SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Fine Tuning Boulders transportation system Presented by: Marni Ratzel GO Boulder/ city of boulder making infrastructure work for biking and Walking.
City of Oakland: Road Diet Experience
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Funding Programs Surface Transportation Program (STP) Transportation Alternatives Program (TA) Congestion Mitigation / Air Quality (CMAQ) Highway Safety.
Publication No. FHWA-HRT Federal Highway Administration University Course on Bicycle and Pedestrian Transportation International Approaches to Bicycle.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
City of Ashland Transportation System Plan Update September 6 th, 2012.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Contact: Beth Morris
Florida Department of Transportation, November 2009
6 th Street (Junipero to Bellflower) Bike Boulevard Design Concepts March 2012.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
 Jebessa Dara  Josh Finley  Jon Gibson  Rodney Pfiefle.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Hillsborough County Walk/Bike Action Safety Plan Hillsborough County MPO Prepared for: Prepared by: Hillsborough County Bicycle/Pedestrian Advisory Committee.
Texas Tech University Bikeway Plan August 12, 2005.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Trail Funding Sources & General Information
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
TRANSPORTATION ENHANCEMENTS (TE) PROGRAM. Transportation Enhancements (TE) Program What is the Transportation Enhancements (TE) Program? What is the Transportation.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Chicago Department of Transportation Bobby L. Ware, Commissioner Richard M. Daley, Mayor Metropolitan Planning Council November 3,
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Maryland at Edgerton Channelization  Maryland Avenue – Ramsey County Roadway  ADT 20,000 plus  Maryland/Edgerton Intersection in top 10 Citywide for.
LITTLE BOHEMIA NEIGHBORHOOD ASSOCIATION 35E Bike Path Enhancement CIB Proposal.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Metro Highway Program Presentation to CMAA Abdollah Ansari
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Traffic Safety. WHY ARE WE HERE To keep children safe around our schools What we will be discussing –Driving safely in and around Schools –Bicycle safety.
Complete Streets Training
A PRESENTATION BY THE DISTRICT 1 COMMUNITY COUNCIL POINT DOUGLAS ROAD RECONSTRUCTION.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Livingston County Transportation Connectivity Plan Final Report December 2013.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
District 11 CEAL Meeting: Bike/Ped Update SETH CUTTER DISTRICT BICYCLE AND PEDESTRIAN COORDINATOR APRIL 13, 2016.
2016 Active Transportation Plan Goals, Objectives & Criteria Bicycle and Pedestrian Facilities Advisory Committee March 2, 2016 meeting.
Public Works Capital Projects FY Projects Completed FY 2014.
1 City Council Work Session September 24, 2012 State of Transportation in San Leandro.
Complete Streets Training Module 4b – Designing for All Users.
Arizona Forward Update
Improvements to Stockton Street
Geo Targeted Mobile Advertising
Hesperian Boulevard Corridor Improvement Project San Lorenzo
US 92 Pedestrian Connectivity & Safety Assessment Study
District 3 Complete Streets Projects
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
River to Sea TPO Meeting US 92/International Speedway Boulevard
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
US 92 Pedestrian Connectivity & Safety Assessment Study
Transportation Alternatives (TA) Set-aside
Presentation transcript:

SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community

SUISUN CITY Railroad Avenue Extension (Marina Blvd. to Main Street) Construct four-lane arterial parkway between Marina Boulevard and Main Street – Includes 1,500 linear feet of street – New bridge over Union Avenue Creek – Traffic signal at the intersection of Railroad Avenue, Main Street and the Highway 12 freeway ramp. Provides a direct connection of Railroad Avenue (a cross-town arterial roadway) to the westbound Highway 12 on- and off- ramps as well as to the City’s Marina Blvd. area. Provides alternative access to Highway 12, Suisun City Waterfront and the Train Station for commuters, pedestrians and bicyclists Estimated cost: $322,000 (Plan document); $3,045,000 (Full implementation)

SUISUN CITY Railroad Avenue Extension (Marina Blvd. to Main Street)

SUISUN CITY Railroad Avenue Extension (Marina Blvd. to Main Street)

Safe Routes to Transit Improves pedestrian and bicycle access to and from the Suisun Train Station in the Historic Waterfront District – Removes obstacles – Upgrades pedestrian facilities to current ADA standards – Provides additional bicycle facilities – Provides better lighting, adding signage, and pavement markings – Includes fencing to discourage/prevent jaywalking across Main Street – Includes countdown pedestrian heads at traffic signals and other improvements to enhance comfort and safety of pedestrians and bicyclists. – Includes pavement rehabilitation on Main Street from Driftwood Drive and the Highway 12 West off-ramp to Downtown/Main Street. Estimated cost: $40,000 (Plan document); $550,000 (Full implementation) SUISUN CITY

Safe Routes to Transit

Construction of a safe transit environment for pedestrians and bicyclists along Lotz Way. – Construction of a Class I bikeway – Provides optimum access to the Train Station for pedestrians and bicyclists – Completes the gap in the bikeway system between the downtown area and the Grizzly Island Trail. – Potential SR2S and SR2T candidate. Estimated cost: $250,000 (Plan document); $1,000,000 (Full implementation) SUISUN CITY Lotz Way Bike and Pedestrian Improvements

SUISUN CITY

Suisun City Planned Development Area Connectivity for a Better Community