Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Progress and Plan for Superconducting RF Cavity RF Group.
Page 1 Thinning of stamped End cap 1.The measurement from Niowave shows the corners of FPC and H-HOM openings are thinned and its thinnest area is 2.2mm.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
th Gentner Day 2013 BE-RF-LRF HOM Couplers for CERN SPL Cavities Comparison of different design approaches K. Papke, F. Gerigk, U. van Rienen.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
RF Cavity / Coupling Coil Module
DR Vacuum Component Overview April 25, 2012 Joe Conway.
Page 1 Jean Delayen HyeKyoung Park Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
RHIC 56 MHz HOM Damper Fundamental Damper Fundamental Power Coupler Pick-ups S. Bellavia January 19 th, 2010.
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
High pure Niobium Industrialisation, Alternative Production Ways, and Strategic Cooperation.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
Fabrication Update – The Frame Awakens Matt Hoff LBNL April 2,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Thermal Shield Update Niklas Templeton 15/02/16 (final update of placement  )
Page 1 Jean Delayen Center for Accelerator Science Old Dominion University RF Dipole Cavity Design and Plans LARP Review Fermilab, 10 June 2013.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
RF Modeling of the LHC Crab Cavity Zenghai Li SLAC Zenghai Li LARP CM20 April 8-10, 2013.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
ICFA Workshop on High Order Modes in Superconducting Cavities July First Experience with an HOM Coupler for the 56 MHz Quarter Wave SRF Cavity Qiong.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SRF Advances for ATLAS and Other 
RFD Cavity Frequency Fix Plan HyeKyoung Park SRF Engineering, Jefferson Lab 06/23/2016.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
CERN – Zanon discussions
Frequency Sensitivity to Dimensions
Crab Cavities Contribution from the U.S.
Crab – RFD prototype: Production Status Update
Technical Issues Facing in the FRIB Cryomodule
Fabrication of Nb and Cu SPL cavities and required tools CERN status
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
Crab Cavity Manufacturing Readiness Meeting
Cavity + He Vessel interface
RF-Dipole Cavity Update
Superconducting RF Crab Cavities
HIE-LINAC status report
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
Fabrication of KEK-ATF2 Q-BPM
Crab – RFD prototype: Fabrication Status Update
JLEIC SRF update SRF team
SNS PPU Cryomodule Design Overview
HWR and Test Cryomodule for China ADS
Presentation transcript:

Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015

Outer conductor halves –4 halves in QA 2 Double Quarter-Wave

3 “Top cake pans” –2 in QA Double Quarter-Wave

4 “Bottom cake pans” –2 in QA

Double Quarter-Wave 5 Cake pan assemblies

6 “Bowls” –Complete –Ready for NbTi tuner attachment welds Double Quarter-Wave

7 “Cake pan & bowl” stackup Double Quarter-Wave

8 Outer conductor halves –4 in QA RF Dipole

9 Small HOM Box Side Port –2 in QA (4 halves)

10 End cap: Niobium stamping in progress RF Dipole

11 FPC & HOM Box Port Halves Waiting for finalization of end cap prototype RF Dipole—copper prototypes

12 Bowl: Machined copper for stackup RF Dipole—copper prototypes

13 Stiffener: Machined for stackup RF Dipole—copper prototypes

14 Bowl Stiffener Outer Conductor