RHIC CRYOGENICS SYSTEM Time meeting 1-28-2014 1/28/20141TIME MEETING RUN 14 –CRYOGENIC.

Slides:



Advertisements
Similar presentations
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
R. Than J. Huang P. Orfin T. Tallerico Jan. 19, 2011
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
S A Griffiths CM42 June 2015 Electrical & Control.
Teleconf ACS – FREIA 28th March 2017
S1G Experiment Schedule Plan
CERN – Zanon discussions
IT-4189 Supply and installation of a cryogenic distribution system
Leak Detection Tutorial Work
SPS cryogenic proximity equipment and SM18 validation
S1-G cryomodule assembly status
Teleconference ACS – FREIA 31st October 2017
XFEL Vacuum System Commissioning
Status of the cryogenic system for B180
MON TUE WED THU
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Jan Sun Mon Tue Wed Thu Fri Sat
2008 Calendar.
Sun Mon Tue Wed Thu Fri Sat
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
Sun Mon Tue Wed Thu Fri Sat
Double-Spoke Cavities
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
SNS PPU Cryomodule Instrumentation
SC1R Cold Box PDR Assembly Sequence
2008 Calendar.
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC

STATUS RHIC COOLDOWN IP10: E-LENS IP4: 56MHZ IP2: CeC AGS COLD SNAKE 1/28/20142 TIME MEETING RUN 14 –CRYOGENIC S

RHIC: COOLDOWN 1/28/20143

RHIC: 50K WAVE 1/21/20144

5 RHIC: HEAT SHIELD

Liquid helium delivery 1 st Tanker Liquid helium delivered 2 nd Tanker Thursday Jan 23 delivered 3 rd Tanker Jan 29/30 4 th Tanker Feb 4 1/28/2014TIME MEETING RUN 14 –CRYOGENICS6

AGS COLD SNAKE Cryocooler coldhead tests – Since the coldhead sleeveS is mounted in the cryostat : Tested all coldheads in separate new coldhead pressure boundary sleeve for our new spare coldhead – 1.5 W at 4.2K – 3 coldheads passed – 1 cold head performing at about 0.5W – new spare coldhead 1/28/20147TIME MEETING RUN 14 –CRYOGENICS

IP10 E-LENS: RECAP SUMMER SHUTDOWN – FIELD UNIFORMITY MEASUREMENTS, TEST BOTH SOLENOIDS ON DEWARS – BLUE RECONFIGURATION 180°FLIP PRESSURE TESTED STATUS: COOLDOWN: 50K WAVE COOLDOWN FEB 4: WITH RHIC 4K WAVE 1/28/2014TIME MEETING RUN 14 –CRYOGENICS8

IP10 E-LENS 1/28/20149

IP10 E-LENS 1/28/2014TIME MEETING RUN 14 –CRYOGENIC S10

IP10 E-LENS 1/28/2014TIME MEETING RUN 14 –CRYOGENICS11

IP-2 CeC: PHASE 1 WARM PIPING & compressor – To and from small recovery compressor complete. Cryo Lines field joints – Cryo lines RIGGED IN PLACE – Welding will continue depending on availability Return line heater assembly from phase separator – To be sent out for RFQ 1/28/2014TIME MEETING RUN 14 –CRYOGENICS12

IP-2 CeC 1/28/2014TIME MEETING RUN 14 –CRYOGENICS13

IP-4: 56MHZ SYSTEM Mon 27: Cryo: Interface stack rigged in Survey: 56 mHz cryomodule Tues 28: – Cryo: Field joints and setup Interface stack. – Cryo: Final cable trays install with Genie Boom – Elec: Feedthru opening for cable compressor room – Vacuum: Cleanroom: tie-in Ion pump (IP-side) to gate valve 56MHz Wed 29: Cryo: Con’t Field joint Cryo jumper, process lines. Final cable trays install with Genie Boom wiring /termination con’t UPS Install Vacuum: Cleanroom: tie-in Ion pump (DX- side) Thu 30 Cryo: Con’t Field joint Cryo jumper, process lines. Cryo: Con’t wiring /termination/checkout RF: Start cavity conditioning Vacuum: AC Dipoles install Fri 31 Cryo: Con’t Field joint Cryo jumper, process lines. Cryo: Con’t wiring /termination/checkout Vacuum: AC Dipoles install Safety Walk-thru #1 RF: Cavity conditioning (nights) Sat 1 – Cryo: Pressure test process lines – Cryo: Mass spec Leak check – Cryo: Con’t wiring /termination/checkout – Vacuum: Beam line bake – RF: Cavity conditioning (nights) 1/28/201414

IP-4: 56MHZ SYSTEM Sun 2 Cryo: Vacuum jacket closeout Cryo: Con’t wiring /termination/checkout Vacuum: Beam line bake RF: Cavity conditioning (nights) Mon 3 Cryo: Vacuum jacket closeout Cryo: Con’t wiring /termination/checkout Vacuum: Install turbo Vacuum: Beam line bake RF: Cavity conditioning (nights) Tue 4 Cryo: Jacket Mass spec Leak check Cryo: Con’t wiring /termination/checkout Vacuum: Beam line bake RF: Cavity conditioning (nights) Wed 5 – Cryo: Con’t wiring /termination/checkout – Vacuum: Insulating vacuum pumpdown – Vacuum: Beam line bake – RF: Cavity conditioning (nights) Thu 6 – Cryo: Con’t wiring /termination/checkout – Safety Walk-thru #2 – RF: Cavity conditioning (nights) Fri 7 – Cryo: Con’t wiring /termination/checkout – Cooldown 56 cavity – RF: Cavity conditioning (nights) Sat 8 – Cooldown 56 cavity Sun 9 – Beam 1/28/201415

IP-4: 56MHZ SYSTEM 1/28/201416