SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.

Slides:



Advertisements
Similar presentations
Riparian Zone Habitat Assessment Vegetation and More.
Advertisements

Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
MONKEY RUN, ARCADE, NY. HISTORIC RAILROAD PROTECTION & DEMONSTRATION PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
Brief Synopsis of Project Hickahala Creek Hickahala Creek Pipeline Protection Project at milepost Tate County, Senatobia, MS Designed by Submar,
Rock Riffle Design Course
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
GRADE CONTROL. STABILIZE HEADCUTS FIRST, THEN WORRY ABOUT BANK INSTABILITY SECOND.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
STONES IN COMPRESSION – BOTH NATURALLY & MACHINE PLACED by Dave Derrick.
Becky Houdek - Assistant Planner Minnehaha Creek Watershed District Minnehaha Creek Reach 14 Feasibility Study Insert photo.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
SUB MAR West Fork of Beaver River West Point, OH. Pre-project pictures. Note eroding outer bank.
West Fork Beaver River, West Point, OH. Constructed Sept Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg.
Hickahala Creek Pipeline Protection Project at milepost Tate County, Senatobia, MS (Looking across and upstream in this view) Designed jointly by.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
GRADE CONTROL: the VIFFLE {Combo of the cross- Vane & rocked rIFFLE}
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
GRADE CONTROL.
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
ONONDAGA CREEK, NEAR SYRACUSE, NY
VINES – THE OVERLOOKED RESTORATION TECHNIQUE
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
When should you fix a stream????
SINGLE STONE BENDWAY WEIRS
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
Before Pictured is a natural log jam, at the start of the project. Depth of water is about one foot. Boulders to the left will be placed in the created.
When should you fix a stream????
Shaver Creek Permitting
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.

Flow Dig pool Glide stones Engineered Rocked Riffle stones in end-to-end compression Stone bank protection Key stones

Building the downstream sloped section of the ERR. CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Flow Profile view STONE ENGINEERED ROCKED RIFFLE FOR GRADE & HEADCUT STABILIZATION 10 1 ERR has a swale in the center to help fish passage during low flow The stream was not dewatered during construction as we only had a trickle of flow. Regulatory approved this of course.

Digging the DS keyway approx. 2 ft deep. CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Looking DS. Stone in place but loose (not in compression) CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Track walking so that stone is in end-to-end compression CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Close-up of sloped section of ERR #5-stones in compression CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Engineered Rocked Riffle #5 completed. Let’s see how it looks!!

Looking a completed ERR #5. Water from ERR #4 is creating a tailwater on the DS end of ERR #5. CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Flow left to right, completed ERR #5. ERR is has a swale in the center to help fish passage during low flow CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Close-up of sloped section of ERR #5-stones in compression CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Looking great deep pool where trout can be stocked. CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Looking instant marshland. Some flooded plants will die (that’s OK) & other plants will become established. CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Looking at old channel & flooded old overbank areas. Great habitat for a herps, smaller fish, insects, etc. CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Looking smooth transition from ERR to DS pool. CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

Looking DS from ERR #5. Backwater from ERR #4 is flooding the old channel & creating hemi wetlands CONSTRUCTION-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK

7MONTHS AFTER PROJECT COMPLETION Photos by Garold Sneegas February 3, 2009

Happy fish in Sand Creek!! 7 MONTHS LATER-SAND CREEK-KANOPOLIS, KS. PIX BY GAROLD SNEEGAS

Several sections of the stream were only a couple of inches deep before we installed the Engineered Rocked Riffles 7 MONTHS LATER-SAND CREEK-KANOPOLIS, KS. PIX BY GAROLD SNEEGAS

More happy fish in Sand Creek!!

8 MONTHS AFTER PROJECT COMPLETION Photos by Derrick APRIL 11, 2009

8 MONTHS ERR #5. 8 MONTHS LATER-SAND CREEK-KANOPOLIS, KS. PIX BY DERRICK