HFT Safety --PXL detector September 26, 20111 Dana Beavis.

Slides:



Advertisements
Similar presentations
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Certification of Transport Medical Equipment
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
Project Overview Flemming Videbaek Brookhaven National Laboratory.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
TRANSPORT of ICARUS from LNGS to CERN Alberto Scaramelli INFN-Milano Following the meeting at LNGS on 11-12/9 Last News 102/10/2014A. Scaramelli.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
Integration Envelope inside the TPC INNER FIELD CAGE for new detectors John A. Scheblein Sr. Design Engineer STAR Technical Support Group May 16, 2008.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
Engineering Division 1 SSD Mechanics E Anderssen, H Matis, J Thomas LBNL S Bouvier, G Gouilloux Subatech.
D. Beavis (BNL) HFT Workshop March 10-11, 2009 BNL HFT Beam Pipe and Safety.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
SSD Ritter Review June 20, 2012 Conventional Systems: Cooling, Power Supplies, Cables, and all some of that stuff Jim Thomas Lawrence Berkeley National.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
HFT face-2-face F.Videbaek Brookhaven National Lab.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
HFT project Overview and Status May 11, 2010 F.Videbaek BNL 5/11/20101.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
Compressor status AWAKE Technical Board meeting 19 August 2015.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
K.Gadow CALICE technical review 1 Move to FNL ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3/B4.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Engineering Division 1 Phased Cone Proposal Eric Anderssen, LBNL.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Installation of the T600 at Fermilab CSN2, September 22,
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
201 Mhz Cavity Installation. Removing Old 201 Cavity Came in through door with fork lift Will go out through labyrinth Requires new 3 ton Gantry crane.
MNM Fatal Slip or Fall of Person (Indiana) Slip or Fall of Person (Indiana) February 26, 2004 February 26, 2004 Crushed Stone Operation Crushed.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
ELENA installation progress F. Butin / ELENA collaboration.
Safety in the Neutrino Platform Hall
CBETA Technical Review
Linac 4 Faraday cage P. Baudrenghien , D. Stellfeld BE/RF
HFT project Overview and Status March 10, 2010
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
1.3-GHz Cavity Vacuum Furnace at IB4
Polarized 3He target installation
Presentation transcript:

HFT Safety --PXL detector September 26, Dana Beavis

HFT Organization Flemming Videbaek– Project manager Mechanical Engineer– Eric Anderssen –Prepared/supervised the analysis for the IDS engineer review –Conducts or supervising essentially all detector engineering Electrical Engineer– Ciro D’Agostino –Member of Star Technical Support Group (STSG) – Has electrical techs that are EEI’s –Will document electrical installations. –Will obtain NEC training –Oversees electrical installation Dana Beavis– Safety Coordinator September 26, 20112

HFT Subsystem Managers Leo Greiner—PXL Jim Thomas – SSD Gerrit van Nieuwenhuizen—IST Dana Beavis-- Integration September 26, 20113

What is planned this summer Remove old internal support cones (STSG) Recover existing beam pipe (STSG) Assemble 4 FGT disks with 3 quadrants (FGT) Install FGT into West Support cone –FGT safety review Sept. 2, 2009 Assemble IDS (inner detector Support) (HFT) –Partially reviewed with FGT on Sept. 2, 2009 –C-AD Engineering review Conducted on July 15, 2011 IDS installation into STAR is essentially identical to the old cones. September 26, 20114

Summer 2011 continued FGT and IDS parts onto SVT platform with manlift Total weight of all parts is about 100 pounds Bolt IDS parts together on SVT rails No critical lifts this year At some future date lifting the assembled IDS with detectors will become either a critical lift or a pre- engineered lift. Existing Beam pipe will be transported onto SVT platform with manlifts. May secure rollup doors while IDS “exposed” September 26, 20115

Changes from FGT review Using existing beam pipe this year –Simple beam pipe holders compatible with IDS will be designed and installed in conjunction with C-AD vacuum group. –Simple air seal between beam pipe and OSC transition –Bake out process with be the existing hot air system –Will monitor conditions of FGT during beam pipe bake out –Need to document the bake out and beam pipe holding. –Will Have Peter C. and vacuum group review all conditions for beam pipe installation Only a fraction of FGT will be installed this year September 26, 20116

Changes from FGT review Additional reviews of the electrostatics of the shroud and the inner field cage (IFC) have been conducted. More careful treatment demonstrates that when the structure of the inner field cage is taken into account the gradients are largest there and not near the shroud. The shroud is now intended to be grounded with the option to be put at a potential. September 26, 20117

Safety items Discussed ASE with Ray Karol. He agrees that the term silicon detectors means any ignition source inside the IFC where flammable gas can pool. (see SAD 5.9.8) Need to determine if the FGT falls into this requirement. Need to determine if the change from cones to IDS has any impact on the HSSD to detect smoke. September 26, 20118

Phased Work This Fall expect to bring IST and SSD system for review by ESRC. Final review of new beam pipe. Review of any PXL installation platforms or other installation structures. Summer of 2012 will install engineering PXL Upgrade fire protection in “clean room” after discussions with fire engineer (probably HSSD) May have tented assembly area inside assembly hall Final installations in summer of September 26, 20119