Status of 1.3-GHz Cavity Vacuum Furnace at IB-4 SRF Dev. Group Meeting 27 Sept 2010.

Slides:



Advertisements
Similar presentations
ADX 150 – Engine Repair ADX 170 – Climate Controls
Advertisements

Rebuilding process for the Box Type Induction Furnace.
Power Brake Systems.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
CCAS 3381 AUTOMOTIVE SKILL I ENGINE SUBSYSTEMS. OBJECTIVES To understand the operational principles and basic mechanisms of engine sub-systems Lecture.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Systems of the Engine.
Tests of the LH2 target at GSI 2 nd -4 th april 2014 T. Hennino, C. Commeaux (IPN Orsay) T. Heinz, E. Schwab (GSI) The LH2 target.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Russ Rucinski, FNAL VLPC Cryocooler cryostat Status – June 7, 2006.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
MICE hydrogen review System modifications. Relief circuit repair During leak testing of R&D tests, the insulating vacuum would not go lower than
CYLINDER HEADS AND VALVES. 1.DEFINITION  Cylinder head is a casting that covers the top of a cylinder.
7/17/02Reyco Henning -- TRD Box S Component Testing 1 TRD Box S Solenoid Valve Testing AMS TRD Meeting, CERN, July 2002 U. Becker, G. Carosi, R. Henning,
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Polarized GaAs photo cathode development and the preparation of Gatling Gun cathodes at BNL The Single Cathode Activation Chamber.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
9-cell cavity coordination CM Ginsburg 8 Mar
GENERAL ENGINE DIAGNOSIS n Chapter 4 n Classroom Manual –Page 73 n Lab Manual –Page 77 n Tasks I-A-1 thru I-A-8 CBC AUTOMOTIVE RK.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
F Fermilab ANL/FNAL SCPF EP/HPR Processing Status and Plan Allan Rowe TD/SRFDD.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
NCSX Water Systems Larry Dudek March 21, Plan for FY03 Review questionable legacy equipment and verify viability for NCSX New Scope: NB support.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
13 Hybrid and Electric Vehicle HVAC Systems.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
 Internal-combustion engine  Engine structure  Cylinder head structure  Valve trains  4 Stroke Engine  2 Stroke Engine  Reference.
CYLINDER HEADS AND VALVES. 1.DEFINITION  Cylinder head is a casting that covers the top of a cylinder.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
Engine Technology Engine Diagnostic its requires an understanding of the fundamentals & a systematic approach to determine what the problem is. If the.
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Cooling Sytem Motorcycle Engineering (021)
Friday – port side engine room weekly checks
ILC R&D Board Meeting: SRF Cavities Status and Plans
1.3-GHz Cavity Vacuum Furnace at IB4
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
How to Spot a Transmission Cooler Leak
'. \s\s I. '.. '... · \ \ \,, I.
' '· \ ·' ,,,,

Engine Top End Construction
Diagnosing Engine Problems
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Status of 1.3-GHz Cavity Vacuum Furnace at IB-4 SRF Dev. Group Meeting 27 Sept 2010

Much good news… Vendor visit last week Assembly complete Completed acceptance testing – Vacuum pressure 1.2x torr – Empty Chamber Bake-out 1000°C – SS cylinder Bake-out 800°C Completed FNAL training (7 engineers and technicians) 2

Some bad news… Small leaks in inner water lines Leak across inner seal of one of the gate valves leading to cryopump Vendor visit to make repairs Wed-Fri this week 3

Next week Repair to leak in outer water cooling line Run at least one bake-out cycle to test the system Prepare for ORC 4