Basketball Court Design Team Design:Adel Alnasser Daij Alfahad Hamad Alqalaf 1.

Slides:



Advertisements
Similar presentations
Utilizing GIS in US-Mexico Border Fence Construction
Advertisements

ENGINEERING AND TECHNOLOGY Northwest Public Works Institute Liz Moorhead, PE Senior Engineer, City of Portland.
APEX Engineering Ian Braun Andrew Halley Jorge Hernandez Mohamad Haikal Bin Maamor PROPOSED HUALAPAI MUSEUM SITE DESIGN 1.
Shell Island West NRDA Restoration
City of Hillsdale & Hillsdale Township.  Location  Socioeconomic Summary  Population History & Projections  Age & Sex of the Population  Household.
Progress Report – Design of Native Wetland Nursery Facility Design of Native Wetland Nursery Facility For Metro’s Native Plant Center Prepared by: Portland.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Hillsborough County Property Goffstown, NH Wetland Inventory Fall 2007.
SURVEYS & GEOMATICS PC 1580 (Kitchener) Brian Campbell, O.L.S.
Dan Vroom Ryan LaReau David Westlund Eric Eylander Team Bridge.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Stormwater Quality Enhancement
Three Point Consulting Hawthorn Park Enhancement Project 3 Consulting TT hree Poin.
Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Civil engineering branches & scopes
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Rush Creek: A Story of Redemption. Arlington Stormwater Division  Stormwater Division of Public Works is:  Engineers  Education  Environmental Compliance.
Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan HaynerGraphic Designer Peter Kennedy McMinnResearcher.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015 Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015.
Peach Springs Underpass/Overpass (Structural) Presentation By: Flag-Tech Engineering Yuliang Wang, Yiyang Chen, Jonathan Melendez.
2012 CITY OF MIDDLETON SATISFACTION SURVEY WORKING DRAFT - PROPOSAL.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Dr. Cris Koutsougeras Advisor: Edward Rode.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
HYDROLOGIC DATA. BACKGROUND Analysis and synthesis of data is required to perform any hydrologic computation. The engineer needs to: Identify and define.
What is a Grading & Drainage Plan?
ASCE 2007 International Roundtable Building Water Infrastructure for Sustainable Development Development of Flood Control Scheme in Japan - Comprehensive.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
HOUSING STAKEHOLDERS. To achieve a successful planning and execution of large scale development projects, consideration should be given to the establishment.
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
SUBCOMMITTEE ON SEDIMENTATION Proposal to become a subgroup under the ACWI September 9, 2003.
Campus Storm Water Proposal A Storm Water Solutions Project.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
Deliverables within Scope Review and discuss client vision for website development Development of an infrastructure that supports the website requirements.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
Town of Watertown Staffing and Operational Assessment of the Public Works Department September 10, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
How a topographical map is made.
Sinclair Wash Stream Restoration Feasibility Study
Scoping Meeting April 20th 6:00 pm
NAU International pavilion expansion
Presenter Name | Company Name
Fredonia, AZ Water Use Study:
Presenter Name | Company Name
General Information and data needed for topographic survey A
Presenter Name | Company Name
Memorial Park Detention Basin Project
Property Management Web Design
Land Use and Zoning Committee Special Workshop
Presenter Name | Company Name
San Simon Dam Break Study CENE 476
Presenter Name | Company Name
Presenter Name | Company Name
Infrastructure planning and management
Presenter Name | Company Name
Unit 5 – eProject – Starting to look at projects Unit 5
Competency: Create site plan drawings
CENE Old Town Frame Company
Bellemont Fire Station Addition
Presenter Name | Company Name
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
CENE 486 CAPSTONE PRESENTATION APRIL 26th, 2019 ANNA KURN  
Presentation transcript:

Basketball Court Design Team Design:Adel Alnasser Daij Alfahad Hamad Alqalaf 1

Overview  Project Understanding  Scope of Services  Schedule  Cost of The Project  Project Summary Daij Alfahad 2

Project Understanding  Stakeholders, Client and Technical Advisor  Project Description  Background Information  Purpose of The Project Daij Alfahad 3

Stakeholders, Client and Technical Advisor Client: Dr. Edward Smaglik Technical Advisor: Mr. Mark Lamer Stakeholder: Homeowner Association Management Daij Alfahad 4

Project Description  The design of full basketball court with maintaining the existing drainage system.  Location: 590 W Cinnabar Trail, Flagstaff AZ,  Area of the empty land is: 4.79 Acres Daij Alfahad 5

Background Information  The land existing condition. Detention Basin Trees No Parking Located in Between two houses. Daij Alfahad 6

Purpose of The Project  Site Development.  The project will occupy the empty land.  The project will meet the resident's satisfaction. Daij Alfahad 7

Scope of Services  Task 1: Project management  Task 2: Data Collection  Task 3: Surveying  Task 4: Hydrology Analysis  Task 5: Geotechnical Analysis  Task 6: Drainage System Design  Task 7: Court Design  Task 8: Additional Features  Task 9: Traffic Analysis  Task 10: Final Design Adel Alnasser 8

 Task 1: Project management 1.1 Professional Meetings 1.2 Team Meetings  Task 2: Data Collection 2.1 Meeting with Homeowner Association 2.2 Policies and Regulations Research  Task 3: Surveying 3.1 Data Collection 3.2 Topographic Map  Task 4: Hydrology Analysis 4.1 Existing Infrastructure Analysis 4.2 Runoff Analysis Adel Alnasser 9

 Task 5: Geotechnical Analysis 5.1 Soil Analysis 5.2 Cut/Fill and Compaction  Task 6: Drainage System Design 6.1 Improving The Design of The Detention Basin  Task 7: Court Design 7.1 Court Dimensions 7.2 Court Surface Material 7.3 Basketball Court Equipment  Task 8: Additional Features 8.1 Sidewalk and Benches 8.2 Fence Adel Alnasser 10

 Task 9: Traffic Analysis 9.1 Traffic Signage 9.2 Traffic Striping  Task 10: Final Design 10.1 Design Report 10.2 Presentation 10.3 Website Hamad Alqalaf 11

Schedule Hamad Alqalaf 12

Cost of The Project TasksStaffClassificationRate ($/hr)HoursCost Estimate($) 1.1 Professional Meetings Hamad Alqalaf Adel Alnasser Daij Alfahad Engineering Team meetings Hamad Alqalaf Adel Alnasser Daij Alfahad Engineering meeting with Home Owner Association Adel Alnasser Daij Alfahad Engineering Policies and Regulations Research Hamad Alqalaf Adel Alnasser Engineering Data Collection Hamad Alqalaf Daij Alfahad Technician Topographic Map Hamad Alqalaf Adel Alnasser Daij Alfahad Technician Existing Infrastructures Analysis Hamad Alqalaf Daij Alfahad Engineering runoff analysis Adel Alnasser Daij Alfahad Engineering Soil Analysis Hamad Alqalaf Adel Alnasser Engineering Cut and Fill and Compaction. Adel Alnasser Daij Alfahad Engineering Hamad Alqalaf 13

Cost of The Project Continued TasksStaffClassificationRate ($/hr)HoursCost Estimate($) 6.1 Open Channel Design Hamad Alqalaf Daij Alfahad Engineering court dimensions Adel AlnasserTechnician court surface material Hamad Alqalaf Adel Alnasser Daij Alfahad Technician Purchasing Equipment Hamad Alqalaf Adel Alnasser Daij Alfahad Engineering Sidewalk and benches Adel Alnasser Engineering Fence Daij AlfahadEngineering Traffic Signage Hamad AlqalafTechnician Traffic Striping Daij AlfahadTechnician Design Report Hamad Alqalaf Adel Alnasser Daij Alfahad Engineering Presentation Hamad Alqalaf Adel Alnasser Daij Alfahad Engineering Website Daij AlfahadTechnician Total 429$ Hamad Alqalaf 14

Project Summary  Full Basketball Court Design  Maintaining The Existing Detention Basin  10 Main Tasks  Total Cost of $29175 for 429 Hours of Engineering and Technician Work Hamad Alqalaf 15

References [1] CIVIL AND ENVIRONMENTAL ENGINEERING DIRECTORY. N.d. Photograph. Flagstaff. Web. 13 Apr [2] NAU'S FUNHOUSE OF TRAFFIC TOYS Photograph. Flagstaff. Web. 13 Apr < 16

Questions? 17