Meeting Weber I-55
ACEC Designer Training
Presentation transcript:

1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF TRANSPORTATION DIVISION OF BRIDGES

2 COMPONENT REHABILITATION OF TWELVE BRIDGES LOCATIONBOROUGHRAILROADPARKS 174 TH ST. PED. BRIDGE OVER (N) SHERIDANBRONX TH ST. PED. BRIDGE OVER (S) SHERIDANBRONX-- 13 TH AVE. BRIDGE OVER LIRR & NYCTBROOKLYNLIRR/NYCT- 15 TH AVE. BRIDGE OVER LIRR (BAY RIDGE)BROOKLYNLIRR- EAST DR. BRIDGE OVER EASTWOOD ARCHBROOKLYN-YES W 148 TH ST. PED. BRIDGE OVER AMTRAKMANHATTANAMTRAKYES W 181 ST STREET RAMP TO GW BRIDGEMANHATTAN-- INWOOD HILL PARK BR. OVER AMTRAKMANHATTANAMTRAKYES 37 TH STREET BRIDGE OVER BQE/GCPQUEENS-- SUPERIOR ROAD BRIDGE OVER CROSS IS.QUEENS-- JACKIE ROBINSON PKWAY OVER AUSTINQUEENS-- ALBEE AVENUE BRIDGE OVER SIRTSTATEN IS.SIRT-

3 BRIEF DESCRIPTION OF CONSTRUCTION SCOPE OF WORK PERFORMED UNDER COMPONENT REHABILITATION UNIT * CONCRETE REPAIR / REPLACE:DECK, UNDERDECK, SIDEWALK, CURB, PARAPET, FASCIA, PIER, PEDESTAL, BRIDGE SEAT, ABUTMENT, WINGWALL AND APPROACH * STEEL REPAIR / REPLACE:GIRDER, BEAM, STRINGER, RAILING, DIAPHRAGM & FENCE * PAINTING:LIMITED TO REPLACED COMPONENTS OR PAINT OVER GRAFFITI * REPAIR / REPLACE:BEARING, ANCHOR BOLT MASONRY, BRICK AND STONE ELECTRICAL LIGHTING, BRACKETS STAIRWAY AND LANDING JOINT MISCELLANEOUS INCLUSIVE OF COMPLETE SUPERSTRUCTURE * DRAINAGE:CLEARING, CLEANING & IMPROVEMENT * MILLING, RESURFACING, WATERPROOFING: AS REQUIRED

4 SCOPE OF WORK IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS AS REQUIRED REPAIR TOP OF DECK AND UNDERDECK REPLACE AND PAINT PEDESTRIAN FENCING PANELS REPAIR AND PAINT BRICK FACING CLEAN AND REPLACE SCUPPER REPAIR STONE COPING 174 TH STREET PEDESTRIAN BRIDGE OVER (NORTH) SHERIDAN

5 SCOPE OF WORK IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS AS REQUIRED FIELD PAINT PEDESTRIAN FENCING REPAIR AND PAINT BRICK FACING CLEAN SCUPPER AND REPLACE SCUPPER GRATING REPAIR STONE COPING 174 TH STREET PEDESTRIAN BRIDGE OVER (SOUTH) SHERIDAN

6 SCOPE OF WORK OBTAIN RAILROAD PERMIT TO ENTER AND FLAGGING SERVICE SCHEDULE IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS AS REQUIRED REPAIR CONCRETE ENCASEMENT OF SUPERSTRUCTURE ELEMENTS REPAIR CONCRETE DECK OVERLAY REPLACE DECK JOINT SEALANTS REPAIR PIERS AND CRASH WALLS REPAIR PARAPETS 13 TH AVENUE OVER LIRR BAY RIDGE LINE & NYCT

7 SCOPE OF WORK OBTAIN RAILROAD PERMIT AND FLAGGING SERVICE SCHEDULE IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS AS REQUIRED REPAIR DECK OVERLAY REPLACE JOINT SEALANT IN DECK JOINT REPAIR ABUTMENTS AND WINGWALLS RESET BEARING AND SEAL CRACKS IN PEDESTALS PAINT OVER GRAFFITI ON PARAPETS 15 TH AVENUE OVER LIRR BAY RIDGE LINE

8 SCOPE OF WORK IMPLEMENT WORK ZONE PEDESTRIAN TRAFFIC CONTROL PROVISIONS REPAIR STONE MASONRY REPAIR CRACKS AND SPALLS IN FASCIA TUCK POINT BRICK FACING REPLACE UNDERDECK LIGHTING FIXTURES EAST DRIVE OVER EAST WOOD ARCH

9 SCOPE OF WORK OBTAIN RAILROAD PERMIT AND FLAGGING SERVICE SCHEDULE IMPLEMENT WORK ZONE PEDESTRIAN TRAFFIC CONTROL PROVISIONS REPAIR GIRDERS AND UNDERDECK INSTALL AND REMOVE TEMPORARY SUPPORT STRUCTURE REPLACE AND REPAIR BEARINGS REPAIR ABUTMENTS AND STONE MASONRY REMOVE AND REPLACE SOUTH STAIRCASE INSTALL AND REMOVE CLASS B CONTAINMENT SYSTEM PAINT STEEL STRUCTURE LOCALLY INSTALL BICYCLE RAILING ON STAIRCASE W 148 TH STREET PEDESTRIAN BRIDGE OVER AMTRAK WEST

10 SCOPE OF WORK IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS REPAIR UNDERDECK SLAB REMOVE AND REPLACE 75 mm OF ASPHALT OVERLAY ON BRIDGE DECK CONSTRUCT NEW CURBS, SIDEWALKS, BRIDGE RAILING, AND CORRUGATED GUIDE RAIL WITHIN PROJECT LIMITS REPLACE UNDERDECK LIGHTING FIXTURES REINSTALL PAVEMENT STRIPING AND PAVEMENT EMBEDDED TRAFFIC LOOPS WEST 181 ST STREET RAMP TO GW BRIDGE

11 SCOPE OF WORK OBTAIN RAILROAD PERMIT AND FLAGGING SERVICE SCHEDULE IMPLEMENT WORK ZONE PEDESTRIAN TRAFFIC CONTROL PROVISIONS REPAIR STEEL GIRDERS AND STAIRCASES REPAIR DECK AND UNDERDECK INSTALL AND REMOVE TEMPORARY SUPPORT REPLACE AND REPAIR BEARINGS REPAIR ABUTMENT AND PIER INSTALL AND REMOVE CLASS B CONTAINMENT SYSTEM PAINT STEEL GIRDERS, FENCING, AND STAIRCASES LOCALLY INSTALL BICYCLE RAILING ON STAIRCASE INWOOD HILL PARK PEDESTRIAN BRIDGE OVER AMTRAK WEST

12 37 TH STREET BRIDGE OVER BQE/ GCP - QUEENS SCOPE OF WORK IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS REPAIR UNDERDECK FIELD CLEAN AND PAINT BRIDGE RAILING AND FENCE POST REMOVE AND REPLACE CHAIN LINK FENCE REPAIR ABUTMENTS PAINT ABUTMENT AND WINGWALLS

13 SCOPE OF WORK IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS REPAIR UNDERDECK AND ABUTMENTS REPLACE ASPHALT PATCHING LOCALLY REPLACE DECK JOINT JACKIE ROBINSON PARKWAY OVER AUSTIN STREET

14 SCOPE OF WORK IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS REPAIR UNDERDECK, PIER AND ABUTMENTS REPAIR BRIDGE DECK LOCALLY RESEAL SIDEWALK AND PAVEMENT JOINTS SUPERIOR ROAD OVER CROSS ISLAND PARKWAY

15 SCOPE OF WORK OBTAIN RAILROAD PERMIT AND FLAGGING SERVICE SCHEDULE IMPLEMENT WORK ZONE TRAFFIC CONTROL PROVISIONS AS REQUIRED REPAIR UNDERDECK AND CONCRETE ENCASEMENT CLEAN AND RESEAL THE DETERIORATED TRANSVERSE JOINTS REPAIR THE PIERS AND CRASH WALLS REPAIR THE CURBS, SIDEWALKS, AND PARAPETS ALBEE AVENUE OVER SIRT

16 Q.1. Addendum #2 indicates a second revised scope of work with 12 different items that could be a part of each bridge rehab.; will further detail be issued as to which items of work will be performed on each of the structures in order to more accurately propose the amount of staffing and hours required for each structure? A.1. Plans at pre-90% ADP are available for review at 2 Rector Street, 8 th Floor. Q.2. Since no drawings are being made available for review – can a pre-proposal meeting be held to discuss some of the details of this project which haven’t been explored in the RFP (i.e. – staging of work / multiple inspection crews / multiple resident engineers / day vs. night work / permit stipulations from OCMC, etc.)? A.2. This is one Construction Contract and will have one Resident Engineer and one rented field office location for the entire construction duration (1095 CCD’s). It can be anticipated that there may be some night time work depending on the Railroad and Lane Closures permits. Q.3. In the two prior scopes of work, environmental monitoring was a part of the REI’s scope of work. In Addendum #2, that has been removed from the scope. I would like DOT to clarify / confirm that the REI will not be required to provide any Environmental monitoring / hazardous waste management services as part of their scope for any of the 12 bridge rehabs. A.3. This was answered in Addendum #2. Proposers are advised to review the plans to determine extent of work. However, likelihood of environmental monitoring work is very minimal. QUESTIONS AND ANSWERS

17 Q.4. The revised scope of work in Addendum #2 states that “Community liaison as directed by Bridges shall be part of REI services.” This direction needs to be provided now during the RFP stage, so that the appropriate approach and staffing can be considered for the technical and staffing portions of the RFP – please clarify for which projects / structures the Community Liaison needs to be provided and if for the entire duration of the reconstruction of the said structures? A.4. Consultant is required to propose staffing and or approach towards needed community liaison based on their experience and judgment. However full time services will not be necessary. Q.5. Will these 12 bridges be part of one construction contract or will multiple contracts be let for the reconstruction of these structures? A.5. Yes, this will be let as one construction contract. Q.6. Will these 12 bridges be reconstructed concurrently (at the same time) or consecutively (one after the other)? A.6. Construction scheduling / sequencing of bridges will be provided by the Construction Contractor. Q.7. If the answer to #6 is concurrently, will there be a constraint as to how many bridges can be re-constructed by a contractor at the same time? A.7. Yes, there is a constraint, the contractor will not be allowed to work on more than four bridges concurrently. QUESTIONS AND ANSWERS (CONT’D)

18 ANTICIPATED NTP DATE OF CONSTRUCTION CONTRACT: JUNE 2009 STAFFING SHOULD BE SOLELY BASED ON EXPERIENCE AND JUDGMENT –ONE FULL TIME RESIDENT ENGINEER FOR ENTIRE DURATION OF CONSTRUCTION –NO CONSTRUCTION WORK WILL BE ALLOWED WITHOUT THE PRESENCE OF A SENIOR INSPECTOR / INSPECTOR –PROJECT MANAGER’S SERVICES SHOULD BE AVAILABLE AS NEEDED –OFFICE ENGINEER’S SERVICES SHOULD BE PROVIDED AS NEEDED –COMMUNITY LIAISON’S INVOLVEMENT IS ANTICIPATED TO BE MINIMAL OTHER ISSUES

19