Welcome to El Dorado Hills. Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily.

Slides:



Advertisements
Similar presentations
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Advertisements

Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Utilization of the Regional Travel Forecasting EMME/2 Model for the Purposes of Long Range Transportation Planning Ontario EMME/2 Users Group Meeting April.
The State Route 246 Central Avenue Ext. and Purisima Road Traffic Study May 2008.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
New I-65 Interchange at Worthsville Road Welcome!.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Environmental Assessment Public Meeting
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Elk Grove – Rancho Cordova – El Dorado Connector Project Elk Grove – Ranch Cordova – El Dorado Connector Joint Powers Authority Project Briefing JPA Board.
Design Speed and Design Traffic Concepts
Workshop Presentation for Canyon County Jurisdictions for Canyon County Jurisdictions Corridor Management Plan.
Board of Supervisors General Plan Study Session Circulation Element Traffic, Circulation, Land Use Correlation Traffic, Circulation, Land Use Correlation.
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
Walking and Biking the Busiest Roads Around Atlanta: a Bike/Ped Plan that establishes non-motorized transportation among regional-scale priorities Regan.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
8th Mid-Atlantic Regional Planning Roundtable Arlington, VA March 30, 2012 PlanMaryland Maryland Department of Planning.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
Vicenç Pedret Cuscó Economic Adviser European Commission – DG MOVE Future of the European Transport Policy and Green Corridors Presentation at: TransBaltic.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Imagine the Possibilities… Vision from the 2002 Rail Plan.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Holly Springs Town Center Transportation Study & Plan Stakeholder Meeting # GPA FALL DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC.
RPS Modeling Results Presentation to RPS Policy Committee Brian Gregor Transportation Planning Analysis Unit June 6,
California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital Region.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Scenario S: Preferred Alternative. Scenario S: Creating Mixed-use Centers Around Major Transportation Areas Is The Primary Driver Of Improved Transportation.
Southern Bridge Project Brown County Executive
Noise or Annoyance? Is actual jet noise a problem? Or is the problem only present in complaints?
Purpose To develop and evaluate a range of transit and transportation alternatives throughout the MPO area, considering: u Regional Goals and Objectives.
High Desert Corridor -New State Route 138/E-220 Agency coordination Meeting March 2011 “We’re here to get you there!”
Slide Congestion Management Program Update Presentation to PPLC April 11, 2011.
Traffic Flow Parameters Surface Street Application.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Green Valley Corridor Road Network Issues  Regional traffic  Local traffic  Combined traffic.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
Atlanta Regional Commission Tom Weyandt, Department Director Comprehensive Planning May 2008.
Joint City Council/Planning Commission Workshop Workshop June 12, 2007 Folsom Annexation – South of Highway 50.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Presentation to Transportation Planning Board October.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
Summary of the WILMAPCO Congestion Management Process Prepared for T3 Webinar September 18, 2007.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Transportation System Comments Santolina Level ‘A’ Master Plan.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Induced Travel: Definition, Forecasting Process, and A Case Study in the Metropolitan Washington Region A Briefing Paper for the National Capital Region.
City of Pierce Welcome and Follow Up.
Chelan County Transportation Element Update
Downtown Valdosta Truck Traffic Mitigation Study
Regional Roads Committee
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
VicRoads – Movement & Place
Draft Transportation Element September 6, 2017
VicRoads – Movement & Place
Joint City Council/Planning Commission Workshop June 12, 2007
Downtown Valdosta Truck Traffic Mitigation Study
Southern Bridge Project Brown County Executive
Recommended Methods for Assessing VMT
Presentation transcript:

Welcome to El Dorado Hills

Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily evident from the perspective of Sacramento County and its cities Focus in on implications for Connector alignment in the El Dorado Hills area Offer recommendations, including two concepts to improve through traffic routing

Topics for the Connector in EDH Regional connections & through traffic Demand for road network capacity (traffic volume) Problems with through traffic on White Rock Road Available road network capacity Concepts for alternative Connector alignments

El Dorado Hills as a “traffic lens” Between two regions E/W through traffic limited to US 50 and Green Valley

El Dorado Hills as a “traffic lens” Between two regions E/W through traffic limited to US 50 and Green Valley Very low arterial density in comparison with Sac County

Road System Demand: population growth Actual EDH growth probably is closer to EDH 50% of County growth, not 88%. Data sets are based on different assumptions for housing occupancy.

Population growth as % of 1999 base year population

Demand for road system capacity: El Dorado County Population Growth Projections dating from the 2004 General Plan debate Actual Growth

Planned road system capacity growth compared to population growth Population estimates are for entire West Slope

El Dorado Hills, the 2010 CDP …with a highlight over the County Line

Existing EDH road network

Future EDH road network additions as currently planned Silva Valley interchange Empire Ranch Road Saratoga Silver Springs Country Club Connector

Existing traffic levels (2008) Average Daily Trips ± 2,500 30,000 25,000 20,000 15,000 10,000 5,000 Less than 2,500 93,000 68,000 61,000

Traffic count change rate change depicted by colored markers, percent increase or percent decrease since Time range covered is less where insufficient data exists +30% or more +20% to +30% +10% to +20% 0% to +10% -10% to 0% -20% to -10% -20% or more +36% +42% New, then -9% New, then +16% +211% +47% +42% +122% +138% New, then +15% -21% -27%

White Rock Corridor 2008 traffic counts 6,408 8,523 13,708 9,328 29,228 24, or 2007 traffic counts 18,144 8,817

Traffic count trends Average Daily Trips

White Rock Corridor An issue for regional Through traffic: Traffic Signals + 2 more existing signals Likely later Likely, Folsom SOI Likely later *

Connector/US 50 traffic balance in EDH & Folsom The Connector will divert traffic from US 50 US 50 will divert traffic from the Connector US 50 and Connector traffic will be independent Each may occur at different times Which of these will be true? Peak risk of congestion is in the afternoon peak period. Even with US 50 LOS F jams such as the one on the title slide, White Rock may be slower for through traffic.

Future EDH road network, currently planned

Future EDH road network, Connector suggestion #1

Future EDH road network, Connector suggestion #2

Alternative alignment concepts dismissed as unlikely to be viable Direct diagonal connection for through traffic across Folsom SOI Not planned by City of Folsom, City is very unlikely to replan SOI land use and circulation 2-mile tunnel below EDH for through traffic to bypass EDH surface streets Highly unlikely to be economically feasible

Recommendations Keep regional through traffic off of White Rock Road in EDH – Growth in through traffic plus local traffic will be a problem for both. Escalate joint planning among multiple agencies – especially for coordinated EDH/Folsom road network development. Specifically review need for arterials/feeders west of the EDH Business Park, including the eastern Folsom SOI area. In El Dorado County: Undertake substantial revision of planning to avoid future road network overloads Agencies: Connector JPA, El Dorado/Folsom JPA, City of Folsom, El Dorado County Transportation Commission, County of El Dorado, County of Sacramento, possibly Caltrans

General Plan amendments, two examples: 2.Amend Policy TC-3B to prioritize road network improvement. In Community Regions place high priority on planning and building new roadways to provide multiple paths with good interconnection in the road network. Prioritize reduction of end-to-end travel time by reducing use of measures such as traffic signals. Existing policy TC-3b: The County shall consider Transportation Systems Management measures to increase the capacity of the existing road network prior to constructing new traffic lanes. Such measures may include traffic signal synchronization and additional turning lanes. 1.Adopt criteria for target LOS, not just minimum LOS. Consider target LOS B, for most areas, C for commercial areas such as Town Center.

Not the end of traffic issues But nearly the exit for this presentation…

Best wishes for choosing that ideal EDH alignment for The Connector!!!