Management/Administration of a Performance Based Contract.

Slides:



Advertisements
Similar presentations
Project Procurement Management
Advertisements

Effective Contract Management Planning
Procurement Management
Office of Management and Budget Awarding Contracts to Achieve Results Performance-Based Acquisition (PBA) Julia Wise, OMB, OFPP.
2 Breakout Session # 1411 Robert F. Watts, Senior Consultant, ESI International Date: April 16 Time: 2:40 – 3:40 PM Buying Results Through Service Level.
Chapter 12: Project Procurement Management
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Project Management Basics
Core Performance Measures FY 2015
Legal & Administrative Oversight of NGOs Establishing and Monitoring Performance Standards.
NASA Johnson Space Center Contracting Officer and Contracting Officer’s Technical Representative.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Guiding principles for the Federal acquisition system
Contract Management Sub-Regional Caribbean Public Procurement Conference The Importance of Contract Management Port of Spain, Trinidad June 22, 2014 Sabine.
1 Department of Education Race to the Top Assessment Program Procurement Strategy Discussion Dr. Allan V. Burman President Jefferson Solutions
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 11 Procurement Management Embedding value into the.
Core Performance Measures FY 2005
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
Lyle Eesley Defense Acquisition University Director
Performance Based Service Acquisition (PBSA) Treasury Industry Day July 20, 2005 Patty Hoover IRS Office of Procurement Policy Naomi Marechal TE/GE BSP.
Donald R. Rainey, Sr., CPPB/VCO Director, Office of General Services Virginia Department of Social Services.
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
Contract Administration Stacy Sassman Purchasing Agent Iowa State University Cory Harms Associate Director of Purchasing Iowa State University.
Managing Project Through Information System.  Monitoring is collecting, recording, and reporting information concerning any and all aspects of project.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
IT Requirements Management Balancing Needs and Expectations.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
PERT Overview Federal Perspective Annual PERT Workshop February 7-9, 2012 Nevada Site Office Evelyn Landini, Contracting Officer Brookhaven Site Office.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
Project Management Processes for a Project
Copyright 2009  Understand the importance of project procurement management and the increasing use of outsourcing for information technology projects.
1 TenStep Project Management Process ™ PM00.9 PM00.9 Project Management Preparation for Success * Manage Quality *
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Chapter 11: Project Procurement Management
Click on Next to continue Next Introductio n Inputs Tools and Techniques Outputs The process of managing procurement relationships, monitoring contract.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
Kathy Corbiere Service Delivery and Performance Commission
Project Management Basics
MARINE CORPS INSTALLATIONS EAST CONTRACTING DIVISION DEFINING REQUIREMENTS.
Project Management Processes for a Project
CLOSE PROJECT OR PHASE CLOSING PROCESS GROUP PROJECT INTEGRATION MANAGEMENT.
Quality Assurance. Define Quality (product & service) Exceeds the requirements of the customer. General excellence of standard or level. A product which.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
IT PROJECT MANAGEMENT B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
The Project Management Process Groups
1 Statements of Work – Getting Them Right!!. 2 Today’s Agenda A.The Basics B. Sources of Information C. Scenario #1: Procurement is in the loop D. Scenario.
Agenda  Purpose  Processes  Deliverables  Executing Activities 4.3.
Post Award Peer Review Briefing Slides
CONTRACT ADMINISTRATION
12.3 Control Procurements The process of managing procurement relationships, monitoring contract performance and making changes or corrections as needed.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Project Management Managing Project Execution
TechStambha PMP Certification Training
Controlling Measuring Quality of Patient Care
Federal Acquisition Service
Project Management Process Groups
SADC PPP Network PPPs in SADC
Post Award Peer Review Briefing Slides
Presentation transcript:

Management/Administration of a Performance Based Contract

2 Susan Thibodeaux Asst General Manager/Contract Administration Manager IAP Worldwide Services Session #1, 12:05pm-12:35pm ET NCMA’s 1 st Performance-Based Service Acquisition Community of Practice - Virtual Conference Wednesday, March 31, :00pm - 4:00pm ET Management/Administration of a Performance Based Contract

3 Brief Refresher – Performance Based Contracting What – a method of contracting where the results are defined rather than the process. –Includes measurements –Incentives Why – FAR Policy. (a) Performance-based acquisition (see Subpart 37.6) is the preferred method for acquiring services (Public Law , section 821). Subpart 37.6

4 PBC Refresher cont. Benefits –Better performance Results oriented –Better price Best and commercial practices and less mandated “how to’s” reduces costs –Contractor has flexibility and incentive to be innovative Contractor motivated to save money

5 FAR FAR and –Ensure that performance-based contracting used to the maximum extent practicable. –Use contract types that best fits the work and likely to motivate contractors. –Use positive or negative performance incentives to the maximum extent practicable. –Quality assurance surveillance plan shall contain measurable inspection and acceptance criteria corresponding to the performance standards of the SOW.

6 Refresher cont. Key Elements –PWS or SOO What, where, when, how many Not HOW! –Performance Standards –Quality Assurance Plan –Metrics –Incentives/penalties

7 Key Elements of a PWS A statement of the required services in terms of outcome A measurable performance standard for each outcome An Acceptable Quality Level (AQL) for each outcome. The PWS draws its information from the Work Breakdown Structure (WBS) PWS is written concurrently with the Quality Assurance Surveillance Plan (QASP)

8 Results orientation The standards of measurement are results- oriented: –quality of work or product –quantity of work or product –accessibility –timeliness –accuracy –customer satisfaction –not unduly burdensome.

9 Example Provide taxi service Old type SOW: drive to passenger pickup, pull over to curb, put vehicle in park, wait for passenger, open door, drive to destination. New PWS: pickup passengers on time – better > pickup passengers within five minutes of an agreed upon time Standard could be 95% on time (within the five minutes) Metrics would be percentage of pickups that comply with the standard (or the percent that don’t) Failure to perform within the standard would result in a contract price reduction.

10 Performance Standards According to the GAO, its important “…that standards are not set so high that they could drive up the cost of service or too low that they may act as a disincentive to good contract performance.”

11 Metrics – more later Performance indicators and standards –Collect, track, and share data –Conduct surveillance systemically –Document results –Review periodically and jointly with the contractor “Are we measuring the right things?”

12 Plans used in PBSC Mgt Quality assurance surveillance plans (QASP) –Details how and when the Government will survey, observe, test, sample, evaluate, and document contractor performance according to the Performance Work Statement (PWS). Performance requirements summaries (PRS) –Reflect the relationship of the PWS and QASP –Details each critical task, the performance standard, the Acceptable Quality Level (AQL), the surveillance method, and the incentives/disincentives in an easy to use matrix format. Acceptable quality levels (AQL) –A quality standard that allows a prespecified number of defects –Worst case quality level

13 QASP Quality Assurance and Surveillance Plan – Government's QASP and the contractor's Quality Control Plan work together to ensure project performance standards are met. Is the primary contract administration tool –directly corresponds to a contract’s specified performance standards, –is used to measure contractor performance –ensures that the Government receives the quality of services called for under the contract and –pays only for the acceptable level of services received. –Living document

14 QASP A good QASP includes: –measurable inspections –acceptance criteria –Surveillance schedule –Surveillance method –corresponds to the performance standards of the SOW –Documentation and records requirements

15 QASP cont. A NASA study found that many service contracts were missing QASPs. QASPs apply even if it’s a(n): Award fee contract Research & Development (R&D) contracts Contract where the services are performed off-site Small dollar value contract Contract with a small business contractor Contract where the contractor has an established internal quality control plan

16 Quality Assurance Surveillance Plans  According to the GAO: “The plan should focus on the quality, quantity, and timeliness of the performance outputs to be delivered by the contractor, among other things, and not on the steps required or methods used to produce the service.”

17 Using the QASP Meet with all concerned parties on a regular basis to address issues Track performance and assess progress against the QASP Address performance risks or deficiencies early Update the CMP as necessary Update the QASP as substantive changes to the contract requirements, performance, or contract surveillance approaches occur.

18 Surveillance Methods Measure the outputs not the method 100 % inspection –Only when risk to life, safety or health Periodic inspection –Requires planning Random sampling –Used for production or recurring requirements Customer feedback –Random –Surveys Contractor self-reporting

19 Incentives Use to force compliance with standard or encourage better performance Can be positive or negative (or both) Use incentives for priority/important tasks –Should be challenging but achievable

20 Incentives cont. Must be defined in solicitation/contract Incentives can be monetary or non- monetary Deducts should be somewhat equivalent to value of task or value of the output There must be specific formulas for calculating payment due for deductions

21 Contract Management Starts early Begins during the acquisition planning phase –Recognizes the performance-based elements of the contract –The Contract Management Plan is in place before or shortly after the time of award –Takes a team Contract Specialist Program Manager/technical representative Representative from the customer Contractor

22 Contracting Officer’s Role Ensures performance of all necessary actions for effective contracting (FAR Part 42), Ensures compliance with contract terms Safeguards the interests of the contractual relationships – Govt customer – Contractor Accepts deliverables Monitors performance Enforces the Government’s rights when necessary

23 Contracting Officer’s role cont. Modify contracts. Assist in monitoring contractor performance. Claims and REAs Disputes and litigation, Partnering agreements and MOUs Records management Process invoices – provide funding as required Process deductions Terminate contract if necessary

24 Contracting’s role  KO is responsible for receiving the contract performance reports, approving changes to the contract, and generally ensuring that the contract requirements are being met  The KO relies on subject matter experts for advice  Technical, legal, financial, etc  The KO is responsible for enforcing the terms of the contract and requesting corrective action as necessary Manage the contract not the people or the process

25 Contracting Officer’s Technical Representative (COTR) Must be competent and familiar with technical requirements Monitor contractor performance Must be detailed –Record keeping Complete and accurate Use the contract as the base Track deliverables Professional working relationship with the contractor KNOW the contract! –Build checklist for monitoring performance Per inspection and acceptance guidelines in contract

26 After contract award Post Award Meeting –Meet with the contractor –Stakeholders Review –Requirements –Communications –Deliverables –Performance monitoring/QASP –Partnering –Incentives/penalties

27 Contractor’s role Adhere to contract's terms and conditions Establish Quality Plan –Measurements and metrics Monitor and measure performance –Documentation –Process improvements Communications with team members –Open and honest –Suggestions "to deliver on a timely basis the best value product or service to the customer”

28 Documentation Inspection/surveillance results –Detailed notes and records Minutes of meetings Formal working agreements Joint processes Informal agreements – capture in writing

29 The New Paradigm FAR 1.102(c) provides: The Acquisition Team consists of all participants in Government acquisition including not only representatives of the technical, supply, and procurement communities but also the customers they serve, and the contractors who provide the products and services.

30 PBSC Leads to Partnering Seven Steps To Performance Based Acquisition states “The integrated project team should plan to rely less on management by contract and more on management by relationship. At its most fundamental level, a contract is much like a marriage. It takes work by both parties throughout the life of the relationship to make it successful. “ Common characteristics of successful partnering –Trust and open communication –Strong leadership on both sides –Ongoing, honest self-assessment –Ongoing interaction –Creating and maintaining mutual benefit or value throughout the relationship

31 Partnering Meet with the contractor to identify ways to improve efficiency and reduce the effect of the "cost drivers." The contractor and government work together to identify more effective and efficient ways to measure and manage the program. Establish a Customer Process Improvement Working Group that includes contractor, program, and contracting representatives.

32 Performance reviews Performance reviews should take place regularly ALL performance should be documented, whether it is acceptable or unacceptable Contract management performance reviews, –Assessment - not for formal reporting and rebutting, –Review performance levels and metrics –Monthly or bi-monthly performance reviews –Contracts, technical, customers and contractor Require improvement plan if downward trend –Joint actions Meet more often if necessary

33 Contract Management is Vital Poor performance monitoring, sporadic quality assurance, and little effort expended into managing changes or settling disputes results in damages to both government and contractor.

34 Re-Cap Culture change Start early with planning Manage performance not process Manage the contract not the people Use the QASP Partner