CTP1 Lane/Road Closures beginning 12/27/ W Vickery Blvd 12/27/11 Road closed between Forest Park and Summit 15 th Ave 12/27/11 Road closed at IH30 turn.

Slides:



Advertisements
Similar presentations
Every participant in the Scotiabank Toronto Waterfront Marathon, Half Marathon and 5k has their own dream of reaching the finish line. On September 27.
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Jon Chiglo, PE Project Director 2014 Construction Plans.
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Moline Bridge Closure Unclassified ZDec09 US Army Garrison – Rock Island Arsenal Moline Bridge Closure.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
N RIC Airport Exit 51B Nuckols Road South Cox Road (no access) Staples Mill Road Parham Road Gaskins Road Broad Street [Rt. 250] SHORT PUMP State Route.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Race Course Athlete Location Spectator Location Clockwise Warm-up Venue Overview.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
West Contra Costa Unified School District
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Conference Center of the Americas US SOUTHERN COMMAND
Capital Improvement Program City of Warren, Ohio April 2012.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
OVERVIEW MARINE CORPS BASE CAMP LEJEUNE. CAMP LEJEUNE MARINE CORPS BASE CAMP LEJEUNE MAIN GATE.
Warm Springs Community Park 1 Administrative Building 3 School of Engineering (EAST) 2 Library and Student Service Center (WEST) 1. Administrative Building.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Independence Blvd. (Hwy 74 West) Toward downtown Charlotte Prepare to exit right (exit 243) Charlottetowne Ave.
LMC, Bethesda Maps 01/21/ LMC, Bethesda Maps 01/21/ Lockheed Martin Headquarters 6801 Democracy Center 6901 ROCK SPRING DR OLD GEORGETOWN.
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Map: St. Louis to Ft. Leonard Wood
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
How would a truck get through? Any suggestions?. No parking allows access.
Traffic Lights Road Signs Road Markings. Do Now… True or False  A stop sign is shaped like a triangle.  A broken yellow line means that you can pass.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.
Challenged Detectors – Volume- Occupancy Plots & Maps.
Fang Yuan, PhD. PE. SEPTEMBER PAPAL VISIT July 1, 2015 Potential Traffic Impacts.
Dennis Schroeder ED 142 9/14/06 Construction Systems.
Delmar Boulevard bridge replacement over Interstate 170.
Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 1 Leilehua Ave.
M-99 (Superior St) Reconstruction Public Open HouseMarch 21, 2016.
DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change.
MARCH 18, :00 A.M. CITY COUNCIL CHAMBERS 2016 TRAFFIC SUMMIT HOSTED BY: CITY OF LANSING DEPARTMENT OF PUBLIC SERVICE.
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Scranton/Carter Road Reconstruction
Zones 1 & 2 Total Count Item 2008 Quantity 2007 Quantity Difference
UTILITY DESIGN SERVICES
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
Jeffrey Keirn Illinois Department of Transportation
Work Zone Safety Review – District 1 - Duluth
Runners will line up on Erie, south of Marine Dr.
Career Resource Center
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Roads to Heritage 2 Subdivision, Wake Forest, NC
Roads to 4216 Alpine Clover Dr, Wake Forest, NC
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
The road along the track will be closed for student safety.
STATE SUEE AND ONE WAY CORRIDORS
Contract 60X10 Informational Meeting Weber I-55
Comprehensive Transportation Plan
US 1 Project “A” FM No.: Work Mix: Intersection Improvement At: Park Ave. Phase: Design Year Funded: 2020 Cost: $200,000.
Current and proposed HOT facilities update
Harbour Island Force Main Replacement
Metropolitan District | mndot.gov
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
Project Sites CE 365K Spring 2016.
Presentation transcript:

CTP1 Lane/Road Closures beginning 12/27/ W Vickery Blvd 12/27/11 Road closed between Forest Park and Summit 15 th Ave 12/27/11 Road closed at IH30 turn around W Vickery Blvd Road closed 12/27/11 between Forest Park and Summit to allow for reconstruction and bridges over the FWWRR Old University Dr 12/27/11 Road closed from IH30 to Rosedale East Bound Vickery Right Lane Closed 12/27/11 Right Turn to University closed Detour via Rogers and Collinsworth St

CTP1 Lane Closure at 15 th Ave and W. Vickery Blvd 15 th Ave closed to thru traffic Tucker St closed to thru traffic W Vickery Blvd Road closed between Forest Park and Summit Vickery will re-open with Phase 1b (late 2012) 15 th Ave Road closed at IH30 turn around Permanent

CTP1 Lane Closure Old University and EB Vickery Old University Dr 12/27/11 Road closed from IH30 to Rosedale East Bound Vickery Right Lane Closed 12/27/11 Right Turn to University closed Detour via Rogers and Collinsworth St