BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Capabilities – What we can do for you. Dawsons Training is a part of The Dawsons Group of Companies which is one of Australias largest privately owned.
Student Placement Health & Safety Briefing Nick Izzard Health & Safety Adviser FAHS, FML & GSA.
April 23rd-24th 2013Handling Engineering Group. Visit schedule – April 23 rd April 23rd-24th 2013Handling Engineering Group2 Prevessin site Visit of PR559.
GA Tech Safety and Health Consultation Program FALL PROTECTION.
The ice machines are available at various capacities and can be placed where needed in the site. Capacities range from 3 to 70 tons per day. The ice is.
R. Rinaldesi, K. Kershaw – HE Group
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
Slide #1 Facilitated Discussion: MOL / OHSA Requirements for “Fall Protection” Occupational Health and Safety Act - R.R.O. 1990, REGULATION 851  INDUSTRIAL.
BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Copyright ©2009 Progressive Business Publications 1 Personal Protective Equipment (PPE)
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
2015 HM section activity Helder Lourenço. E119/EN Maintenance Contract Maintenance services on industrial trucks on the CERN site 1700 assets (CH,CS,LV,RTL,RTH,RH,TP,DS)
LEA 27 August 2008D.LACARRERE1 BUFFER AREA FOR SLIGHTLY RADIOACTIVE COMPONENTS Underground - UXA Zone (protected area) Under DELPHI Barrel UXAUXB.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Lifting Operations & Lifting Equipment. LOLER 98  Lifting Equipment must be of adequate strength & stability, as must the load itself  Lifting equipment.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
OSHA Compliance Presented By; Rob Hecker-Safety Liaison Division of Construction.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
General Safety Chapter. Hearing Protectors Hearing Conservation What are the effects of noise? Is hearing loss painful? When should I wear hearing protection?
PPE: Face, Head, Foot, and Hand The participant will better understand the various types of PPE and their importance as laid out by OSHA.
COMPANY – MS1 Rack Options Site Visit & Warehouse Storage System Evaluation Design/Build for Warehouse Storage Systems Warehouse Space Planning Building.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Working at Height Scissor lift, Boom lift and Vehicle mounted platforms Design Specifications.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
EN-CV interventions during YETS
Working / walking on a roof
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
Laboratory Safety Deona Willes, MPH Deputy Director Office of Environmental Health and Safety I Environmental.
EN-HE Group meeting 19 th June 2015 I. Rühl / EN-HE.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Technical Specification Handling Engineering Group.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
LHCb Radiation Shielding Wall – Lifting Tool Overview.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
INFRASTRUCTURE CHANGES AND UPGRADES Presented by: Fernando Baltasar dos Santos Pedrosa in the name of the four LHC experiments.
BUDGET 2012 EN-HE 29/03/ EN-HE CONTRACT LIST - OPERATION7’190 KCHF - PROJECT1’738 KCHF - CONSOLIDATION 4’239 KCHF JMS.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Sale of material salvaged from the LEP experiments 4 large experiments ALEPH DELPHI L3 OPAL The 4 detectors are situated in caverns (100 m under ground.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
Fall Protection Simulator. Key items to cover for traveling on a beam without a lifeline include: Zachry Best Practice: Employee shall be instructed in.
Gantry Crane Gantry Crane  Rosava Engineering Group presents the Gantry Crane. We provide cranes.
Some arrangements for personnel safety 1- Procedures for access
Safety in the Neutrino Platform Hall
CLIC Handling Engineering Update
Updated Design of Detector Hall
IT-4189 Supply and installation of a cryogenic distribution system
EN-Handling Engineering Group
FCC lifts Layout, characteristics etc.
EN-HE Group meeting 4th December 2015
EN-HE SPS works during EYETS
IT-4328: Technical Specification
Most Frequently Cited Serious Violations
Personal Protective Equipment
Click anywhere to get started…
Most Frequently Cited Serious Violations
Work at Height January 29, 2019 Paraic Brennan
Presentation transcript:

BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January 14th-15th 2014 Handling Engineering Group2 Site Visits

Visit Schedule - January 14 th January 14th-15th 2014 Handling Engineering Group3 Bonfanti / Meloni + J.P. Granchelli / H. Lourenço / R. Rinaldesi Brunnhuber / Brun-Mech + O. Boettcher / G. Roche / A. Kertesz – PR712 in building SD4 PR68, PR76 and PR82 in Meyrin – 18.00PR68, PR76 and PR82 in MeyrinPR712 in building SD4

Visit Schedule - January 14 th January 14th-15th 2014 Handling Engineering Group4 Crane PR BuildingLocation / extent of visitInstallation type A PR712 SD4 Surface hall, access on cranes for inspection Building with space constraints C PR Surface hall, no access on crane foreseen Building without space constraints B PR Surface hall, no access on crane foreseen Building with space constraints EPR82168 Surface hall, no access on crane foreseen Building with space constraints

Visit Schedule - January 15 th January 14th-15th 2014 Handling Engineering Group5 Bonfanti / Meloni + J.P. Granchelli / H. Lourenço / R. Rinaldesi Brunnhuber / Brun-Mech + O. Boettcher / A. Kertesz / G. Roche 9.00 – 10.00PR720 in cavern UX85 PR725 in building SX – PR725 in building SX8 PR720 in cavern UX85

Visit Schedule - January 15 th January 14th-15th 2014 Handling Engineering Group6 Crane PR BuildingLocation / extent of visitInstallation type D PR720 UX85 Cavern crane, no access on crane foreseen Underground areas FPR725SX8 Surface hall, access on cranes for inspection Building without space constraints

Hazards Access to railways and cranes at ~10 from the ground Underground areas Access to radiation areas January 14th-15th 2014 Handling Engineering Group7

Measures Personal Protective Equipment: safety shoes, helmet Fall-arrest harness (with lanyard) Dosimeters (escort only) All visitors shall be authorized by their employer to work in height and use a harness All visitors shall be authorized by their employer to work in radioactive areas January 14th-15th 2014 Handling Engineering Group8