Slide 1. Slide 2 Introduction How did you get to school as a child?

Slides:



Advertisements
Similar presentations
Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Advertisements

City Managers Neighborhood Impact Initiative Impact Initiative Acre & Pawtucketville.
+ Establishing Safe Communities in Madison County, Kentucky Presentation by: Ruth Hawkins, MSN, RN, CHES Lloyd Jordinson, RN Dorathy Lachman, MD Creating.
Louisiana Safe Routes To School Program
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Pedestrian and Bicycle Issues Richmond, CA Richmond Bicycle & Pedestrian Advisory Committee (RBPAC) June 2, 2008.
Presentation to the TRSD School Board April 17, 2014 Michael Hollow, Grade 5.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
Southern Corridor Study Recommendations March 16, 2011.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Safe Routes To School Improving Health, Safety and Transportation Lenexa, KS.
Town of Moultonborough Safe Routes to School Startup Application.
PTO Back to School Night Introduction to our new Access Drive “We are committed to making our school and community safer”
Shared Lane Markings aka “Sharrows” Nick Kittle Public Works Team Leader Informal City Council April 25 th, 2011.
SOUTH TAMA COUNTY COMMUNITY SCHOOL DISTRICT SAFE ROUTES TO SCHOOL
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
Safe Routes to School Chad Triolet Safe Routes to School Coordinator for Chesapeake Public Schools Chesapeake, VA Making Schools and Communities Safe and.
 Jebessa Dara  Josh Finley  Jon Gibson  Rodney Pfiefle.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
2010 Wisconsin Safe Routes to School Funding SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.
Safe Routes To School Lenexa, KS. Additional Content Added by: City, Unified School Dist, & NCWRPC Why Safe Routes To School? 1.Fewer kids walk and bike.
Student(s) Drop Off and Pick Up Our goal is to make the school community safer.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Effective Transportation Planning City of Seattle, WA.
Funding Opportunities Safe Routes to School program Approximately $1.5 million available per year Future funding is uncertain Held 5 application cycles.
Safe Routes to School  First word is “Safe”  Physical fitness.  Reduced congestion.  Clean air.  A fun way to get to school.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Sustainable Traffic Management: Freiburg, Germany
Louisiana Safe Routes To School Program NON INFRASTRUCTURE.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
The Main Street Bike Lane Project LADOT Bike Program.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Where is the Safe Routes to School program in Fairfax County?
Safe Routes to School Helping more children bicycle and walk to school.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
THE LOOP Introduction to the car-line Safety is our number one priority!
Traffic Safety. WHY ARE WE HERE To keep children safe around our schools What we will be discussing –Driving safely in and around Schools –Bicycle safety.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting May 13-14, 2014.
For El Paso, TX. Has this happened to you? As a motorist?
39 th Ave NE Greenway – NPSF Curb Ramps Grant Andres Salomon.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Lompoc Walkability Assessment September 24, 2009.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Union Park District Council Streets & Utilities CIB Proposal Pedestrian Safety & Traffic Improvements in the Snelling-Selby Area.
PROMOTING BIKING AND WALKING AS FUN, HEALTHY FORMS OF TRANSPORTATION IN PHILADELPHIA ELEMENTARY SCHOOLS.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
BIKE AND PEDESTRIAN IMPROVEMENTS AND EDUCATION HILLSBOROUGH COUNTY PUBLIC SCHOOLS MPO SCHOOL TRANSPORTATION WORKING GROUP
SDOT’s core principles Keep it safe Focus on the basics Build healthy communities Support a thriving economy Provide great service 1.
Saving the King Street Bicycle Boulevard
Bicycle Lanes for the City of Boston
Rules of the Road Chapter 4 Traffic Laws.
Texas Department of Transportation
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Brian Dougherty May 26, 2015 Public Art Advisory Committee
DDOT Western Avenue, NW Project
Safe Routes to School John Schaefer State Coordinator.
Presentation transcript:

Slide 1

Slide 2 Introduction How did you get to school as a child?

Slide 3 Neighborhood Street Fund Applications submitted to SDOT by community This application received in 2007 Funding provided by Bridging the Gap voter approved transportation levy

Slide 4 Walking Routes to School Most walking routes lead to S Orcas Street Many students have to cross S Orcas Street Lack of sidewalk on south side forces some children to cross where there is no crossing guard (32 nd, Beacon, MLK)

Slide 5 SDOT Safe Routes to School School selected for city program in 2009 SDOT worked with the school in to make small improvements Mini grant awarded to the school to make traffic improvements on school property

Slide School Walking Audit Top priority to fill missing sidewalk segments on S Orcas St Clear desire lines for a sidewalk on south side Lack of money to build all missing segments Request to identify additional funding

Slide 7 Recent Investments School zone beacons Sidewalk gap filled New marked crosswalk at 32 nd New marked crosswalk at Beacon

Slide 8 WSDOT State Safe Routes to School funding for large projects SDOT submitted application in 2010 Grant was awarded Includes money for sidewalk + education, encouragement, enforcement

Slide 9 Sidewalk proposal Beacon Avenue S to 28 th Avenue S 6’ sidewalk on south side Planting strip Street trees Curb on both sides of the street May change how you park your car on the street

Slide 10 Parking Study Parking utilization studied at various times DayDateTime Friday2/18/115 am Sunday2/20/105 am Friday6/10/1111 am

Slide 11 Parking study results Every house (18 houses) will have space available after consolidation Peak parking demand was measured as 19 spaces Parking available after consolidation will be 28 spaces Parking utilization post- consolidation will be 68% 32 nd Ave S 28 th Ave S Beacon Ave S Peak demand = 19 Proposed = 28 Available spaces = 9 68% No data available

Slide 12 Sidewalk proposal - extension Possible sidewalk extension from 28 th Avenue S to 32 nd Avenue S Would complete the sidewalk from Beacon to MLK Needs additional funding Exploring funding through Sidewalk Development and TIB grant

Slide 13 Traffic Benefits Planting strip buffers Street trees calm traffic Curb protects new trees and sidewalk Prevents cars from parking on sidewalk Uphill bike lane gets slower moving cyclists out of travel lane

Slide 14 Before and After S Columbian Way BeforeS Columbian Way After

Slide 15 Crossing improvements Shortens the Beacon Avenue S crossing Shortens the 28 th Avenue S crossing Right turns slower Less exposure of pedestrians to motor vehicle traffic

Slide 16 Bicycle Connections Dearborn Park Chief Sealth Trail Beacon Avenue S

Slide 17 Bicycle improvements Uphill bike lane Downhill sharrows Connects the Chief Sealth Trail with Beacon Avenue S Slower moving bicycles out of the travel lane Additional funding needed to complete bike lane

Slide 18 Funding considerations Costs may increase as design proceeds Bicycle improvements are not yet fully funded Extension of the sidewalk between 28 th and 32 nd is not yet funded We will explore all opportunities for funding

Slide 19 History of SRTS at Dearborn Park Start Strong Project,

Slide 20 Education and Encouragement (January 2012 – June 2013) Feet First Cascade Bicycle Club For Families, Students, Teachers and the School District

Slide 21 The Walk & Bike Audit (March/April 2012)

Slide 22 Walk & Bike to School Days

Slide 23 Evaluation Goal to increase number of students walking and biking to school In 2010: –42% bus –42% driven –11% walked –4% carpool –Less than 1% biked Shift to neighborhood schools

Slide 24 Enforcement Speed enforcement Variable radar speed sign Communicate traffic circulation plan Help parents understand rules and expectations Student patrol and adult crossing guard

Slide 25 Timeline Design 2011 Education and Encouragement 2012 Enforcement 2012 Summer-Fall 2012 sidewalk construction

Slide 26 Questions