Post Palace Angéla Kovács +36.70.705.2918 Valéria Hortolányi +36.30.466.2333

Slides:



Advertisements
Similar presentations
All of the surrounding buildings are older and traditional. Frank Gehry sought to bring an organic form that makes it look like the building can be a celebration.
Advertisements

-Street layout -Organization -Transportation around the city -Housing -Customs.
GLOBAL CITY BUSINESS PARK The Project The first phase of the Class A office park comprises of m m2 built area and m m2 of net area spread.
EUR 147,000 2 nd floor of 6 story building, 90 M2 3 room apartment on Mill Street 31, Riga, Center 3 bedroom apartment in the quiet Riga center. Autonomous.
WP3. SMART TECHNOLOGIES AND ALTERNATIVE FUELS BATTERIE Better Accessible Transport to Encourage Robust Intermodal Enterprise Shetland, September,
The Baltic International Academy accepts over a hundred foreign students and students from other towns per year. There are a number of options for foreign.
Amarin Mansion It is located in Soi Arunamarin 39, Arunamarin Rd. Only 10 – 15 minute walk to Siriraj Hospital. Facilities: Fully furnished Lobby Parking.
Kyiv’s new shopping mall – UniverCity UniverCity.
1 Creating a smart city / Energy : IssyGrid Description The first district smart grid in France Initiated in 2011 by a group of businesses located in the.
COMENIUS MEETING Germany Environmental problem solving Lycée Etienne Oehmichen France.
El Cajon Courtyard Excel Hotel Group July 1, 2014.
ZÁHONY: STRATEGIC POSITION IN THE NEW EUROPE. MAJOR TRANSPORT ROUTES THROUGH ZÁHONY LOCATED ON A MAJOR TRANSPORT CORRIDOR (No.5 Pan- European corridor)
HISTORICAL PRESERVATION AND SUSTAINABILITY
South Carolina Vocational Rehabilitation Department.
Construction Industry in Hungary Edina Nagy Lajos Kiss Szabolcs Hornyák.
SAN LORENZO PLACE.
Electric Scooter Charging Station Access and Security ‘Source London’s aim is to make sure that everyone within the London area is within one mile of a.
Logo
JASPERS – Supporting Urban Transport Projects Ministry of Regional Development, Czech Republic JASPERS Seminar, Prague - 28th November 2007 Dr. Joachim.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
Property Appraiser and Tax Collector Office Space Search Update Real Estate Management March 25, 2014.
Unit Two Go Straight Ahead The First Two Periods Designed by Lu Yan.
PARKING ENFORCEMENT IN BUDAPEST | Ferenc Arpad KOCSIS – Hungarian Parking Association September EPA Congress Dublin - Convention Centre Dublin.
P1901_0141_r0 Announcement of IEEE P1901 Tokyo Meeting Dates: Tuesday, June 13 –Friday, June 16, 2006 Venues: 1. Headquarter of Mitsubishi Electric on.
Prepositions of Movement
Buildings and places in a city. In a foreign city Excuse me, is there … near here? Excuse me, where is …?
Project Scope N EXT L EVEL Consulting TEAM I Roman HamediSean Griffin Tierny MirandaKrystal McDonald Richard RohrmanSam Thakkar Lydia Watts.
By: Eduardo Guerrero BIKE RENTAL STATIONS IN ST.LOUIS.
Tourist attractions and accessible space. Key elements of tourism space Tourist attractions and outdoor space (hotels, restaurants, tourism information.
Technology Impacts on the Future of Transportation Mark Hallenbeck, Director of the Washington State Transportation Center, University of Washington 1.
Prestige Downtown Condo Suites LEGAL CENTER S.E. Third Avenue, Suite 400 Fort Lauderdale, FL, (954) …the most luxurious shared space.
ALL ROADS LEAD TO HATTIESBURG State of the City 2007 Presented by Mayor Johnny L. DuPree, Ph.D.
WE ARE MOVING! MOVING DATE: NEW OFFICE: COMPANY NAME.
Urban Sprawl Government notices problems in the 1980s –Urban sprawl –Car ownership rising (1960: 113/ : 422/1000) –Little housing for low income.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Data Center Facility & Services Overview. Data Center Facility.
TRGOVINA 22 AD “radna zona 22. decembar - Ilićevo” Investment opportunity Trgovina 22 ad, 19. oktobra 2, Kragujevac, Serbia
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
Atlas House Business Center BELGRADE SERBIA Each office is independently owned and operated.
NSCAD - New Media School | Reinaldo Torres | Spring Design Studio | Instructor: Wassim Jabi Ph. D Nova Scotia - Halifax Region Halifax Dartmouth.
BUYING A NEW CAR Consumer Math p Key Words  Base price: the first amount listed on a car’s price  Options: extra items added to a car  Transportation.
Sipkay Barna Secondary school for Tourism, Hospitality, Commerce and Business Our school is situated in the North-East part of Hungary. Our town Nyíregyháza.
MOTION TEXT WORK. HOW DO DISTANCE AND DISPLACEMENT DIFFER? Distance describes how far an object has moved; Displacement includes distance and direction.
DON’T PANIC Mesa County Public Library District Evacuation Procedures These are general instructions and procedures. Every situation is different. Use.
Elected to first four year term as Mayor of the City of Elyria, Ohio in November 2011 A fifth generation native of Elyria Master of Public Administration,
Where is the restaurant?
February 2, 2012 City of Lee’s Summit Cultural Facilities Master Plan 1.
Walk Statistics.  The question has been asked: “Is Lomas a better BRT corridor than Central?”  The purpose of this analysis is to compare the two corridors.
TWO INITIATIVES ON AUTONOMOUS VEHICLES AT MIRAMON TECHNOLOGY PARK (Citymobil2 & PRT MIRAMÓN) Jesus Murgoitio 1 Maria Izaguirre 2 (1) Tecnalia Research.
The Pearl Place as of January 2014HLURB LTS # Pearl Drive cor. Gold Loop, Ortigas Center, Pasig City.
Industrial park “CENTRAL” Kremenchuk. 1 Industrial park Industrial park - equipped with proper infrastructure area, within which members of the industrial.
The Elevator In 1852, Elisha Otis invented the elevator safety brake.
HERITAGE real estate Lets Talk Business Group Members: Alok Bari Sayali Umbarkar Abhijeet Shinde.
The Ultimate Venue in the Prestigious Location Strategically situated in the heart of downtown city center. Located on the 5 th floor of Siam Paragon.
The Tower House. A luxury house situated in a small urbanization at the top of the town. The house is in immaculate condition and around 11 years old.
Josh Secrieru and Nick Parvahesh Planning 10
M PARK AD Sofia.
Featured Image 94 Webber Street Media Design Office to Let.
Josh Secrieru and Nick Parvahesh Planning 10
Economics in my region ESzC Bornemissza Gergely Szakgimnáziuma,Szakközépiskolája és Kollégiuma Eger, Hungary 09 – 12 November 2016.
801 Brickell Avenue 9th Floor Miami, FL 33131
2-Level Boutique Office for Lease
Key Issues Why do services cluster downtown? Where are people distributed within urban areas? Why are urban areas expanding? Why do cities face challenges?
EXCLUSIVE MULTI - FAMILY OFFERING
Post Palace Angéla Kovács Valéria Hortolányi Szeged Tisza L. Blvd. 41.
1315 E. Cary Street FOR LEASE First Floor Suite Richmond, VA 23219
TO LET ECONOMIC BETHNAL GREEN OFFICE/STUDIO
Comparative Market Analysis – Residential
250 Catalonia Building Remarks:
250 Catalonia Building Remarks:
Presentation transcript:

Post Palace Angéla Kovács Valéria Hortolányi Szeged Tisza L. Blvd

Post Palace Business Center Location: The building is situated in the city center of Szeged, directly in the neighboorhood of the downtown, opposite of the Saint Anna Bath. It is located at the junction of the Kossuth Lajos Avenue, which leads from Budapest, and the Tisza Lajos Boulevard, which bounds the downtown. Transport: The business center is situated about two minutes walk distance from the downtown, and there are more bus-, tram-, and troleystations at the opposite of the building. Environmental awareness is very important for us, therefore we constantly trying to help with bike sheds, dressing rooms and showers for the cyclists. Parking: In the surrounding streets there are pay parking. In the private parking next to the business center the renters can favorably rent a parking place.

Map

The description of the building In Szeged, the business center is known as Post Palace, named by the architectural innovations, through which at the handover in 1979 it was Hungary’s most ergonomic building. The center is well maintained. The building has a m² area. It has two main annexes, with 3 stairways, 4 passenger elevators and a goods lift. In every storey there is a male and female plumbing unit, available for the renters. The telecommunication tools, optical cables, batteries, diesel generators, that are installed in the business center, enticed Hungary’s grand telecommunication companies – furthermore the smaller firms take the advantage of the great infrastructure. The superior renters of the business center are National Police Headquarters, Tax and Financial Control Administration, Tesco Express, OCE – International Company Group, and Invitel – a key player in Hungary’s telecommunications market. The building is centrally not air-conditioned, but the renewed offices are equipped with own air-conditioning systems. The reception is located on the ground floor, opposite of the main entrance.

Services 24 hours reception post handling 24 hours error correction various sized, renewed offices on request (14 m² m²), high speed optical cables available, industrial electricity buying available, own transformal station, diesel generator available, closed parking, cafe, dance studio

Offices to let 1. floor: 101 and 102 : 50,6 m² + 24 m² 103 : 40,6 m² 104 and 105 : 24,8 m² + 33,2 m² 106 and 107 : 33,2 m² + 24,8 m² 108 and 109 : 33,2 m² + 16,3 m² 111: 24,8 m² 100\c : 316,2 m² 2. floor: 206 : 13 m² 207 : 13 m² 208 : 13 m² 209 : 13 m² 210 : 13 m² 211: 13 m² 212 : 13 m² 213 : 13 m² 214 : 13 m² 3. floor: 301 : 270 m² 302 : 20,3 m² 303 : 12,4 m² At the technical part the 3. floor: 819,4 m² 4. floor 401 : 270 m² 402 – 409 : 100 m² 416 : 12,4 m² 417 : 24,8 m² 418 : 24,8 m² 419 : 12,4 m² 420 : 20,3 m² The whole 5. floor with optional parking place The whole 6. floor.829 m²