Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015
Outer conductor halves –4 halves in QA 2 Double Quarter-Wave
3 “Top cake pans” –2 in QA Double Quarter-Wave
4 “Bottom cake pans” –2 in QA
Double Quarter-Wave 5 Cake pan assemblies
6 “Bowls” –Complete –Ready for NbTi tuner attachment welds Double Quarter-Wave
7 “Cake pan & bowl” stackup Double Quarter-Wave
8 Outer conductor halves –4 in QA RF Dipole
9 Small HOM Box Side Port –2 in QA (4 halves)
10 End cap: Niobium stamping in progress RF Dipole
11 FPC & HOM Box Port Halves Waiting for finalization of end cap prototype RF Dipole—copper prototypes
12 Bowl: Machined copper for stackup RF Dipole—copper prototypes
13 Stiffener: Machined for stackup RF Dipole—copper prototypes
14 Bowl Stiffener Outer Conductor