Hucks and Browne Road Improvement Project Second Public Meeting October 5, 2010.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Great Western Corridor Feasibility Study
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
U.S. 33 Northern Connector Alternative
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Maryland Avenue and Westminster Street Jerry Auge, PE Project Manager Ramsey County Paul St. Martin Traffic Engineer City of St. Paul September 10, 2013.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
5/19/20151 Segoe Road Proposed Remarking Plan Scott Langer Traffic Engineer City of Madison Traffic Engineering Division Madison, Wisconsin.
River Road West Penrose Street Bridge Street Road Safety Scheme May 2014.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Limebank Road Environmental Assessment Study February 19, 2003.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
U.S. 150 / S.R. 56 Roadway Rehabilitation Project Thursday, August 22, :00 p.m. Presentation Orange County Community Center Paoli, Indiana.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
U.S. 33 Road Reconstruction Goshen High School Auditorium 6 p.m. Wednesday, August 20, 2014.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
STA Safety Project PID #76439 December 12, 2006.
Outline  Board Direction  Tasks Completed  Recommendation.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Visit Our Website at: Click to edit Master title style.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Pioneer Road Relocation and Reconstruction Project
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
Project Management Team Meeting #3
I-280 Corridor Study and I-280/Winchester Blvd Project
Center City Connector 101.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Highway Safety Team Staff Meeting SMART Portal HSIP Application Demonstration Systemic Safety Improvement (SSI) November 21,2017.
Issaquah-Fall City Road
Traffic Study Presented by Keith Wenners, pe, ptoe
1200 West Widening and Reconstruction Project
Meadow Lake Boulevard Street Extension Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
Parks Highway Reconstruction: Lucas Road to Big Lake Road
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

Hucks and Browne Road Improvement Project Second Public Meeting October 5, 2010

Outline Introductions Project Overview Questions From June 3 rd Meeting NCDOT Speed Evaluation/Recommendations Revised Project Schedule Question/Answer Please turn off cell phones and pagers

Introductions Michael Barnes, City Council Kevin Allred, CMPD Scott Cole, NCDOT Leon Howe, In-house Design Program Manager Matt Magnasco, CDOT James Shapard, CDOT Allison Brickey, Design Engineer Alan Morrison, Project Manager

Existing Conditions Narrow (9’) travel lanes No exclusive turn lanes Substandard Geometry High severity crash history Growing Traffic volumes Proposed Improvements Designated turn lanes on Hucks Rd and Browne Rd Provide standard-width (11’) lanes Realign Hucks Rd to “T” intersection Flatten curve on Browne Rd Install signal at intersection Widening for left-turn lane north of Hucks Rd will be removed from this project scope of work. Project Overview

Deleted from project Project Scope/Limits

Question 1: Can you give the community a better idea of the long range plans for area? Question 2:Can there be more thorough communication with the effected neighbors? Question 3:Will the traffic signal have left-turn arrows? Question 4:Can we have the limits of the project staked on the ground regarding the location of sidewalks and shoulders? Question 5:Can we have more frequent Community update meetings? Question 6:Can the speed limit on Browne Rd be lowered to 35 mph? Questions from June 3 rd Public Meeting

Question 1: Can you give the community a better idea of the long range plans for area? Response:CDOT performed a Six-Step process to evaluate the potential future cross section of Browne Road. Long-Range Plan for Area

Urban Street Design Guidelines Six Step Process

Six Step Process: Typical Section #1 Browne Rd. between Hucks & David Cox –2 travel lanes + center turn lane or median –Bike lanes –8’ planting strip –6’ sidewalk Similar to Projects On: –Cindy Ln. –Nevin Rd. –Prosperity Church Rd.

Six Step Process: Typical Section #2 Browne Rd. between Hucks & DeArmon/Allen Brown Roads –4 travel lanes –Bike lanes –8’ planting strips –6’ sidewalks –Possible median Similar to: –Prosperity Church Rd. [with median] –Hickory Grove Rd. [without median]

Six Step Process: Alignment

Six Step Process: Implementation/Timeframe All concepts are preliminary All concepts are subject to change Full planning studies will occur prior to additional improvements Currently no additional projects planned Private Development could implement incremental improvements

Question 2:Can there be more thorough communication with the effected neighbors? Response:a.) The mailing list was updated to include all residents of Amber Leigh subdivision. b.) Follow the link below to receive additional project information: epm.charmeck.org Select “ Transportation Projects ” and then “ Browne/Hucks ” Better Communication

Question 3:Will the traffic signal have left-turn arrows? Response:Yes, but it will rarely be activated. To handle the morning rush hour/access to the school, a left-turn phase on Browne Road will be operated on a queue detector. Left-turn Arrow on Signal

Question 4:Can we have the limits of the project staked on the ground regarding the location of sidewalks and shoulders? Response :The limits of the project are typically staked during the real estate phase at the request of the property owner. Staking Project Limits

Question 5:Can we have more frequent Community update meetings? Response:This is the second meeting based on the request from the community. Further updates will be made through postcards and the web site. More Updates/Information

Question 6:Can the speed limit on Browne Rd be lowered to 35 mph? Response:NCDOT has completed a speed evaluation for Browne Rd from Eastfield Road to Harris Blvd. Scott Cole, NCDOT Division Traffic Engineer, will discuss the results of the completed study. Browne Rd. Speed Limit Change

NCDOT Speed Evaluation Eastfield Road to Harris Blvd (South of Clark’s Creek) Existing Posted Speed:35 mph 85 th Percentile Speed: 47 mph 15 th Percentile Speed:38 mph Most Common Speed:42 mph Max Speed:51 mph

NCDOT Speed Evaluation Eastfield Road to Harris Blvd (North of Dearmon Road) Existing Posted Speed:45 mph 85 th Percentile Speed: 45 mph 15 th Percentile Speed:36 mph Most Common Speed:40 mph Max Speed:52 mph

Revised Project Schedule Design Scheduled for Completion November 1, 2010 Real Estate Acquisition from December 1 to Mid June 2011 Utility relocation during Real Estate through July 2011 Construction scheduled to begin August 2011 Scott Cole, NCDOT Division Traffic Engineer, will discuss the results of the completed study.

Question/Answer