a vision for the future at princeton junction presented by InterCap Holdings West Windsor Redevelopment May 31, 2008
InterCap HoldingsWest Windsor Redevelopment introduction why we are here who we are InterCap Holdings Looney Ricks Kiss Architects Eng-Wong, Taub & Associates TischlerBise Bank of America
InterCap HoldingsWest Windsor Redevelopment what West Windsor wants relieve traffic congestion – Vaughn Drive connector 1,000 additional parking for WW residents create our very own main street a central meeting place uniquely our own no increase in taxes as a result of redevelopment
InterCap HoldingsWest Windsor Redevelopment imagine…… our very own main street
InterCap HoldingsWest Windsor Redevelopment arriving at the station… …should be a welcoming experience
InterCap HoldingsWest Windsor Redevelopment stepping off the train… Image #2: Platform, people unloading train
InterCap HoldingsWest Windsor Redevelopment and descend into a sea of parking
InterCap HoldingsWest Windsor Redevelopment moving the farmers’ market from a parking lot… …into a great place
InterCap HoldingsWest Windsor Redevelopment …back to reality
InterCap HoldingsWest Windsor Redevelopment … from “gasoline alley” to “restaurant row”
InterCap HoldingsWest Windsor Redevelopment parking lot transformed into public space
InterCap HoldingsWest Windsor Redevelopment creating a new town center
InterCap HoldingsWest Windsor Redevelopment Alexander Rd. create our main street protect our neighborhoods Berrien City what west windsor wants Vaughn Dr. Princeton-Hightstown Rd. (571) Main Street Washington Rd. Sherbrook Estates
InterCap HoldingsWest Windsor Redevelopment relieve traffic congestionincreasing WW resident parking Alexander Rd. vaughn drive connector Berrien City Vaughn Dr. Princeton-Hightstown Rd. (571) ParkingParking StationStation Washington Rd. Main Street Sherbrook Estates
InterCap HoldingsWest Windsor Redevelopment Alexander Rd. Berrien City create a community gathering place surrounded by a balanced mix of uses Washington Rd. Vaughn Dr. Princeton-Hightstown Rd. (571) ParkingParking Mixed Use Main Street StationStation Sherbrook Estates
InterCap HoldingsWest Windsor Redevelopment aerial of “main street” Train Station Alexander Rd. Princeton-Hightstown Rd. (571) ACME PNCBank Cranbury Rd. Power Substation Wallace Rd. Sherbrooke Dr.
InterCap HoldingsWest Windsor Redevelopment existing “drive-thru” condition
InterCap HoldingsWest Windsor Redevelopment existing “drive-thru” condition
InterCap HoldingsWest Windsor Redevelopment existing “drive-thru” condition
InterCap HoldingsWest Windsor Redevelopment existing “drive-thru” condition
InterCap HoldingsWest Windsor Redevelopment restaurants, cafés & shopping
InterCap HoldingsWest Windsor Redevelopment local merchants - “mom & pop” stores
InterCap HoldingsWest Windsor Redevelopment a place to “bump into” friends & neighbors
InterCap HoldingsWest Windsor Redevelopment a main street defined by “anchors” at each endconnect anchors with a main street in between Train Station Alexander Rd. Cranbury Rd. ACME PNC Bank Power Substation Wallace Rd. Sherbrooke Dr. Schlumberger
InterCap HoldingsWest Windsor Redevelopment first steps are underway along main street Cranbury Rd Wallace Rd Power Substation School Bus Yard School Bus Yard PNC Bank
InterCap HoldingsWest Windsor Redevelopment transform intersection at exposed power substationestablish landmark gateway Cranbury Rd Wallace Rd Power Substation School Bus Yard School Bus Yard PNC Bank
InterCap HoldingsWest Windsor Redevelopment transform intersection at exposed power substationestablish landmark gateway
InterCap HoldingsWest Windsor Redevelopment redevelop Acme shopping center into a “place” Alexander Rd Sherbrooke Rd ACME
InterCap HoldingsWest Windsor Redevelopment redevelop outdated Acme shopping center… into a place for everyone & all your needs
InterCap HoldingsWest Windsor Redevelopment transformations along main street Coldwell Banker Sun Bank
InterCap HoldingsWest Windsor Redevelopment …into our community’s Main Streettransforming a county road corridor…