1 Comparison of MIRAC-4 array with Cornell test array, both warm ver 3 Bill Hoffmann November 10, 2009 Test configuration Array: MIRAC-4 array or Cornell.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

MuTr Shielding & Grounding Preliminary 10/6/99 (G. Hart) Additions 1/4/01 (REM)
Photoshop Lab colorspace A quick and easy 26 step process for enhancing your photos.
Parameters to choose the CCD The CCD test bench *Temperature range : -55 to +40°C. *Stabilization : < 0.05°C/hour. *5 temperature probes : CCD and electronics.
Analog to Digital Converters (ADC) 2 ©Paul Godin Created April 2008.
Detector Assembly Design Pedestal Cold Strap Interface Cable SCA Motherboard Attachment Feet 51 Pin Electrical Connector Cover/Baffle Package designed.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
Astronomical Array Control & Acquisition System at NAOC Zhaowang Zhao Binxun Ye Research Labs for Astronomy National Astronomical Observatories, Chinese.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Building an APRS Weather Station for Under $300 APRS Wx station presentation by Chris, W8CWG, Mound Amateur Radio Association 3 Dec 2014.
Power System Requirement is to develop a system that –Supplies required voltages and currents –Provide PS housekeeping measurements –Very low noise Present.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Chapter 5: Signals and Noise
AccuMax Multi-Point Injection Mechanics
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
ZTF Interconnecting Scheme Stephen Kaye
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
Mark Raymond /10/051 Trip-t testing brief status report test setup description - hardware and software some very early results.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
Siemens Power Generation, Instrumentation &Controls
TL70 The Choice is Yours: You choose how to order and build the TL70 with the flexibility to customize the tower light as needed and change positions in.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
TS 1.1 Basic Digital Troubleshooting 1 ©Paul Godin Updated August 2013 gmail.com.
Chicago Meeting, /8/2015K.-H. Sulanke, DESY1 Digital Camera Trigger Status May 2013 K.-H. Sulanke DESY.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Single Board Controller Comments Roger Smith Caltech
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
Drawings. The Drawing Set Design Drawings System Block Diagram Circuit Design Sketch Packaging Plan Working Schematic Breadboard Drawing PC Board Design.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
Todd Moore for the DES CollaborationNov 28, Noise test hardware & software setup. Earth grounding scheme utilized for noise tests. Block diagram.
PAD MONITOR The TPC pad monitor is used to check the performance of the TPC electronics. It can display the amplitude vs time bucket histogram for all.
THE PYTHAGOREAN THEOREM AND THE PYTHAGOREAN ABACUS END Click or scroll down to begin.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Grounding Guidelines Developed for LBNE
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
SITR: FORCAST February 19, 2010 Cornell University Herter.
Pads Assembly- Zamiatin Si Detector – ELMA/Dubna/MSU Interface Board – dubna/baskagiv Carrier Board -dubna/baskagiv Pre-Amp –sleniov(analog) Basilev-dubna.
ZTF Interconnecting Scheme Stephen Kaye
CUSTOMER ORDERING QUICK REFERENCE GUIDE December 21, 2015.
Mixing Complementary Colors to create neutrals. Complementary colors are directly across from one another on the color wheel. When mixed they get various.
Single Board Controller Comments Roger Smith Caltech
Lecture 3 Sorting and Selection. Comparison Sort.
Differential Signal Path for 64 ch ZTF Mosaic Roger Smith and Stephen Kaye California Institute of Technology.
Digital Image: Rendering of a continuously varying scene with a finite array of picture elements, where each one has a discrete intensity or color 39.
ClearOne ® Beamforming Microphone Array 06/01/2012.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
35T Phase 1 and the PrMs AHahn PAB Meeting, 4/9/14 1.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
Discovering Computers Fundamentals, 2011 Edition Living in a Digital World.
ZTF Grounding or Yes, there are two paths you can go by
Gayle K. Martin November 14, 2016
Chapter 5: Signals and Noise
ILC LLRF Status Ruben Carcagno, Brian Chase
Development of the DC Electronics for the TAMUTRAP RFQ Cooler/Buncher Louis Cooper Cyclotron Institute Texas A&M University.
AQT90 FLEX Service Training
Navigation bar runs along top in this version, with drop-down menus similar to that of the Civil Eng. site. Current background image for the header is.
SK2 Channel Modulation Contributes to Compartment-Specific Dendritic Plasticity in Cerebellar Purkinje Cells  Gen Ohtsuki, Claire Piochon, John P. Adelman,
Differential Signal Path for 64 ch ZTF Mosaic
Brining your RF and Digital Designs to life
Progress on the 40 MHz SEU Test System based on DE2 Board
ICARUS Internal Cryogenic Sensors
2019 Investing Now Summer Program
Presentation transcript:

1 Comparison of MIRAC-4 array with Cornell test array, both warm ver 3 Bill Hoffmann November 10, 2009 Test configuration Array: MIRAC-4 array or Cornell test array Controller: NIC electronics box with new preamp, backplane, FPGA, bias, and clocks Software: Linux version Cornell server and gui’s plus UA filter and other gui’s Power supply: Original MIRAC-4 power supply Power cable: Original MIRAC-4 long Cable from backplane to cryostat: Original MIRAC-4 cable or Cornell test cable Cable bulkhead to fanout board: Second edition MIRAC-4 cable or Cornell test cable Bulkhead connectors: Original MIRAC-4 cryostat hermetic bulkhead connectors or Cornell test connectors Fanout board: MIRAC-4 or Cornell test board Ground interconnects: Chosen by Paul Arbo for best operation Results: The Cornell test assembly gives clean images without digital pickup (flash bars). The Cornell array in the MIRAC fanout board with the Cornell cryo signal cable gives the same results. The MIRAC array in the MIRAC fanout board with the Cornell cryo signal cable has slightly more noise but no flash bars. Both the MIRAC and Cornell arrays in the MIRAC fanout board with the MIRAC cryo signal cable have flash bars. Pickup from the motor power supply is large with the MIRAC system. It is small with the Cornell warm test assembly and the same with the MIRAC or Cornell array in the MIRAC fanout board with the Cornell cryo signal cable.

2 On the following page the upper two images are for the MIRAC fanout board and MIRAC cryo signal cable. The MIRAC array is on the left and the Cornell array on the right. Both show “flash bars”. Three or so show on each image with the warm arrays. With the MIRAC system cold, these bars frequently appear all over the images. The lower images are for the Cornell cryo signal cable. The two images on the left use the MIRAC fanout board. The leftmost image is the MIRAC array and the center image the Cornell array. The image on the right is with the Cornell warm test assembly including the the Cornell fanout board. The flash bars are absent from all three images. The defects along the left and right side of the MIRAC images are debonding of the indium pads.

3 MIRAC array; MIRAC fanoutCornell array; MIRAC fanout MIRAC array; MIRAC fanout MIRAC cryo signal cable Cornell cryo signal cable Cornell array; MIRAC fanoutCornell array; Cornell fanout

4 The top table is with the MIRAC fanout board and various combinations of warm and cryogenic cables, fanout board mounting hardware, array, and motor power supply off and on. The lower table is for the Cornell warm test cable and array test assembly.

5 The red lines for the Cornell warm assembly and fanout board. The dashed line is for the motor power on. This is our baseline for no “flash bars” and minimum motor power pickup. The blue lines are for the MIRAC fanout board. Significant reduction in motor power pickup occurs with isolating the array cold finger from ground and using the Cornell cryo signal cable. These have little effect on the motor-off standard deviation. But with the MIRAC cryo signal cable both the MIRAC and Cornell arrays show flash bars. These are eliminated with the Cornell cryo signal cable. The filled orange triangles are the Cornell array in the MIRAC fanout board. The Cornell array has slightly lower noise in either the Cornell or MIRAC fanout board than the MIRAC array.