Europa Clipper Pre-Project - Update to ICEE Teams Kari Lewis Jet Propulsion Laboratory, California Institute of Technology June 8, 2014 Copyright 2014.

Slides:



Advertisements
Similar presentations
EIS/Solar-B: 3. Electrical Interface to MDP EISMDP PIM HK PIM DHU DR analog data (temperature, current, etc.) S/C bus image compression status data command.
Advertisements

Pre-Decisional — For Planning and Discussion Purposes Only
Rosetta Magnetic Field PDS Review B. J. Anderson.
Measuring the Quantity of Heat Physics January 21, 2013 Coach Stephens.
Mars Invasion: Spirit, Opportunity, Mars Express Meghan McGovern.
Mars’ North and South Polar Hood Clouds Jennifer L. Benson Jet Propulsion Laboratory, California Institute of Technology July 22, 2010 Copyright 2010 California.
ESS 7 Lecture 14 October 31, 2008 Magnetic Storms
Further development of modeling of spatial distribution of energetic electron fluxes near Europa M. V. Podzolko 1, I. V. Getselev 1, Yu. I. Gubar 1, I.
IPPW-6 Instrument Accommodation on the Pioneer Venus and Galileo Probes Bernie Bienstock Jet Propulsion Laboratory California Institute of Technology 24.
A Polar Volatiles Laboratory A. Smith, R. A. Gowen, I. A. Crawford Shackleton Crater ESA Smart-1.
The Lunar Reconnaissance Orbiter (LRO) is the first mission in NASA's Vision for Space Exploration, a plan to return to the moon and then to travel to.
Temperature ( C) Pressure ( bars) Jupiter Probes Venus Surface Exploration CNSR Europa Surface and Subsurface Titan.
RHESSI/GOES Xray Analysis using Multitemeprature plus Power law Spectra. J.McTiernan (SSL/UCB)
Quantifying aerosol direct radiative effect with MISR observations Yang Chen, Qinbin Li, Ralph Kahn Jet Propulsion Laboratory California Institute of Technology,
SCIFER2 UV Emissions Allison Jaynes, UNH Dartmouth CASCADES2 Meeting 10/30/09 Allison Jaynes, UNH Dartmouth CASCADES2 Meeting 10/30/09 (Images, movie and.
RHESSI/GOES Xray Analysis using Multitemeprature plus Power law Spectra. J.McTiernan (SSL/UCB) ABSTRACT: We present spectral fits for RHESSI and GOES solar.
On average TES exhibits a small positive bias in the middle and lower troposphere of less than 15% and a larger negative bias of up to 30% in the upper.
National Aeronautics and Space Administration Lunar Mapping and Modeling Project Summary and Status Go for Lunar Landing Conference Tempe,
CIRSGSFC April 2004 dej-1 CIRS Instrument Overview CIRS Team Meeting Observatoire de Paris - Meudon April 26 – CIRS Instrument Group presented.
Mars Exploration By Jacob Stinar. Water on Mars.
SDW2005, juin, Taormina The Corot Space instrument.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
Rachel Klima (on behalf of the MASCS team) JHU/APL MASCS/VIRS Data Users’ Workshop LPSC 2014, The Woodlands, TX March 17,2014 MASCS Instrument & VIRS Calibration.
Spaceborne Weather Radar
MP BACH MultiPixel Balloon-borne Air CHerenkov Detection of Iron Cosmic Rays Using Direct Cherenkov Radiation Imaged with a High Resolution Camera 1.
EVM-2 Notice of Partnership Questions and Answers January 23, 2015.
Introduction Low mass, high speed impacting projectiles, performing science investigations from below surface. Objectives: ground truth, unique science.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
Earth Observation, Navigation & Science Page 1 Capacity Final Presentation, , Estec, Noordwijk Report for WP 3300 WP 3300.
Spacecraft Instruments. ► Spacecraft instrument selection begins with the mission description and the selected primary and secondary mission objectives.
A. Milillo, and the GENIE Team. Golden Age of of Solar System Exploration Ganymede’s and Europa’s Neutral Imaging Experiment (GENIE) GENIE is a high-angular-resolution.
The Sun. Solar Prominence Sun Fact Sheet The Sun is a normal G2 star, one of more than 100 billion stars in our galaxy. Diameter: 1,390,000 km (Earth.
1 Nori Laslo Johns Hopkins University Applied Physics Laboratory A NASA Discovery Mission.
New Horizons: Plans for Nix and Hydra Leslie Young New Horizons Deputy Project Scientist (USA) For the entire team.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Filling Mars Human Exploration Strategic Knowledge Gaps with Next Generation Meteorological Instrumentation. S. Rafkin, Southwest Research Institute
Radiation environment estimates for Europa lander mission M. V. Podzolko 1, I. V. Getselev 1, Yu. I. Gubar 1, I. S. Veselovsky 1,2, A. A. Sukhanov 2 1.
System for Radiation Environment characterization (fluxes, doses, dose equivalents at Earth, Moon and Mars) on hourly thru yearly time frame Example: Snapshots.
Evaluation of the flux of CR nuclei inside the magnetosphere P. Bobik, G. Boella, M.J. Boschini, M. Gervasi, D. Grandi, K. Kudela, S. Pensotti, P.G. Rancoita.
The PLANETOCOSMICS Geant4 application L. Desorgher Physikalisches Institut, University of Bern.
Cosmic-Ray Induced Neutrons: Recent Results from the Atmospheric Ionizing Radiation Measurements Aboard an ER-2 Airplane P. Goldhagen 1, J.M. Clem 2, J.W.
Airglow on Titan During Eclipse R. A. West 1, J. M. Ajello 1, M. H. Stevens 2, D. F. Strobel 3, G. R. Gladstone 4, J.S. Evans 5, E.T. Bradley 6 1 Jet Propulsion.
NASA Returns To Mercury in 2011 with MESSENGER. This is the first mission to Mercury since Mariner 10 in 1975 It will fully map the entire surface of.
Jarred Alexander Young October 2,  Langmuir Probe testing  Probes completed and setting up for electron temperature scanning  Power Supply 
Juno Mission To Jupiter NASA New Frontiers Program Launch Date: Aug. 5, 11:34 a.m. EDT Launch Period: Aug. 5 – 26 (~60 min window) Launch Vehicle: Atlas.
Cosmic Rays2 The Origin of Cosmic Rays and Geomagnetic Effects.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
2 Jun 2022 Jan 2030 Sep 2032 Jun months 1 month 9 months 11 months 9 months Launch Ariane-5 Jupiter orbit insertion Transfer to Callisto Europa.
Radiative transfer in the thermal infrared and the surface source term
Science investigations in the framework of expedition to Europa
Preliminary Presentation By Matthew Lewis 2 nd December 2005.
16-20 Oct 2005SSPVSE Conference1 Galactic Cosmic Ray Composition, Spectra, and Time Variations Mark E. Wiedenbeck Jet Propulsion Laboratory, California.
Welcome Briefing Instrument Concepts for Europa Exploration Program Dr. Curt Niebur ICEE Discipline Scientist, Europa Clipper Program Scientist October.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
Europa Mission Lisa Gaddis (USGS, Astrogeology)
GSFC/Spinhirne 03/13/2002 Multispectral and Stereo Infrared Cloud Observations by COVIR (Compact Visible and Infrared Imaging Radiometer) J. Spinhirne,
Solar observations with single LOFAR stations C. Vocks 1. Introduction: Solar Radio radiation 2. Observations with single LOFAR stations 3. Spectrometer.
Juno Steve Levin Juno Project Scientist April 1, 2016.
JUpiter Icy Moons Explorer (JUICE)
L4+L5 Mission as an Ideal Project for International Collaboration
L4+L5 Mission as an Ideal Project for International Collaboration
N. André, with inputs from J. Cooper
Payload Concept Review
VIRTIS Operations at Lutetia
Bethany, Jay, and Michael
Europa Kaitlyn Young.
Radiation Environment
Please read the following License Agreement before proceeding.
Satellite mission ideas using EISCAT_3D
Presentation transcript:

Europa Clipper Pre-Project - Update to ICEE Teams Kari Lewis Jet Propulsion Laboratory, California Institute of Technology June 8, 2014 Copyright 2014 California Institute of Technology. Government sponsorship acknowledged. Pre-Decisional — For Planning and Discussion Purposes Only 1

Introduction The material in this package is a compilation of information the ICEE teams may find useful based on recent discussions and requests the Europa Clipper Pre- Project team has received since the last update (dated March 19, 2014). The spacecraft and trajectory information is subject to change as the design matures. For additional information or questions, please contact: Kari LewisMelora Larson Jet Propulsion Laboratory, California Institute of Technology 2 Pre-Decisional — For Planning and Discussion Purposes Only 3/19/14

Model Payload Resources Summary 3 Pre-Decisional — For Planning and Discussion Purposes Only 3/19/14 Instrument Unshielded Mass (kg) Shielding Mass (kg) Total CBE Mass (kg) CBE Power (W) Data Volume (Gb/flyby) Comments Ice Penetrating Radar (IPR) Bringing down data between ± 1000 km Topographical Imager (TI) :1 lossy compression; each additional 4 k x 4 k image is 0.07 Gbit compressed ShortWave IR Spectrometer (SWIRS) :1 lossy compression; 2 full disk scans on approach; 2 full images during flyby Reconnaissance Camera (RC) Data volume varies with flyby altitude; max for 25-km flyby Thermal Imager (ThI) Operating for ~8 hr/flyby Neutral Mass Spectrometer (NMS) Kbps rate, acquiring data between ±5000 km from surface Magnetometer (MAG) Operates continuously; increased sample rate E ± 2 hr Langmuir Probe (LP) per orbitOperates continuously Totals: New: Increased NMS power and data volume; Decreased RC data volume

General Questions Can we get a STEP file of the S/C or at least of the nadir deck and any S/C structure visible from the deck? –We continue to try to get a STEP file approved for unlimited release. There is a lot of design information included in STEP files, so it is difficult to have them meet ITAR restrictions. Can we get a S/C thermal model? Or at least provide the external temperatures of the MMRTGs and the back of the HGA. –We do not have a thermal model of the S/C yet –MMRTG temperature is 180 °C –HGA MLI temperature is -160°C Can we get a trajectory file that covers launch to Jupiter? –Posted to the ICEE website – Is it possible to interchange the positions of the recon camera and SWIRS on the nadir deck –Yes 4

Radiation Questions How do we account for zone-specific shielding effect of spacecraft structure (e.g., on the instrument deck, the edge of HGA, etc.)? –No zone-specific radiation environments have been established. Each location strongly depends upon hardware in the immediate vicinity, which is in flux. Components such as the HGA will not contribute to shielding in a significant manner. The instrument deck will have highly-variable shielding contributions from spacecraft and other instruments. Will the project provide radiation environment definition per mission phase (e.g., cruise-to-JOI and JOI-to-EOM, and orbit-by-orbit)? –The vast majority of TID occurs during the Europa fly-by pedals. Each pedal is roughly equal in dose (approx. 35 krad/flyby for 100-mils Al spherical shell). The Environmental Requirements Document (ERD), available on the ICEE website, provides the Solar Energetic Particles (SEP) and Galactic Cosmic Radiation (GCR) environments, which are relevant throughout the entire mission (somewhat less important at Jupiter, due to magnetic shielding). 5

Radiation Questions What is the guideline of TID exposure if we want to avoid the bake-out to meet the planetary protection requirement? –TID would need to be ≥ 10Mrad –This would also imply simple electrical and mechanical interfaces to facilitate aseptic integration, using Vaporized Hydrogen Peroxide to sterilize the interface. What is the IESD environment that we will have to use? –IESD environment is shielding dependent. The dominant environment for IESD is the trapped electron spectrum. The ERD includes design guidelines. NASA-HDBK-4000A provides general guidance. Is it possible to provide us with the differential quantities or give directions on the accepted way to calculate the differential fluxes and fluences? –This information is currently going through approval for unlimited release 6

Topo Imager Questions (1 of 2) In the kickoff slide package, slide 128 has a conflict regarding the altitude where TI imaging switches from stereoscopic to monoscopic imaging. The figure indicates 1000 km and text indicates 1600 km. Slide 61 also indicates 1000 km. Which value should we use? –The 1600 km mentioned in the Slide 128 text is an upper limit and is not intended to imply that continuous stereo imaging would occur below that altitude. Stereo imaging continuously below 1000 km is required to support IPR sounding. According to slides 127 & 128 of the kickoff package, the spacecraft is nadir pointed throughout the entire flyby (≤66,000 km altitude). This is different than the Summer Study report (Europa Summer Study Final Report Part 1, slide 82), which included “pointed Instrument observations” between 2000 and 4000 km altitude. Is this why the model TI FOV was changed from two line arrays to a single area array? –The current Project position is that only nadir pointing will be provided. Various alternatives for obtaining monoscopic nadir or areal coverage above 1600 km at acceptable emission angles are possible. The use of an area array is one solution. Another would be to point one of the stereo line arrays near nadir and the other either forward or aft. 7

Topo Imager Questions (2 of 2) How was the 58° cross-track FOV (kickoff slides 49 & 69) for TI calculated? It appears that a cross-track FOV of 53° is sufficient to cover the 100 km swath width required for the IPR at 100 km altitude using the following equation: crosstrack FOV=2 × tan-1swathwidth2 ×altitude –The planning payload TI IFOV was selected to be 250 µrad to meet the required spatial resolution of 250 m at an altitude of 1000 km. The FOV was set as 4096 pixels × IFOV = 1 rad. This FOV met the original SDT requirement for 100 km swath width from 100 km altitude with a little margin. The SDT has since changed its requirement on stereo coverage swath width to be a function of radar penetration depth and S/C altitude. The planning payload FOV meets the current swath width requirement for a 3-km penetration depth down to an altitude of 25 km. The TI mass breakdown provided in the January update includes 0.45 kg for a harness. Is the mass of the ~ 3-m long (slide 8) TI cable from the nadir deck to the electronics vault included in that mass value? –Yes 8