PROPOSED HPD BIKE-PED MASTER PLAN HPD PRESENTATION.

Slides:



Advertisements
Similar presentations
ce.com Ontario Trails Conference 2010 Ontario Trail Conference June 2010 Kara Van Myall, MCIP, RPP, OALA, CSLA.
Advertisements

ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Concept Plan Presentation October, THE OPPORTUNITY A large portion of the area between Peger Road and Denali School is under utilized public land.
The Center for Houstons Future? Energy Corridor District.
Louisiana Safe Routes To School Program
Human Powered Delray All Streets should be complete streets February 5, 2015 FDOT Transportation Visioning.
Cowlitz Regional Trails Plan. Introduction Cowlitz County Parks Facilities Plan Cowlitz County Parks Facilities Plan Cowlitz County Bikeway Plan Cowlitz.
Borough of Carlisle, PA Smart Transportation Projects SCORP Technical Advisory Committee November 18, 2010.
Local Planning Initiatives Connecting Communities Planning Grant Curtis Baker AMATS Planning Administrator.
Titusville to Edgewater Bike Loop PD&E Study
Publication No. FHWA-HRT Federal Highway Administration University Course on Bicycle and Pedestrian Transportation International Approaches to Bicycle.
Beautiful PB Workshop Summary 212 ideas + proposed design solutions summarized in four priority investment strategie s: Create a highly integrated network.
Capital Improvement Program City of Warren, Ohio April 2012.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Contact: Beth Morris
Slide 1. Slide 2 Introduction How did you get to school as a child?
Using LDRs to Implement Ped/Bike Change. LDRs – Land Development Regulations The collection of laws and regulations that govern the use of land, zoning,
PROJECT KICK-OFF Jason Collins, Ph.D., P.E., AICP October 14, 2008.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
1 RTD TOD Program University of Denver November 2004.
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
Planning & Public Health “My Oh My” Spokane County Active Living Task Force Melissa Wittstruck-Eadie, AICP Planner City of Spokane, WA Heleen Dewey Health.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Why do you need a plan for walkers? They can walk anywhere, can’t they?
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
2014 TOP TEN. 10 Federal Highway/Federal Transit Certification Noteworthy Practices:  Strategic Planning process and priorities  Complete Streets.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Greenways and Shared-Use Paths Lesson 19 Publication No. FHWA-HRT
ECIA A Regional Response to Local Needs CHANDRA RAVADA Director of Transportation Introducing Long Range Transportation Plan.
HIKE ASPEN FALLS Guide to hiking and walking paths in and around our city.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
“Connecting Our Communities” January 6, Mission “To encourage the creation of trails and greenway corridors, parks, and preserves in order to enhance.
 FRLP Proposed Boundary Line Adjustment: Confluence Virginia What life have you if you have not life together? There is no life.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Phase 2: 30% Design Plans September 4 th, 2012.
The Main Street Bike Lane Project LADOT Bike Program.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
Transportation Improvement Program Fiscal Year Transportation Improvement Program Fiscal Year Summary of Document and Projects Advisory.
Regional Trails Corridor Assessment. Project Goals »Complete the regional trails network in the TPO Planning Area and advance the Florida Greenways and.
Comprehensive Plan Planning for the Future of East Bethel City Council / Planning and Zoning Commission Public Hearing – March 8, 2006.
City Leadership & Bike Edina Task Force Annual Work Session February 16 th, 2010.
Grand Canalscape Phase I and II General Update October 30, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Comprehensive Approach: The 5 E’s Lesson 24 Publication No. FHWA-HRT
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Garrett Bolella, Tim Chan, Greg Khirallah, Dave Miele, Becca Ruitto.
Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal
District 11 CEAL Meeting: Bike/Ped Update SETH CUTTER DISTRICT BICYCLE AND PEDESTRIAN COORDINATOR APRIL 13, 2016.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Transportation as a Health Issue (Relationship of community planning, transportation and health)
Bicycle Master Plan The City of Rochester is dedicated to making this a world-class bicycling community. The Rochester Bicycle Master Plan was completed.
Arizona Forward Update
Finance Committee & City Council October 10, 2016
Effective Local Advocacy: Turning Ideas Into Action
STREETS & STORMWATER DEPARTMENT
River to Sea TPO Meeting US 92/International Speedway Boulevard
MPO Board Presentation
Presentation transcript:

PROPOSED HPD BIKE-PED MASTER PLAN HPD PRESENTATION

HPD: BIKE-PED ADVOCACY GROUP Promotes biking and walking as alternative transportation system Works for improved bike and pedestrian safety Encourages biking and walking as a healthier life style Designs comprehensive plans, legislation, and regulations to address the imbalance between cars and human powered transportation Works closely with city, state and local officials to accomplish dramatic change

2014 HAS BEEN A YEAR OF ACCOMPLISHMENT LDR rewrite City Resolution Bike safety awareness ride Local meet ups for bike enthusiasts I-95 – Atlantic Avenue reconstruction project Green Market Bike Corral Support for Boynton’s greenway efforts Master Plan and Phasing Conforms to Delray’s Comp Plan and Master Plans

HPD HAS WORKED WITH KEY PLAYERS City officials: Commission, Planning, Engineering, Sustainability, Parks, Police Presentation to GIAB in March Florida Department of Transportation (FDOT) Metropolitan Planning Organization (MPO) Lake Worth Drainage District (LWDD) Treasure Coast Regional Planning (TCRPC) Downtown Development Agency (DDA)

REQUEST TO GIAB Incorporate HPD Master Plan and Phasing into the City’s Bike Ped Master Plan Components of Master Plan Atlantic Avenue – CBD loop Intermodal access to Tri-Rail Access to beaches EW-NS grid of bike and walking paths enabling bike to work, school, and play Use of canals to connect east and west Delray

BICYCLE AND PEDESTRIAN MASTERPLAN SUMMARY VIEW

PHASE A Sharrows on Atlantic Ave (A1A to SW 12th Ave) Bike lane on Atlantic Ave (SW 12th Ave) to bike lane on Congress and Tri-Rail Station Bike lane and sidewalks George Bush Blvd from A1A to Federal Highway (or 2 nd Ave)

PHASE B Beach - Federal Loop by completing Bike Lanes on Federal Highway and to A1A along Linton Blvd. Begin E-4 Canal Project by utilizing city land (Golf Course and Atlantic High School). Create Interlocal Agreement with the Lake Worth Drainage District.

PHASE C E-4 Canal Greenway, El Rio Trail in Boca to North Lake Ida Park in Boynton E-4 Canal Greenway to Federal Highway Bike Lanes along Lowson Blvd / SW 10th Street. Create East-West Improved Alley Network north and south of Atlantic Avenue.

PHASE D E-4 Canal Greenway and existing bike lanes along Lake Ida/NE 4th Street to Federal Highway Create East West Improved Alley Network downtown connected to North South Alleys Begin Planning for L-36 and L-32 East-West Canals to connect to the E-4 Canal Greenway

WE APPRECIATE YOUR SUPPORT Greenway Downtown Beach