Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)1 First Stage Cryogenic IF Amplifier Carmen Diez.

Slides:



Advertisements
Similar presentations
The ALMA Front End John C. Webber National Radio Astronomy Observatory, Charlottesville VA 22903, USA.
Advertisements

Participants: C-1:Cryogenic last-stage suspensions (interferometers) (F.Ricci-G.Frossati) Objectives: -Design new suspension elements for the last stage.
Design of a Low-Noise 24 GHz Receiver Using MMICs Eric Tollefson, Rose-Hulman Institute of Technology Advisor: Dr. L. Wilson Pearson.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered
Differential Amplifiers
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
W. Aalders FPU CDR 1-3 July 2003 HIFI 1 FPU CDR MCS HIFI MECHANISMS 1.Focal Plane Chopper (FPC) 2.Diplexer Rooftop Mirror Translator (DRT) 3.Pivot development.
Development of the IF2 Chain for the FPU of the HIFI Instrument Alexander Megej July 1 st, 2003, Groningen.
VLSI Digital System Design
HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.
Antenna, Feed, and LNA Integration S. Weinreb, May 7, 2009, LAX Antenna Working Group Meeting 1.Issues 2.Feed Summary 3.LNA Summary 4.Differential LNA’s.
IF1 CDR 9/12/031 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) IF-1 high (4-8 GHz) design and DM results Carmen Diez, Isaac López-Fernández,
Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID1 Cryogenic Amplifiers for the Band 7 and Band 9 Cartridges Juan Daniel.
1 Research Objectives Develop non-contact, non-destructive, low cost, fast, accurate, high resolution and automated system for evaluating quality of solder.
Technical Interests on the SKA Noriyuki Kawaguchi National Astronomical Observatory of Japan SKA Workshop November 5, 2010.
© 2015 Desco Industries Inc. StaticControl.com ESD Control Experts HBM vs. CDM vs. CBE What is the difference?
B. BOUDJELIDA1 UMan LNA Programme 4 th SKADS Workshop, Lisbon, 2-3 October 2008 University of Manchester: Progress on LNA Programme B. Boudjelida, A. Sobih,
High Electron Mobility Transistors (HEMT)
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
RPG Radiometer Physics GmbH Japan Met. Agency – Tsukuba / Japan, Nov./Dec RPG RPG founded in 1973 Specialized in the design and fabri- cation of.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Microwave Engineering, 3rd Edition by David M. Pozar
Astronomical Telescopes and Instrumentation (SPIE) 8/28/021 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) Wide band, ultra low noise.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
From Research Prototype to Production
Power Semiconductor Devices for Low-Temperature Environments - II Space Power Workshop April 2005, Manhattan Beach, California.
Observatorio Astronómico Nacional Instituto Geográfico Nacional ALMA CAY 05/03/2003IGN (Madrid)1 Development of IF Amplifiers for ALMA Isaac López-Fernández.
RTAX-S Qualification and Reliability Data September 7-9, MAPLD International Conference Minal Sawant Ravi Pragasam Solomon Wolday Ken O’Neill.
Introduction to Design. Five Stage Electronic Design and Fabrication Process Design Stage Drawing Stage Experimentation Prototyping Stage Testing / Troubleshooting.
Fluctuations and Noise (SPIE) 5/28/041 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) Experimental results of gain fluctuations and.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
Sanae Boulay, Limelette, Nov 05 th 20091/20 S. Boulay, B. Boudjelida, A. Sharzad, N. Ahmad, M. Missous Novel Ultra Low Noise Amplifiers based on InGaAs/InAlAs.
Calorimeter upgrade meeting – Phone Conference– May 5 th 2010 First prototyping run Upgrade of the front end electronics of the LHCb calorimeter.
UG-crate status AMS TIM - CERN - 15/4/2008 A.Bartoloni, B.Borgia, F.R.Spada* INFN Roma.
5th Engineering Forum Workshop (Cagliari 13/05/ 11)1 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) Gain Fluctuations of Cryogenic.
Amplifiers Amplifier Parameters Gain = Po/Pi in dB = 10 log (Po/Pi)
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
Groningen, 1-2 February 2001 FPU Preliminary Design Review1 First Stage Cryogenic IF Amplifier Centro Astronómico de Yebes Observatorio Astronómico Nacional.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
Leiden, 3 June 2002Consortium Meeting1 First Stage Cryogenic Amplifier IF1 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN.
Update on FMS Repair STAR Management Meeting: Oct Stephen Trentalange.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
3-Stage Low Noise Amplifier Design at 12Ghz
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 24/02/2003SRON (Groningen)1 Development of IF Amplifiers for ALMA Isaac López-Fernández.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
A 3-V Fully Differential Distributed Limiting Driver for 40 Gb/s Optical Transmission Systems D.S. McPherson, F. Pera, M. Tazlauanu, S.P. Voinigescu Quake.
GWADW2011 Elba/Italy, 23/May/2011 N. KIMURA and Y. SAKAKIBARA Present Design of LCGT Cryogenic Payload - Status of Cryogenic Design - N. KIMURA*, Y. SAKAKIBARA**,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Integrated Circuits.
Development of the pellet target in ITEP
STFC Contributions to the FCC Study
The 11T cryo-assembly: summary of design and integration aspects
First Stage Cryogenic IF Amplifier
First Stage Cryogenic IF Amplifier
GLAST Large Area Telescope:
Low-Noise Wide-Band Cooled amplifiers with InP Transistors
Performance of the Band 3 ( GHz) receiver for ALMA
Presentation transcript:

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)1 First Stage Cryogenic IF Amplifier Carmen Diez

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)2 OUTLINE DM Program (Yebes) –Amplifiers (4-8 GHz) –Isolators –Isolator-Cable-Amplifier QM & FM Programs (Transfer to Industry) –First Prototype (4-8 GHz) Qualification Program –Qualification Boards –EMC, ESD, Radiation, Bake-out Programmatic/financial concerns Planning Open Issues & Summary

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)3 HIFI YCF 6004 m=65 g 58 x 32 x 15 mm

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)4 HIFI YCF 6000 (Noise and Gain)

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)5 HIFI YCF 6000 (I/O Reflection)

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)6 HIFI YCF 6000 (Gain Stability)

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)7 HIFI YCF 6000 (Results)

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)8 Isolators: Measurements

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)9 Isolators: P erformance

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)10 Isolators 14 K (PAMTECH gives 77 K) Good agreement between measurement and estimation of isolator noise Mean contribution 1.1 – 1.4 K Isolators

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)11 QM & FM PROGRAMS (First Prototype)

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)12 QM & FM PROGRAMS (First Prototype)

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)13 QUALIFICATION PROGRAM (Boards) Resistors, Capacitors and Transistors glued Resistors and Capacitors soldered Capacitors glued

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)14 QUALIFICATION PROGRAM EMC: Bias circuit already set ESD: “ESD Tests on InP HEMT Transistors” Yebes/FPSS/TN/ Radiation: Tests carried out successfully Bake-out: Vacuum pre-qualification bake-out held (3 days at 83ºC). No influence found in the IF1 unit calibration

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)15 PROGRAMMATIC/FINANCIAL CONCERNS 1 Contract signed: 2 QMs (Qual) (4-8 GHz) 2 QMs (Accep) (4-8 GHz) 7 FMs (4-8 GHz) 2 Contracts to be signed: 2 DMs ( GHz) 4 FMs ( GHz) 3 FMs (4-8 GHz) Funding for year 2003 has been approved but only about 1/3 of it has been delivered !!! 5 FSs (4-8 GHz) 2 FSs ( GHz)

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)16 CRYO IF1 (4-8 GHz) AMPLIFIER-HIFI PLANNING

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)17 OPEN ISSUES & SUMMARY Qualification Boards to be repaired and qualified IF1 CDR to be held Structures, Substrates and Components (with the exception of the 18nF capacitors) prepared for the fabrication of the QM units QM Isolators to be delivered by PamTech Isolator position to be defined Environmental tests to be defined completely IF1 low ( GHz) prototype to be fabricated and the design transferred to the industry A new contract with industry to be signed

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)18 OPEN ISSUES & SUMMARY (Cont.) Isolator Specification to be prepared BA CNIG-SRON for the QMs, FMs and FSs to be prepared and signed

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)19

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)20 PA/QA (Qualification) Performance tests at 15K 25 cryogenic cycling between RT and 15K 5 warm cycling between RT and 80ºC 144 hrs. extended bake-out at 80ºC Vibration (sine/random) at 77K 25 cryogenic cycling between RT and 15K Performance tests at 15K

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)21 PA/QA (Acceptance) Performance tests at 15K 3 cryogenic cycling between RT and 15K Vibration (sine/random) at RT Performance tests at 15K

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)22 Industry: ALCATEL Clean room for assembly Cryostat (property of OAN) for measurements Specialized in production for space (strict QA) Experience with HERSCHEL amplifiers

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)23 Industry: TTI Bonding machine Experience in cryostats Complete receiver with S/X cryogenic amplifiers delivered to Finland GHz with Fujitsu devices (20  h  k)

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)24 Microwave Capacitors at Cryogenic Temperature

Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)25 TRW T-42 CRYO3  200×0.1 μm gate  Best performance TRW T-45 CRYO4  200×0.1 μm gate  Used in DMs  Space qualifiable, to be used in FMs  CHOP developed ETH T-35  200×0.2 μm gate  Experimental transistor  Design by request  Used in MPAs 0.22 mm 0.19 mm Transistors