Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.

Slides:



Advertisements
Similar presentations
West County Transit Enhancement Plan Monday, May 16, 2011 Hercules City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Advertisements

Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Downtown Access Improvements Plan Town of Hillsborough 2014.
Urban Design Audit Downtown Torrington, CT. P = Peripheral Connectivity Connectivity to Surrounding Districts: Logical and efficient traffic flow, linkages.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
PAC/Garage/SCP South Campus Traffic Flow Logistics 6/28/2011.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
Silver Star Rd. (SR 438) Public Meeting Public Information Meeting Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road From.
May – August Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete.
45 th Ave S Shared Street Design Commission September 17 th, 2009 Megan Hoyt SDOT Traffic Operations.
SUNY Canton Facilities Project Update Miscellaneous.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
A Plan for Billerica Center A Suggested Traffic Flow Pattern and Expanded Common That Will Provide A Safer, More Appealing, More Vibrant Billerica Center.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Prepared by: Nicole Cameron, Lucy Gillis, Cameron Brow and Shawn Kieley February 2 nd 2015.
Yorktown Civic Association Neighborhood Conservation Plan Update March 2006.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Mesa & Cincinnati Presentation to City Council June 19, 2007.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
Pedestrian OC Does Not Cross Amador St 1 Safety Issues Riverside Elementary School Amador St.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
With Pictures.  Bus Bus Schedule CarBike BicycleTruck.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Student(s) Drop Off and Pick Up Our goal is to make the school community safer.
Adams-14 School District Facilities Master Plan Kearney Middle School Focused Site Evaluation SITE DRAINAGE OBSERVATIONS General – Site drainage was primarily.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Parent Drop off Please drop off between the cross walks. Pull up as far as possible. Do not let your students out before the crosswalk. If you pull into.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Project Update Colorado Esplanade Project.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Traffic safety & Operations Laboratory Traffic safety & Operations Laboratory DC MPD DC MPD March 2009 Traffic Simulation of Chartered Bus Operation Plan.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
The Main Street Bike Lane Project LADOT Bike Program.
UMSC Meeting Chicago to  Urbana-Champaign By Bryce Ching UMSC Historian.
Campus Change: Help Manage Construction Impacts ▸ General Academic Building No. 1 construction to begin in spring semester ▸ Plans are underway to close.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting May 13-14, 2014.
39 th Ave NE Greenway – NPSF Curb Ramps Grant Andres Salomon.
A PRESENTATION BY THE DISTRICT 1 COMMUITY COUNCIL SIDEWALK TO BATTLE CREEK REC.
City of Belmont Pavement Reconstruction Project October 15, 2014.
City of Cambridge Department of Public Works October 19, 2010 Schedule: Construction Beginning: October 2010 Construction Duration: 18 months Contractor:
S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.
Light Rail Project Community Light Rail Support Plan Committee 14 August 2014 Kensington Kingsford.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Improvements to Stockton Street
District 3 Complete Streets Projects
Stanford Avenue/El Camino Real Intersection Improvements Project
HHS Freshman Academy Update
SE 12th Street Roadway Improvements February 8, 2005.
Marin-Curtis Safe Routes to School
LANE FOR STUDENT DROP OFF
Managed Parking solutions
Presentation transcript:

Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only

Plummer St. Sidewalk, Darby to Etiwanda Ave. The existing sidewalk along the south side of Plummer is an aging asphalt walk with significant cracking and buckling. This project will construct a new ADA compliant walkway leading into the campus core, along with lighting and landscape improvements. Status: Currently in design, with construction scheduled for summer 2014.

Lindley Ave Pilot Closure Project In response to safety and pedestrian safety concerns from the survey, in Fall 2013 Lindley Ave. (from the F2 Parking Lot to Vincennes Avenue) was closed to non-essential traffic (Monday-Friday). The closure of Lindley Avenue facilitates safer and free flowing pedestrian street crossings along Lindley Ave through the center, or core, of the campus. While this project was not specifically named as project, the closure has been extremely successful and continues into the Spring Semester 2014.