City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012.

Slides:



Advertisements
Similar presentations
City of Hubbard Transportation System Plan Update April 25, 2012.
Advertisements

Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Lecture 16 CE 2710 Norman Garrick
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
INTEGRATING SIGNAL AND LANE CONTROL Edward Lieberman, P.E. Jinil Chang, Ph. D Annual Meeting Panel 5: Emerging Technologies June 9, 2006.
CEM-512 Value Engineering Highway Project: South Interchange.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Comparative Traffic Study Morrisville-Carpenter Road versus Crabtree Crossing Extension Presentation to: Morrisville Town Council Prepared by: Parsons.
Los Angeles County Metropolitan Transportation Authority Simulating I-710 Corridor Presented in the Western ITE Annual Meeting Santa Barbara, California.
June 18, 2013 WINDSOR PARKWAY – ROSWELL ROAD INTERSECTION RELOCATION FEASIBILITY ANALYSIS.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
38 th Street to Kessler Boulevard Traffic Engineering Review Summary For Historic Midtown Initiative (HARMONI) By HNTB Corporation June, 2010.
9-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise C – Session #9.
Department of Public Works Public Hearing January 9, 2012 Proposed wireless telecommunications facility at intersection of Grand Avenue at California Boulevard.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
5/19/20151 Segoe Road Proposed Remarking Plan Scott Langer Traffic Engineer City of Madison Traffic Engineering Division Madison, Wisconsin.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
Lec 24, Ch.19: Actuated signals and detectors (Objectives) Learn terminology related to actuated signals Understand why and where actuated signals are.
Cherry Creek North and Country Club Historic RNOs and TDA Colorado Cherry Creek North BID Cumulative Traffic Study.
13 th Street and Dayton Avenue – Ames, IA Intersection Study ByungOck Kim Greg Karssen.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
I-15/LOS ALAMOS ROAD OVERCROSSING City Council Meeting January 17, 2012.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
Alternative Solution ONE Changes Phases from 4 to 6 based on the traffic demand of different movements; Optimizes Timing accordingly to minimize the overall.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
Tshwane Line 1 Traffic Simulation Results October 2012.
BROKENHEAD OJIBWAY NATION COMMUNITY MEETING June 23, :00 PM – 7:00 PM Information on the PTH 59N and PTH 101 Interchange.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Planning Department Zoning Code Amendment: Change Hearing Body from Hearing Officer to Planning Commission for Major Projects over 75,000 square feet City.
9-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise C – Session #9.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Traffic Flow Parameters Surface Street Application.
LADOTD Statewide Traffic Engineers Meeting June 19, 2014 Traffic Signal Timing Project Update Nick J. Ferlito, Jr., P.E., PTOE Neel-Schaffer, Inc.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Presentation to Traffic Working Group February 6, 2014.
Maryland at Edgerton Channelization  Maryland Avenue – Ramsey County Roadway  ADT 20,000 plus  Maryland/Edgerton Intersection in top 10 Citywide for.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Grand Ave & Duff Ave Craig & James CE 550 4/18/2007.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Case Study 1 Problem 3 Styner/Lauder Intersection Moscow, Idaho.
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
INTEGRATING ASSESSMENT OF THE ECONOMIC BENEFITS OF TRANSPORTATION IMPROVEMENTS IN PROJECT-LEVEL ALTERNATIVES ANALYSIS Meiwu An, Pikes Peak Area Council.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Proposed TIF-Funded Road Improvements: TIF 7 North Tarrant Parkway Presented by Jay Chapa, Assistant City Manager April 12, 2016.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
CITY OF NEW BERLIN SECTION 35 Neighborhoods G & H Comprehensive Plan Amendment Public Input January 2012.
Lessons Learned from Intersection Improvements on U.S. Highway 280 PMI Central Alabama Chapter Darrell B. Skipper, P.E.
Visit Our Website at: Click to edit Master title style.
Environmental Impact Report (EIR) Update May 2, 2016.
MOVA Traffic Signal Control Trial
Interstate 15 North Phase 4 8/19/2015 Update
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
Metropolitan District | mndot.gov
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Project Location: 35th Ave HSIP8
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012

What ’ s the Problem? N-S lanes are offset by 22 feet through the Alabama St./ Redlands Blvd. intersection. Traffic demands exceed the capacity of the intersection during peak hours. Unorthodox merge/intersection of Colton Ave. / Redlands Blvd.

Traffic Pattern Terminology “LOS” – Level of Service (Capacity vs. Demand) Ranges from A to F LOS “A” – Free Flowing Traffic LOS “C” – Occasional Traffic Restrictions LOS “F” – Jammed Traffic Condition

Solutions Improve the intersection geometry of Redlands Boulevard/Alabama Street (removes 22-foot offset). Improves vehicle traffic flow through intersections from a LOS “F” to LOS “C”. Create a signalized T-intersection for Colton Avenue/Redlands Boulevard.

Solutions (cont.) Incorporate value engineering to reduce property acquisition and construction costs. Proposed improvements be constructed as single phase, instead of multiple phases.

Comparison Present day

Comparison Value Engineered Design

Value Engineered Design (LOS “C” thru 2025) Comparison Present Day (LOS “F”)

Comparison - overhead view Present day

Comparison - overhead view Value Engineered Design

By reducing a single South-bound lane a significant portion new ROW from the northeast corner will no longer be necessary. LOS will remain at “C” for peak hours until year 2025 rather than Value Engineering

Property Acquisition Reduction Implementing Value Engineering

Colton Ave./ Redlands Blvd. And Alabama St./ Redlands Blvd. Intersections Ultimate Design* Value Engineering Design** Cost Savings To t al $ 9,911,233$ 8,659,447$1,251,786 Estimated Cost and Time Savings 3 years reduction in time until construction *5 lanes for all approaches at Alabama/ Redlands Blvd. **4 lanes for south-bound approach at Alabama/ Redlands Blvd.

Authorize staff to proceed forward with the Value Engineered Design for the Redlands / Alabama / Colton intersection improvement project (LOS “C” ). Authorize engineering service amendment with Parsons Brinckerhoff to prepare revised plans and specifications to implement the Proposed Value Engineered Design. Recommendation