Complete Streets & Your Local MPO IL APA Conference September 23, 2010 John A. Chambers Senior Planner Tri-County Regional Planning Commission.

Slides:



Advertisements
Similar presentations
Danville Area Transportation Study. Fundamentals of Metropolitan Planning Organizations Adam Aull Danville Area Transportation Study MPO ASCE Presentation.
Advertisements

ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
How Did They Do That- In Northeast Ohio? & What’s Happening in the Region? Sally Hanley, Senior Transportation Planner Northeast Ohio Areawide Coordinating.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
State of Morrisville Mayor Mark Stohlman July 17, 2014.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Dowling Associates, Inc. Combining Pedestrian Plans & ADA Transition Plans Combining Pedestrian Plans and ADA Transition Plans Gail Payne Dowling Associates,
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Introducing Bicycle/Pedestrian Planning & School Travel Plans Presentation prepared for the 2010 Active Transportation Conference Jim Fisher, PhD, AICP.
Florida Department of Transportation, November 2009
City of Peterborough Synergy of Trails and Sidewalks.
1 How to Succeed in Statewide and MPO Transportation Planning.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
ADVOCACY ADVANCE ACTION 2020 WORKSHOP  Action 2020 Workshop ACTION 2020 WORKSHOP Tucson, AZ September 16 1.
Illinois American Planning Association State Conference Complete Streets and Beyond Todd Hill, Bicycle and Pedestrian Coordinator Illinois Department of.
Complete Streets Policy and Implementation Jason Ridgway February 11, 2014.
Navigating MAP-21 Workshop: Hidalgo County Profile Presented by Andrew A. Canon, Transportation Director Hidalgo County MPO 510 S Pleasantview Dr., Weslaco,
PennDOT’s Transportation Alternatives Program February 18, 2014.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Why do you need a plan for walkers? They can walk anywhere, can’t they?
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
Cape Cod Transportation Improvement Program (TIP) HOW DOES A PROJECT GET ONTO THE TIP ? Priscilla Leclerc, Senior Transportation Planner Cape Cod Commission.
Ohio Transportation Planning Conference July 16, 2014.
Complete Streets for Planners MN APA Conference September 28, 2011 Ethan Fawley, Fresh Energy.
Quality Region Principles The New Visions Plan addresses the region’s quality of life in a number of important ways and provides a framework for improving.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Amy Johnson Executive Director Palmetto Cycling Coalition Advocating Locally for a Better Transportation Network.
Regional Bicycle Planning Town of Wellesley September 20, 2006 Scott Walker, MAPC.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
Plan and TIP Prioritization Process September 2015.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
On the Road to a New Metropolitan Transportation Plan Spokane Regional Health District Board of Health April 25, 2013.
MOBILITY 2030: THE METROPOLITAN TRANSPORTATION PLAN FOR THE DALLAS-FORT WORTH METROPOLITAN AREA North Central Texas Council of Governments Transportation.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
Phase 2: 30% Design Plans September 4 th, 2012.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
Transportation Funding Workshop Nova Southeastern University December 10, 2012.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
AASHTO ANNUAL MEETING STANDING COMMITTEE ON PLANNING BILOXI, MS OCTOBER 30, 2010 Potential Changes to STAA Planning Process and Performance Measurement.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
December 2015 Bicycle and Pedestrian Project Funding Lauren Blackburn.
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015.
PennDOT’s Transportation Alternatives Program November 16, 2015.
Why do you need a plan for walkers? They can walk anywhere, can’t they?
Mayor Karl Dean, Chairman Integrating Health and Transportation: Policy, Projects, Data Collection and Monetization Rochelle Carpenter National Health.
Complete Streets Training
Unit 2 DEVELOPMENT OF THE LONG RANGE TRANSPORTATION PLAN (LRTP) LCTCC Educational Program.
Maintenance and Temporary Traffic Control
Complete Streets Training Module 4b – Designing for All Users.
Urban Street Design Standards Overview of Project and Details
REGIONAL BICYCLE AND PEDESTRIAN PLAN
US 92 Pedestrian Connectivity & Safety Assessment Study
Draft Transportation Element September 6, 2017
US 92 Pedestrian Connectivity & Safety Assessment Study
STP Shared Local Fund: Project Evaluation Criteria
Hillsborough County Initiatives to Address School Safety
Navigating MAP-21 Workshop: Hidalgo County Profile
MPO Board Presentation
Design Standards.
What follows after approval of Active Transportation
Thought question If you could fix one single thing in the state of Missouri for bicyclists If you could magically and instantly complete one.
Presentation transcript:

Complete Streets & Your Local MPO IL APA Conference September 23, 2010 John A. Chambers Senior Planner Tri-County Regional Planning Commission

Complete Streets & Your Local MPO MPO Basics The MPO and Complete Streets Case Study: The Peoria-Pekin MPO Policy Results Strategies to Use in Your Community

MPO Basics MPO = Metropolitan Planning Organization Sets Transportation Policy Local Government & Transportation Representatives Required in urban areas > 50,000 pop.

MPO Basics Manages the 3-C planning process ◦Comprehensive ◦Cooperative ◦Continuing Creates Planning Documents ◦Long-Range Transportation Plan (LRTP) ◦Transportation Improvement Program (TIP) ◦Unified Planning Work Program (UWP) Programs Federal Transportation $ (in part)

The MPO and Complete Streets The MPO sets Transportation Policy Policy Directs Expenditures & Infrastructure Bicycling/Walking Infrastructure is a policy-level issue

The MPO and Complete Streets IF YOU WANT BIKE/PED FRIENDLY INFRASTRUCTURE… YOU MUST FIRST HAVE BIKE/PED FRIENDLY POLICY!

Case Study: The Peoria-Pekin MPO Bike/Ped-Friendly Planning Activity (UWP) ◦Trail Planning ◦Bike-to-Work-Week ◦Clean Air Action Regional Transportation Plan (LRTP) ◦Integrate Bike/Ped Plans with Roadway Plans ◦Complete Streets for all, ESPECIALLY State Routes! Quality Control (TIP) ◦In Progress!

Case Study: The Peoria-Pekin MPO Surface Transportation Program – Urban (STU) ◦Policy Pre-2006:  Qualitative Criteria – “Does your project provide access to cyclists and pedestrians?” ◦Policy Post-2006:  Quantitative Criteria – “HOW does your project provide access to cyclists and pedestrians?” ◦ Rankings advisory, not binding  Three Categories: Roadway, New RoadwayNon- Roadway

Case Study: The Peoria-Pekin MPO Existing Roadway Project Scoring: 1.Regional Significance – 30 points 2.Local Priority – 15 points 3.Safety – 23 points 4.Existing Conditions – 17 points 5.Multi-Modal – 15 points (10 Bike/Ped) 100 points total – 10% for Bike/Ped

Case Study: The Peoria-Pekin MPO New-Roadway Project Scoring: 1.Regional Significance – 60 points 2.Local Priority –15 points 3.Planning/Environment – 10 points 4.Multi-Modal – 15 points (10 bike/ped) 100 points total – 10% for Bike/Ped

Case Study: The Peoria-Pekin MPO Non-Roadway Project Scoring: 1.Regional Significance – 30 points 2.Local Priority – 15 points 3.LRTP Conformity – 5 points 4.Project Merit – 50 points Project Merit points determined by Sub- Committee of the MPO ◦Utilize IDOT’s Enhancement Program criteria

Case Study: The Peoria-Pekin MPO Multi-Modal: Pedestrians (6 maximum) ImprovementPoints Received Sidewalk on both Sides 4 Sidewalk on one Side 2 Right of Way Preservation w/ Flattened groundwork 1 No access 0 Ped-Activated Signals and Crosswalks + 1 Median and Corner refuge islands + 1 (A multi-use 10’ separated sidepath counts as a sidewalk)

Case Study: The Peoria-Pekin MPO Improvement Points Received 10-foot wide multi-use separated sidepath on at least one side 5 Minimum of 5-feet wide on-road, marked bicycle lanes on both sides Paved shoulders on both sides w/minimum of 3 feet clear of rumble strips 14’ wide curb lanes 3 Right-of-Way preservation w/flattened ground work 1 No access 0 Multi-Modal: Bicyclist (5 maximum)

Case Study: The Peoria-Pekin MPO Multi-Modal: Mass Transit (4 maximum) Receive 1 point for each criteria fulfilled Criteria An existing transit route An existing transit stop A transit turnout is included in project Scope A proposed route is part of a formally-adopted transit plan

Policy Results General Results of the New STP-U Policy: ◦Hard rankings = fewer politics (but not zero politics!) ◦Rankings weed out the weakest projects

Policy Results Specific Bike/Ped Results : 2005 Funded Projects ◦Last round Pre-Policy update ◦Total roadway applications – 11  Excellent or good access – 0  Marginal access (sidewalk only) – 1  Minimal access (2’ earthen shoulders)– 2  No Access – 8 !!!

Policy Results 2007 Funding Round ◦Several “revised” applications ◦Total Roadway Applications – 7  Excellent or good access – 5 (3 funded)  Minimal access (earthen shoulder) – 2 (2 funded)  No Access – 0 ◦Non-Roadway Applications – 1  Public Trailhead Facility – funded!

Policy Results 2010 Funding Round ◦Total Roadway Applications – 7  Excellent or good access – 6 (4 funded) ◦ Multi-use path – 4 (All funded) ◦ Bike lanes & Sidewalks – 1 ◦ Pedestrian bridge w/sidewalk – 1  No access – 1

Strategies to Use in Your Community Biking & Walking is Transportation, not simply an Amenity Policy Not Working? Change the Policy! Engage Your MPO!

Strategies to Use in Your Community Go Beyond Your MPO – Local Streets Integrate Plans are not enough – Regular Coordination with Public Works/Engineering Put Complete Streets into development ordinances

Complete Streets & Your Local MPO Thank you! John A. Chambers