Reconstruction of the Eads Bridge Highway Deck

Slides:



Advertisements
Similar presentations
St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
Advertisements

ODOT Structure Project Manager Training
ODOT Structure Project Manager Seminar Concrete Decks
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Bridge Engineering (6) Superstructure – Concrete Bridges
By : Prof.Dr.\Nabil Mahmoud
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
ENG-1010 Lecture 16 Bridge Design.
Chapter 34 Bridge Construction.
POWERPOINT PRESENTATION
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
Chesapeake City Bridge Crack Study
1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Montana Truss Rehabilitation Projects Lozeau Bridge over the Clark Fork Dearborn River High Bridge Van Buren Street over the Clark Fork.
CONSTRUCTION.
Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Chapter 19 Floors.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
Chapter 18 Foundations.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
Foundation Engineering CE 483
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
BRIDGE DESIGN SAIF HAROON BY Post-Doctoral Research Associate
Hays Street Bridge Rehabilitation Patrick Sparks, P.E. Approaches to Historic Bridge Rehabilitation Case Study #1 1.
There are many types of bridges including:
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Approaches to Historic Bridge Rehabilitation Case Study #4
Introduction to a pit installation
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
Bridge Engineering (5) Substructure – Abutments and Piers
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
STRUCTURE By Simonnett Rosenberg Gabriela Di Lorenzo.
1 AASHTOWare Bridge Technical Update AASHTOWare Bridge Rating/Design User Group Training Meeting Traverse City – August 2014.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
TYPICAL member spot checks & alternate systems design study
C. C. Fu, Ph.D., P.E. The BEST Center
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
It doesn’t matter what the subject is; once you’ve learnt how to study, you can do anything you want.
Introduction Joshua Castillo Construction Management Center for Creative and Performing Arts High School (CAPA High School) Pittsburgh, Pennsylvania.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
DIFFERENT TYPE OF BRIDGES
1905 NW Thurman St Bridge. Project Location Thurman St Bridge.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Typical Bridge Components
Approaches to Historic Bridge Rehabilitation Case Study #2
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
High Bridge Re-Deck Project
Introduction Signing for Interchanges Naming Convention
Engineering Terms Bridge Unit.
Introduction to Bridge INspection
New Bridge Construction
Blatnik Bridge Management Study
Chapter-2 Parts of Steel Bridges.
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
Arch205 Materials and building construction 1 foundation
Board of Commissioners Meeting
Arch205 building construction foundation
Course Contents Culverts Bridges Buildings 20 November 2018.
Building Construction I Sofia Sebastian 1
Presentation transcript:

Reconstruction of the Eads Bridge Highway Deck Michael J. Cronin, PE, SE

Eads Bridge History Opened to traffic July 4, 1874 Designed and planned by James Buchanan Eads Underwater salvage expert Shipbuilder No formal education Hired by the St. Louis and Illinois Bridge Company as engineer-in-chief for this project

Eads Bridge History Design and construction innovations deep pressurized caisson construction

Eads Bridge History Design and construction innovations deep pressurized caisson construction high strength cast steel

Eads Bridge History Design and construction innovations deep pressurized caisson construction high strength cast steel design of components to permit ease of replacement

Eads Bridge History Design and construction innovations deep pressurized caisson construction high strength cast steel design of components to permit ease of replacement cantilever construction of main arch spans

Eads Bridge History Design and construction innovations Deep pressurized caisson construction high strength cast steel design of components to permit ease of replacement cantilever construction of main arch spans 500 ft spans were 200 ft longer than any built previously

Bridge Ownership History Illinois and St Louis Bridge Company Missouri Pacific Railroad Company Terminal Railroad Association City of St. Louis / Bi-State Development Agency

Rehabilitation Challenges Preserve historically important aesthetic elements Use existing substructure to support new highway deck Maintain light rail traffic during construction

New Cross Section Four 11 ft lanes designed for HS-20 loading 1 ft offset between outside lanes and the Jersey barriers 5 ft sidewalk on south side of roadway

Bridge Sections West Approach West Arcade Main Spans East Arcade East Approach

West Approach & East Arcade Substructure: 3 longitudinal walls Outside walls of stone or brick masonry, original construction Center wall of minimally reinforce concrete, constructed in the 1920’s Substructure repairs Tuckpointing Crack repair Reinforced concrete pads

West Approach & East Arcade Longitudinal concrete beams over First and Second Streets Spalled and cracked Some section loss in reinforcing Capacity found to be marginally acceptable Repairs fiber composite wrap total replacement

West Approach & East Arcade Existing superstructure: transverse concrete floorbeams with distinctive sloped ends Replaced with prestressed concrete I girders with special ends designed as 2 span continuous to maintain distribution to supporting walls Precast SIP form panels utilized

West Arcade Substructure: 2 longitudinal walls East portion - stone masonry arches in fairly good condition concrete infill used to strengthen arches West portion - reinforced concrete open arches in poor condition total replacement with new reinforced concrete arches

West Arcade Existing superstructure non-composite rolled beams at 4 ft spacing deck replaced in early 1980’s design called for cleaning & painting beams, scarifying & overlaying deck Change order proposed by contractor total replacement of superstructure with composite rolled beams at 8.5 ft spacing

Main Spans Existing substructure - 2 piers and 2 abutments founded on bedrock Good condition Top surfaces of piers and abutments required crack repair and resurfacing

Main Spans Arch truss superstructure no retrofit required if dead load from new floor system and deck is held < 116 psf

Main Span Floor System Existing floor system: half-filled grid deck on floorbeams at 6 ft spacing New floor system eliminated floorbeams between columns - 12 ft spacing Exodermic™ Deck specified to span the 12 ft between floorbeams 74 psf using standard weight aggregate

Main Span Floor System The Exodermic™ deck, or an “unfilled steel grid deck composite with a ±4.5” reinforced concrete slab” provides: Light weight Structural efficiency Protection of Light Rail operating below

ExodermicTM Bridge Deck

Special Main Span Features Overlook areas at piers and abutments Bridge can be closed to traffic for special weekend events Electrical outlets built into north barrier

East Approach 10 spans of new steel superstructure on new concrete substructure - 1000 ft Highway deck starts above MetroLink track and end below Highway deck had to be built around MetroLink bridge and elevated station as well as abandoned foundations

East Approach Drilled shaft construction one shaft per pier up to 7 ft in diameter utilized to minimize footprint and to avoid vibrating adjacent MetroLink foundation

East Approach Steel straddle bents transverse beams support the highway deck over the MetroLink tracks and elevated station platform where traditional supports cannot be used

Connection to MetroLink Handicap accessible ramp built to connect sidewalk to East Riverfront Station

Reopening - July 4, 2003

THANK YOU