SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
1 Designated Historic Landmark Opened to Traffic in 1883 Construction is Scheduled Overnight Construction Limited Weekend Construction.
Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Supervision and Administration
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
Carrollton Bridge Jonathon L. Sera, P.E. Approaches to Historic Bridge Rehabilitation Case Study #3 1.
AASHTO Sub-Committee on Design Meeting April 28, 2010.
E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF.
Reconstruction of the Eads Bridge Highway Deck
Vertical Concrete Slipforming Scholer-Peterson Concrete Conference February 12 Kansas State University by Fred J. Fairchild, P.E. Department of Grain Science.
 Project Delivery  Design Considerations  Lessons Learned.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
October 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
1 P H I L L I P S T O N Route 2 Over Route 2A SPMT Heavy Lift September 8, 2015| Leading the Nation in Transportation Excellence |
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
Introduction to a pit installation
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
Current Construction Projects Major Projects Pinellas County.
Working Successfully With Property Managers: An Interactive Engagement
Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
“Get in, do it right, get out, and stay out.”
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
By Spokes On A Wheel I-35/Hwy 183 – Interchange Upgrade.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Route 1 Olden Avenue & Mulberry Street Hyperbuild Project.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD E.T.& L. CORP.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
High Bridge Re-Deck Project
Big French Creek Slide Timeline of Events
Hays County Commissioners Court
Project Purpose and Objective
US26: Cornelius Pass Rd -185th Ave
SW Gage Blvd - Street Repair Project
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Contract 60X10 Informational Meeting Weber I-55
Presentation transcript:

SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011

A traffic accident between a pickup and an 8,200 gallon gasoline tanker left two fatalities and the bridge beyond repair

Friday, JANUARY 21, :30 PM accident occurred. 6:30 PM start setting up MOT to allow traffic past the site via exit and entrance ramps closing SR-3 8:30 PM DOT was allowed access to inspect the structure. 10:00 PM DOT determines that 2 out of 3 spans on each bridge need replacement. Contractors were called to attend a pre-bid conference at noon on Saturday 1/22/2011 for the replacement of two spans and one pier on both bridges and all repair associated with accident. 10:30 PM start developing contract.

Saturday, January 22, :00AM to 11:00 AM Scope of work and MOT plan are complete 12:00 PM pre- bid conference on the bridge site with Leware Construction, Johnson Brothers and Lane Construction. 2:00 PM to 10: 00 PM receive and answer contractors bid questions.

Sunday, January 24, :00 AM DOT opened bids. Lane apparent low bidder at $2,191, and 25 days. 8:30 AM contact awarded to Lane Construction. 25 Days to have bridge Open with three additional weeks for cleanup. $50,000 per day user cost penalty if traffic not re- opened by the 25 th day, February 16 th. Sunday PM Lane starts mobilizing.

Traffic Control A detour was set up to send Beachline traffic across the closed SR-3. To increase capacity the ramps were widened with temporary pavement.

Contract Day 1 January 23, 2011 Mobilization and Demolition begins

Monday January 24 Day 2 9:00 AM 4:00 PM Demolition continues

Tuesday January 25 Day 3 9:00 AM6:00PM Demolition Complete

January 26 Day 4 Removal of Debris and slope pavement

January 27 Day 5 Connection to existing footer Removal of fuel contaminated soil

January 28 Day 6 Column FormsPre tied cap steel

January 29 Day 7 Columns and Caps poured monolithically

January 30 Day 8 Final steel adjustment and prep for pour Concrete pour for piers

January 31 Day 9 Clean up of existing structure Bearing pads and slope pavement

February 1 Day 10 Beam setting

February 2 Day 11 Beams set and columns stripped

February 3 Day 12 Forming diaphragms and installing safety lines

February 4 Day 13 Overhangs and deck forms being placed Barrier wall footing placement.

February 5 Day 14 Stay in place forms and reinforcing steel being placed.

February 6 Day 15 Continuing deck reinforcement Bidwell setup and steel adjustments

February 7 Day 16 Reinforcing steel in place, Bidwell dry runs and clearance checks.

February 8 Day 17 Start deck pour 9:00 AM Eastbound complete 3:30 Westbound starting Completion 6:30 PM, flying out the Bidwell

February 9 Day 18 Decks in place and curing Removing edge forms and tying barrier wall steel

February Day Project work continued on Day 19 through opening on February 14, Day 23 with bridge rails, deck grooving, milling and resurfacing of roadway approaches damaged by fuel spill and fire, and final striping of the bridge and roadway.

February 14 Day 23

Ready to do it again??