Facilitating trade growth and optimising operations at Port Hedland.

Slides:



Advertisements
Similar presentations
Container Ship Construction
Advertisements

Chin Iron Ore Industry in Pilbara Over last decade, growth in demand for iron ore has been underpinned by significant demand from China and other emerging.
July 2012 Q2 JANUARY TO JUNE 2012 STATISTICS SRI LANKA FREIGHT FORWARDERS ASSOCIATION.
Mr Kleber Silva – Executive Vice President, Head of Iron Ore - ArcelorMittal group December ArcelorMittal in Algeria at a glance UK- Algeria Investment.
Royalties for Regions – Information Briefing 10 October 2014 Presenter:David Horton Chief Operating Officer.
 5 ship docks designed for Aframax tankships 80K - 120K DWT  Mooring piles with quick-release capabilities  Mooring system analysis being conducted.
SSY OECD Steel Conference Shipping Market Outlook SSY May 2006.
Overall Office Assessment GAR RateRate Current Issues: (results of analysis) Low violent crime rates demonstrate that people living and working on Picatinny.
An Introduction to PETRONAS MARITIME SERVICES SDN BHD
Lumsden Point Development
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
SHIPPING,TRADE TRENDS AND THEIR IMPACTS ON PORT INFRASTRUCTURE
Frankie Yick HKSAR Legislative Councillor (Transport Functional Constituency) 26 th February, Hong Kong’s Shipping and Logistics Sector – Challenges.
Recent Hull Claim Trends The cause of recent claim trends: Crew, congestion and harder trade, or purely a matter of inflation? Astrid Seltmann CEFOR Analyst/Actuary.
Market Analysis & Forecasting Trends Businesses attempt to predict the future – need to plan ahead Why?
Risk Management Strategy For Large Scale Petroleum Operations In Orkney and Scotland Captain Graeme R Smith.
Server Virtualization: Navy Network Operations Centers
Savannah Harbor Expansion Project
Overview of Activities Freight and Logistics Council.
US Army Corps of Engineers BUILDING STRONG ® Charleston District Charleston Harbor Post 45 Deepening Feasibility Study Barbara Melvin Senior Vice President.
Seminar K M A 12 – 13 June 2007 Christer Bergquist – Kalmar Maritime Academy1 SAFE TRANSPORTATION AT SEA A Baltic Sea perspective – Requirements on vessels.
Underkeel Clearance (UKC) Project
University of Gothenburg, School of Business, Economics and Law, March 1, 2013 Global Containerized Maritime Shipping: Emergence and Divergence Jean-Paul.
Plan Formulation for Deep Draft Harbors Navigation Measures.
AFRICAN PORTS AND MARITIME CONFERENCE EASTERN & SOUTHERN AFRICAN CHALLENGES IN PORTS DEVELOPMENT CHALLENGES IN PORTS DEVELOPMENT PORT LOUIS HARBOUR Aruna.
Market Position Statement Voluntary Sector Forum 26 May 2015.
 LOCATION: -Located on the left side of Thi Vai river, 5 km from the confluence of Cai Mep Thi Vai and 29.7km (18 NM) away from the “ zero” bouy of Vung.
1 Ee Demands on Our Coal Industry Making the Case for 55 Foot Channels Bruce A. Hartshorn Hampton Roads Navigational Summit April 4, 2012.
® Xilinx Ireland Campus. ® Xilinx Ireland Campus Facility Details  Location : Dublin, Ireland  Campus Size : 30,000 m2.
Influence of Agricultural Policy on Chinese Food Economy TINGSI WANG.
Harbors Module NH2: Problem Identification, Inventory and Forecast, and Determination of Objectives and Constraints.
EQ1 EQ 2 EQ 3 EQ 4 EQ 5 EQ 6 EQ 7 EQ 9 EQ 8 EQ 10 WQ 1 WQ 2 WQ 3 WQ 4 WQ 5 WQ 6 WQ 7 WQ 8 VPT – Lay out Map Proposed berths V C T P L NOM LPG CAVERN OHP.
HANCOCK PROSPECTING Hope Downs Iron Ore Project The Current Status 7 th Annual Global Iron Ore & Steel Forecast Conference Perth, 2004 Russell Tipper –
Page 1 5th Meeting of the Inter-American Committee on Ports Organization of American States Wednesday, September 12, 2007 “Supply Chain Security and Trade.
EQ1 EQ 2 EQ 3 EQ 4 EQ 5 EQ 6 EQ 7 EQ 9 EQ 8 EQ 10 WQ 1 WQ 2 WQ 3 WQ 4 WQ 5 WQ 6 WQ 7 WQ 8 VPT – Lay out Map Proposed berths V C T P L NOM LPG CAVERN OHP.
LEIAAI 5-YEAR PLAN I.LEIAAI IN CY-2014 II.ENVIRONMENT SCAN III.5-YEAR PLAN A.Assumptions B.Broad objectives C.Specific objectives D.Program/project/activities.
Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008.
1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.
Maritime Saudi Arabia 2010 Agility Logistics.
Djibouti Ports – DP World Jérôme Martins Oliveira
Berlin Dr. Michael Stahl Michael Stahl Head of Economic Department GESAMTMETALL the employers’ association of the German metal and electrical industry.
Towage Procurement Process – Industry Briefing 05 May 2014.
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
1 Crisis and Opportunities in the Air Transport Sector Jamal Saghir Director Energy, Transport, Water The World Bank Beijing, China - 14 September 2009.
Monetary Policy in an Adverse Environment: Brazil 2002 Luiz Fernando Figueiredo Ciudad de Mexico October
Contents  Port Side handling of containers  Issues  New Levels of service standards.  Increasing Terminal Capacities.
1 Henrique de Campos Meirelles Davos, January 2004 Gearing Brazil for Growth.
MAP 21 Freight Talking Freight December 14, 2011 Leo Penne AASHTO.
Super Ultra Large Container Vessel Operations in the Port of NY/NJ
Nigeria’s Economic Outlook Getting out of the Recession: Cycles, Policies, and Economic Policy Lags Ayo Teriba CEO, Economic Associates
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
NET INCOME U.S. Scheduled Airlines $ Billions
Drewry “Container Forecaster”
SUPPORTING THE GROWTH OF EXPORT INDUSTRY TOWARDS A SUSTAINABLE MARITIME TRADE PRESENTED BY ABBA BELLO, MD/CE NIGERIAN EXPORT – IMPORT BANK (NEXIM)
Associated British Ports Marine Presentation
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
TRANSFORMATION AGENDA FOR MAJOR PORTS
OUR VISION World class seaport of choice
2018 ISPO Annual Conference Brisbane, Australia
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Agricultural Marketing
Agricultural Marketing
Agricultural Marketing
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Enhancing navigational safety in shipping lanes.
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
2013 Safety Group Advantage Program Timeline
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

Facilitating trade growth and optimising operations at Port Hedland

Licence to Operate – Safety ISO 4801 certification held at Port Hedland Lost Time Injury Frequency Rate (LTIFR) for FY Drug and Alcohol Testing Performance – FY14: 46,409 random blood and alcohol tests with 34 positives. Licence to Operate – Environment ISO certification held at Port Hedland IMS including ISO 9001 (2007) for Quality certification and ISO for Information Security.

Port Hedland - Historical trade growth 4140 vessels 12/ vessels 13/ Mt throughput # 2013/14 Average 27.5% annual growth in throughput (2010 – 2014) * Mt iron ore # Mt iron ore Mt throughput* 2012/13

Port Hedland - Historical trade growth * forecasting 27% in 2014 WA produces over one quarter of the world’s iron ore (26% in 2012). WA export volumes account for 42% of global shipments once domestic use is taken out.

Port Hedland - Iron ore export volumes ‘95 ‘96 ‘97 ‘98 ‘99 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07 ’08 ’09 ‘10 ’11 ‘12 ‘13 ’14 ‘15 ‘16 ‘17 Million tonnes Financial Year

Port Hedland - Economic importance WA mining royalties forecast for = $5.8B $3B derived through PH exports Total value of exports for 2014 FY = $35B * * Iron ore price at $95/tonne

Port Hedland – Operational performance Monthly throughput trending upwards - reached 1M tonnes per day by Dec 2013 Million tonnes

Port Hedland – Operational performance Single tide milestones : 6 Apr – 1,111,109t First one million tonnes on a single tide Progressive growth of tonnes shipped on each tide 4 June - 947,775t x 5C 18 June – 1,040,062t x 6C 24 Nov – 1,065, 483t x 6C 17 Dec – 1,052,446t x 6C 5 Nov – 1,056,597t x 6C 17 Nov – 1,083,210t x 6C 8 Mar – 1,007,164t x 5C 25 Oct – 1,062,515t x 5C + 1P 15 Jan – 1,059,740t x 6C 6 Apr – 1,111,109t x 6C 28 Apr – 1,025,962t x 5C 28 Apr – 1,002,143t x 6C C = Cape size P = Panamax 7 June – 1,270,721t x 7C 22 Apr – 1,057,711t x 6C 9 May – 1,105,015t x 5C 28 Apr – 1,025,962t x 5C 5 August - 1,029,766 x 6C

Port Hedland – Operational performance INCREASING VESSEL SAILING TONNAGES Hugo N (263,962 t) Abigail N (254,010 t) Wugang Innovation (247,906 t) Recent single shipment milestones: Maximum sailing draft has increased from 19.05m (Abigail N, 15 Nov 2012) to 19.65m (Hugo N, 5 Dec 2013) 15 Nov Nov Dec 2013

Port Hedland – Operational performance Facilitating larger vessels Fleet profile moving to larger vessels WozMax/ PH Max/ PSU Series/ N Series Recent DWT milestones at Port Hedland: 4 Oct Daniel N (297,359t) 2009/10: 10% of fleet > 200k DWT, nil > 250k DWT 2013/14: 27% of fleet > 200k DWT, 6% > 250k DWT 5 Nov Wugang Haoyun (299,385t) 17 Dec CSB Talent (315,041t) 15 Nov Abigail N (297,430t) 1 Feb 2014 – CSB Glory (315,063t)

Operational enhancements at Port Hedland Provides for minimum 90cm clearance Upgrades to DUKC system (Series V) Dynamic Under Keel Clearance System Tidal Range: 7m Current: 2-3 knots Depths: 14.8m (IH), 15m -16.6m (channel) Targeted dredge campaign:  Removal of siltation allowance  High spot dredging in Inner Harbour  Revision of tidal model Net average benefit = 71cm = 14,000t/vessel = $1.5 million/vessel Specialised Dredging Campaign

Operational enhancements at Port Hedland Increased departure window from 3.5 hours to 4.5 hours - with 30min gaps Capacity to increase number of vessel departures from 6 to 8 Increased tidal departure window as a result of Port enhancements Increased towage requirements and provisions On departure, four tugs escort to Hunt Point, three tugs escort to Beacon No. 30/31 Channel width at Hunt Point = 183m Nineteen tugs required to manage ≥ 460Mtpa In 2009: 10 tugs (stern-drive) 2014: tugs (8-9 rotor tugs)

Future Port Hedland Port Initiatives Channel escape areas - shorter departure windows (30mins 20mins) 400m survey outside channel (complete) Real time data feed to Portable Pilot Units (complete) Improved tidal network & DUKC Series V (complete) Significantly improved channel transit management Channel Enhancements

Future Port Hedland Port Initiatives Partnership with HR Wallingford – to operate an advanced ship navigation and maritime simulation facility in Fremantle. Optimisation of marine operating procedures, and professional development and training of individual pilots, tug masters and port staff. Vessel traffic services (VTS) simulator plus six real time ship simulation bridges (including four dedicated tug bridges) Advanced site familiarisation and scenario based emergency and failure training. World-class Maritime Simulation Facility

Ports Review – Pilbara Ports Authority Operational Benefits: Single entity oversight of all shipping across the Pilbara region Leverage operational capabilities, e.g. Dredge Manager, and engineering oversight Development Benefits: Single point of contact for proponents Streamlining of processes, e.g. environmental and DA processes Strategic Objectives As of 1 July consolidates all ports across (11 in total) the Pilbara region Dampier Port Authority ( ) = Mt Iron ore = Mt Gas products = 20.1 Mt

Operating Models

Values: ExcellenceRespectIntegrityCare Courage PPA Organisational Structure “A functional risk and governance architecture”

Pilbara Ports Authority Port Hedland Dampier